Académique Documents
Professionnel Documents
Culture Documents
Header Details
* Add another row for Production Overheads – OH Calculation based on Production Costs
Cost Element
619000 DAA Production Dir. Int. Act. Alloc. Production
620000 DAA Machine Costs Dir. Int. Act. Alloc. Machine Costs
623000 DAA Burn In Dir. Int. Act. Alloc. Burn In
625000 DAA Setup Dir. Int. Act. Alloc. Setup
Header Details
Overhead rate is maintained in overhead key in Cost Sheet Costing Rows for a specific
period for a Controlling Area.
For example
FG Material – 1
We can capitalize the exchange rate fluctuation on material thru Over head by using cost center.
A cost center is assigned to a overhead key in Cost Sheet.
Create New Cost Comp Structure J1 (Copy from Cost Comp. Structure – 01)
Select J1 Cost Comp. Structure & click on Assignment: Cost Component - Cost Element Interval
Ensure the component structure should always be Active. Normally if any change is made in
Structure it becomes inactive by default. We have to make the Cost Comp. Structure active
again.
Click New Entries Assign the Cost Elements from- to with Cost Sheet Rows (Refer to the Cost
Sheet). Here we assign the combination of Cost sheet Rows to the Cost Comp Structure. In this
case we have assigned the combination of Cost sheet – “COGMT” to Cost Comp. Structure –
“J1”. And also here we combine the GL, Cost Comp. Structure, Chart of Accounts & Cost sheet
rows.
Cost Component
Chart of Accounts
Cost Element
Select the Cost Comp Structure & click on Cost Component views
Click on
Select Cost Comp. structure J1 & click on Assignment Organization unit – Cost component
structure.
For example
If Controlling Area is one with multiple company codes and multiple cost Component structures
we can assign specific Cost Component structure to a specific Company Code. So that particular
Cost sheet specific to the company code is picked up.
Select the Cost Comp. structure J1 & click on Cost Component Group
Click on details
Click here
Header Details
Click on details
Click here
Click here
Refer to Cost Comp. Structure Cost Component views we had assigned this combination.
Click on details
Click here
Click here
Header Details
Click on details
Header Details
Click on details
Click on details
Work In Process
When an order is confirmed and settled while doing the TECO (Technical Completion)
of Production Order RA Key (FERT) – (TECO) reversal of WIP accounting entry is
posted.
Header Details
Define Assignment
Header Details
Click on New Entries Copy ReqToCAP with “FK” & Sub mask the masked Cost Elements with
all ++++++++++ with valid from date.
In Assignment of Cost Element for WIP we attach a Cost Elements by masking the cost elements
with a Line ID in the required column (RA Category)
A RA Key is defined to an order type, when order is created RA key is captured in order.
Define Update
Header Details
Variance Calculation
Description: Define Valuation Variant for WIP and Scrap (Target Costs)
Transaction Code: SPRO
Menu Path: IMG Controlling Product Cost Controlling Cost Object
Controlling Product Cost by Order Period-End Closing
Variance Calculation Define Valuation Variant for WIP and
Scrap (Target Costs)
Client dependent settings: Yes / No
Settlement
Following are mandatory fields to be maintained in Material Master for Product Costing
Following are mandatory fields to be maintained in Material Master for Product Costing
A warning message can be ignored (In-house production time is 0 for material produced in-
house)
No entry is required
Save.
Material
Plant 1000
BOM Usage 1 (Production)
Save
Basic Data
Activity Unit (H) Hour
Cost Center Catg * For all cost center categories
Allocation default values
Activity Type 1
Allocation of cost element Secondary Cost element which is used for allocation
Cost Center & Activity combination should be same as mentioned in KP26 (Activity Planning)
Header Details
T.6. Routing
Header Details
Click on Routings
Work Center
Control Key PP01
SAVE
Header Details
Enter
Enter
Period
Fiscal Year
Company Code
Plant
Material
Execute F8
Enter
Company Code
Plant
Material
Execute release in test Run
When we update the price & release the future cost estimate in Material Master
Material
Plant
Order Type PP01 (Standard Production Order (int. number))
Total Qty
Finish Date
Start Date
Click on to Release the Production Order & Click on for Cost Order.
Click on Goto
We get Cost analysis for the Plant, Material & for Planned Qty
Save
For testing purpose we shall take Open Stock with Movement 561 for plant.
Description:
Transaction Code: MB1A
Menu Path: Logistics Production Production Control Order Create
Enter the Production Order & Click on Reservation & Enter the Reservation No (Refer to
Production Order Assignment Tab.
System shall automatically pickup the Material & Qty mentioned in Production Order.
Save
Accounting Entries
Header Details
Settlement Rule
Accounting Entries
Header Details
Activities
Machine Actual Machine Hours utilized
Click on Goods Movement & Save
Header Details
Save
Accounting Entries
Header Details
Header Details
Description:
Transaction Code: KO88
Menu Path: Logistics Production Production Control Order Create
Accounting Entry