Vous êtes sur la page 1sur 1

1-1/2"

CHWR
Vent
PSV

PSV set @ 5 barg


Process
Sewer
Vent Filter (Heated) 1"
LPS
Vent 2" Pset = 6 barg @22oC
TCV LPS Supply at 3 barg
Water from RO 3/4" 1-1/2" PSE
system V-6 2" 102
V-5 HEX-102 Heater/Cooler
PSE FIT

Previous setting for PSE70 101


2" V-4 2"
+ 3.4 barg (50 psig)
-0.25 barg (-3.6 psig / 100 in. WC)
E70A
V-1 DP (S&T) = 6 barg
o
1-1/2" DT (S&T) = 165 C
4" Sampling
Process Point Condensate Return at 1 barg
Sewer T COND
1"
Process 2.9 m
TK101 Sewer
Purified Water Storage Tank
DP = -0.7barg / +3.5 barg 1-1/2" CHWS
DT = 95oC TCV
Vol. = 3.5 m3

PW Distribution Loop

2.6 m
(8.45 ft)

V-2 2"
150mm (6") above grade

P103 Circulation Pump


V-3 Shut-off head = 5.47 barg (54.7 m W.C.)
Normal conditions: 14 m3/hr, TDH 50 m W.C.
Process Sewer

Vous aimerez peut-être aussi