Vous êtes sur la page 1sur 4

8 7 6 5 4 3 2 1

3
H 1693 H

3
2058 846
UP 178.63° SHARP

G G

R5456
SITI2_TRIFURCATION
1300 1801 3
INLET PIPE-1
30mm 3
F R630 F
2

A
A
A-A
B
E 3 SITI2_TRIFURCATION B E
30
1689 INLET PIPE-2
30mm
3 R462
6
3
639
1050
U
P
D 17 D
8.
63
°
SH
AR
P
3
1615

C C
A A

NOTE:
1. Additional 75mm for all cutting edges will be added

All dimentions are PROJECT:


B 4 Some dimentions were added in to page number SS HW LG 26-Dec-2018 in mm
SITI-2 B
3 and 4 ISO mK 2768
3 Some dimentions were added SS HW LG 22-Oct-2018 SCALE:
QUANTITY: 1 MATERIAL
S355 J2+N 1:35
2 Flat Pattern's radius and note 2 was added SS HW LG 19-Oct-2018 ID: TS18-H6TR-100.100 MASS
1 Thickness was changed SS HW LG 18-Oct-2018 DESIGNED: TITLE
SS REV:
0 Preliminary Drawing SS HW LG 12-Oct-2018 TRF 4
CHECKED:
A HW SHEET A
REV. DESCRIPTION Drawn Checked Approved DATE
DWG NO. :
1/4
APPROVED: TRF_00_01 SIZE
REVISION LG A4
8 7 6 5 4 3 2 1
REV: 00
8 7 6 5 4 3 2 1

H H

10
00
3

P
G 78 24 AR G
32 29 SH

8.6
3 3
7 17 1
25 9 N 70
14 W R5
O
D

F SITI2_TRIFURCATION
F
OUTER PIPE UPPER-1
25mm

3 66 25
14
5
B-B 20
B R4 B
B
E E
A
17

3 A
98

54 SITI2_TRIFURCATION
14 OUTER PIPE UPPER-2
25mm
D D
D1
25
DOWN 178.63° SHARP

C C
NOTE:
1. Additional 75mm for all cutting edges will be
added
2. Diameter in the middle area where a sharp cut is
visible ( 25mm before the cut) = D1 = 1359mm

All dimentions are PROJECT:


B in mm B
B SITI-2
ISO mK 2768
3 Some dimentions were added SS HW LG 22-Oct-2018 SCALE:
QUANTITY: 1 MATERIAL
S355 J2+N 1:35
2 Flat Pattern's radius and note 2 was added SS HW LG 19-Oct-2018 ID: TS18-H6TR-100.100 MASS
1 Thickness was changed SS HW LG 18-Oct-2018 DESIGNED: TITLE
SS REV:
0 Preliminary Drawings SS HW LG 12-Oct-2018 TRF 4
CHECKED:
A HW SHEET A
REV. DESCRIPTION Drawn Checked Approved DATE
DWG NO. :
2/4
APPROVED: SIZE
REVISION LG TRF_00_04 A4
8 7 6 5 4 3 2 1
REV: 00
8 7 6 5 4 3 2 1
4
3193
H H
3 P
AR
97 SH
14 ° 3
62
8. 70
1
17 SITI2_TRIFURCATION
R5
N
W MIDDLE PIPE _2
G O G
D 25mm 1376 1000
5
20
R4

B
B
F 25
A F
A C-C 1500
SITI2_TRIFURCATION
MIDDLE PIPE _1 3
25mm 1743
1474 3
E E

DOWN 178.62° SHARP

4
1784
D D1 D
C C

25

C C
NOTE:
1. Additional 75mm for all cutting edges will be
added
2. Diameter in the middle area where a sharp cut is
visible ( 25mm before the cut) = D1 = 1359mm

All dimentions are PROJECT:


B in mm
SITI-2 B
ISO mK 2768
4 Some dimentions were added SS HW LG 26-Dec-2018 SCALE:
QUANTITY: 1 MATERIAL
1:35
3 Some dimentions were added SS HW LG 22-Oct-2018 ID: TS18-H6TR-100.100 S355 J2+N
MASS
1 Thickness was changed SS HW LG 18-Oct-2018 DESIGNED: TITLE
SS REV:
0 Preliminary Drawing SS HW LG 12-Oct-2018 TRF 4
CHECKED:
A HW SHEET A
REV. DESCRIPTION Drawn Checked Approved DATE
DWG NO. :
3/4
APPROVED: TRF_00_06 SIZE
REVISION LG A4
8 7 6 5 4 3 2 1
REV: 00
8 7 6 5 4 3 2 1

H H

UP 178.63° SHARP
4
1798

G G
4 2
3278
R4205
SITI2_TRIFURCATION
2 OUTER PIPE LOWER-1
25mm B
5 56 B
F D R4
01 F
R57
3

A
A SITI2_TRIFURCATION
OUTER PIPE LOWER-2 P
25
E 25mm AR E
SH
D-D 1000
6 3°
8.
17 1497
P
U

D1
D 25 D
1460

3
D
C NOTE: C
1460 1. Additional 75mm for all cutting edges will be
added
3 2. Diameter in the middle area where a sharp cut is
visible ( 25mm before the cut) = D1 = 1359mm

All dimentions are PROJECT:


B 4 Some dimentions were added SS HW LG 26-Dec-2018 in mm
SITI-2 B
ISO mK 2768
3 Some dimentions were added SS HW LG 22-Oct-2018 SCALE:
QUANTITY: 1 MATERIAL
S355 J2+N 1:35
2 Flat Pattern's radius and note 2 was added SS HW LG 19-Oct-2018 ID: TS18-H6TR-100.100 MASS
1 Thickness was changed SS HW LG 18-Oct-2018 DESIGNED: TITLE
SS TRF REV:
0 Preliminary Drawing SS HW LG 12-Oct-2018 4
CHECKED:
A HW SHEET A
REV. DESCRIPTION Drawn Checked Approved DATE
DWG NO. :
4/4
APPROVED: TRF_00_08 SIZE
REVISION LG A4
8 7 6 5 4 3 2 1
REV: 00

Vous aimerez peut-être aussi