This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 2 of 22
REVISION HISTORY
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 3 of 22
TABLE OF CONTENTS
1 INTRODUCTION ............................................................................................4
2 OBJECTIVE ...................................................................................................4
3 SCOPE .........................................................................................................4
4 REFERENCES ................................................................................................4
4.1 Internal References ...................................................................................4
4.2 External References ...................................................................................5
5 ORDER OF PRECEDENCE ................................................................................5
6 REQUIREMENTS ............................................................................................5
7 SPECIFIC REQUIREMENTS ..............................................................................5
7.1 Engineering & Design .................................................................................6
7.2 Fabrication ...............................................................................................7
7.3 Installation ...............................................................................................7
8 DELIVERABLES .............................................................................................7
8.1 Engineering ..............................................................................................7
8.1.1 Modification projects ..............................................................................7
8.1.2 EPC Contracts .......................................................................................8
8.2 Document Control .....................................................................................8
8.2.1 Modification projects ..............................................................................8
8.2.2 EPC Contracts .......................................................................................8
9 TERMS, ABBREVIATIONS & ACRONYMS ............................................................9
9.1 Terms ......................................................................................................9
9.2 Abbreviations & Acronyms ..........................................................................9
APPENDIX A: TOPSIDES – INCL. CELLAR DECK AND BRIDGES .................................11
APPENDIX B: JACKETS .......................................................................................18
APPENDIX C: PIPELINES AND RISERS ..................................................................20
APPENDIX D: CHANGES SINCE REVISION 12 ........................................................22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 4 of 22
1 INTRODUCTION
This Documentation Instruction (DOS) applies for the Danish Business Unit (DBU).
The Documentation Instructions are a set of Mærsk Olie og Gas AS (Maersk Oil)
Instructions, comprising formal requirements and guidelines for the preparation of
documentation.
2 OBJECTIVE
The objective of DOS A-03 is to ensure consistent format and layout of the design
documentation, and to ensure that an Engineering Dossier is delivered to Maersk Oil.
DOS A-03 applies for both design of new installations and for design modifications to
existing platforms. It is emphasised that engineering design shall be controlled in a
proper way, especially with regards to safety critical documents, as described in section
7.1 – Engineering & Design.
3 SCOPE
DOS A-03 provides general and specific requirements to the design and engineering
documentation, and to the required Engineering Dossier.
4 REFERENCES
All regulations, codes and standards, etc. referred to in this part shall apply in latest
edition, unless otherwise stated.
Reference is made to DOS A-00, User Guideline where other instructions, relevant for
preparation of documentation, are summarised.
This Documentation Instruction does not relieve contractors or manufacturers of their
responsibility to retain documents as required by the governing code.
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 5 of 22
Title Reference
1 N/A N/A
5 ORDER OF PRECEDENCE
In document YYYY-00-06003-0000 – Directives, Acts and Codes Matrix a simple overview
can be obtained according to Codes and Standards Construction, Design and Equipment,
which is described in DK-EP-STD-0038
The order of precedence for regulations referred to shall be:
EU Directives and Regulations
National Acts and Orders
Harmonised or international standards
Company standards and guidelines
6 REQUIREMENTS
Selection of the required documentation shall be made prior to commencement of the
work, and shall be carried out by excluding the not required documentation as per:
Appendix A: Topsides – incl. cellar deck and bridges
Appendix B: Jackets
Appendix C: Pipelines and Risers
7 SPECIFIC REQUIREMENTS
The documentation shall be compiled under one of the following headings:
Engineering & Design
Fabrication
Installation
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 6 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 7 of 22
7.2 Fabrication
Detailed Design, updated to AS-BUILT
The Fabrication Contractor shall update the Engineering Dossier to AS-BUILT. The
Fabrication Contractor is allowed to define the documentation as ONSHORE AS-BUILT,
especially if the documents are changed during offshore installation.
7.3 Installation
Installation and HUC Design, updated to AS-BUILT
The Installation Contractor shall update the Installation Package to AS-BUILT. The
package shall contain all updates to the Engineering Dossier, if any.
All drawings, reference databases for 3D CAD models, computer-generated databases,
calculations, reports and engineering lists shall be updated to the agreed status as
computer activities.
Revision numbers for drawings, calculations, reports and lists etc. shall be raised one
higher, and stamped AS-BUILT prior to hand-over of the Engineering Dossier.
The drawing index shall be updated with details of AS-BUILT revision and added or
deleted drawings.
Reference is made to the appendixes detailing the contents of the above mentioned
documentation.
8 DELIVERABLES
The deliverables shall include all the listed documentation regardless if the
documentation during progress of work has been handed over for comments, approval
or information, even if otherwise agreed.
Electronic files shall be delivered to Maersk Oil in a suitable media. The media shall fit
to the amount of data, and shall be an international recognized type. If e-mail is used
the amount of data must not exceed 10 Mb. The chosen media must be approved by
Maersk Oil, Document Control, and upon request the media can be returned if wanted.
8.1 Engineering
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 8 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 9 of 22
9.1 Terms
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 10 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 11 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 12 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 13 of 22
- Switchboard Layout X X
- Cable List X X X
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 14 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 15 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 16 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 17 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 18 of 22
APPENDIX B: JACKETS
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 19 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 20 of 22
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 21 of 22
- Installation Analysis X
- Installation Procedure Report X
*1) The documents shall be certified as per requirements in the certification
contract.
*2) A preliminary HAZOP, HAZID/ALARP is required to enable the early identification
of any major safety issue.
*3) HAZOP and QRA shall be updated if there is significant change to certificate
package which may cause a safety issue.
*4) Weight report format to be agreed with Structural Department – Topsides.
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 22 of 22
Note
Major alterations are shown as ¤ identified with a number and are mentioned under
"SPECIFIC" on this revision page (ex. ¤1)
Minor alterations where the meaning of the content is unchanged are not shown.
GENERAL
Standard renamed to Instruction DK-FP-INS-0009 – Replace DK-EP-STD-0004.
SPECIFIC
¤1 Appendix A – Electrical, Cable sizing calculations added.
¤2 Appendix A – Instrumentation, SIL calculations added.
¤3 Appendix A – New HVAC discipline added.
This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.