Vous êtes sur la page 1sur 22

Documentation Instruction

Design & Engineering (DOS A-03)


DK-FP-INS-0009 Rev. 13.0

Effective from: 01 August 2016


Effective to: 01 August 2019

Document Focal Point: Knud Lund Pallesen


Head of Document Control
KLP006

Approver: Per Bagge Angelo


Head of Facilities & Projects
PBA011

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.
Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 2 of 22

REVISION HISTORY

Revision Date Notes


13.0 01/08/2016 Standard renamed to Instruction – Replace DK-EP-STD-
0004. Updated as stated in Appendix D
12.0 09/05/2014 Updated as stated in Appendix D

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 3 of 22

TABLE OF CONTENTS

1 INTRODUCTION ............................................................................................4
2 OBJECTIVE ...................................................................................................4
3 SCOPE .........................................................................................................4
4 REFERENCES ................................................................................................4
4.1 Internal References ...................................................................................4
4.2 External References ...................................................................................5
5 ORDER OF PRECEDENCE ................................................................................5
6 REQUIREMENTS ............................................................................................5
7 SPECIFIC REQUIREMENTS ..............................................................................5
7.1 Engineering & Design .................................................................................6
7.2 Fabrication ...............................................................................................7
7.3 Installation ...............................................................................................7
8 DELIVERABLES .............................................................................................7
8.1 Engineering ..............................................................................................7
8.1.1 Modification projects ..............................................................................7
8.1.2 EPC Contracts .......................................................................................8
8.2 Document Control .....................................................................................8
8.2.1 Modification projects ..............................................................................8
8.2.2 EPC Contracts .......................................................................................8
9 TERMS, ABBREVIATIONS & ACRONYMS ............................................................9
9.1 Terms ......................................................................................................9
9.2 Abbreviations & Acronyms ..........................................................................9
APPENDIX A: TOPSIDES – INCL. CELLAR DECK AND BRIDGES .................................11
APPENDIX B: JACKETS .......................................................................................18
APPENDIX C: PIPELINES AND RISERS ..................................................................20
APPENDIX D: CHANGES SINCE REVISION 12 ........................................................22

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 4 of 22

1 INTRODUCTION
This Documentation Instruction (DOS) applies for the Danish Business Unit (DBU).
The Documentation Instructions are a set of Mærsk Olie og Gas AS (Maersk Oil)
Instructions, comprising formal requirements and guidelines for the preparation of
documentation.

2 OBJECTIVE
The objective of DOS A-03 is to ensure consistent format and layout of the design
documentation, and to ensure that an Engineering Dossier is delivered to Maersk Oil.
DOS A-03 applies for both design of new installations and for design modifications to
existing platforms. It is emphasised that engineering design shall be controlled in a
proper way, especially with regards to safety critical documents, as described in section
7.1 – Engineering & Design.

3 SCOPE
DOS A-03 provides general and specific requirements to the design and engineering
documentation, and to the required Engineering Dossier.

4 REFERENCES
All regulations, codes and standards, etc. referred to in this part shall apply in latest
edition, unless otherwise stated.
Reference is made to DOS A-00, User Guideline where other instructions, relevant for
preparation of documentation, are summarised.
This Documentation Instruction does not relieve contractors or manufacturers of their
responsibility to retain documents as required by the governing code.

4.1 Internal References


The Maersk Oil Documentation Instruction, Technical Standards, Procedures and
Guidelines detailed below are referenced within this instruction.

Document Name Document ID


1 Codes and Standards Construction, Design and DK-EP-STD-0038
Equipment
2 Management of change for Design Modification , DK-EP-PRO-0008
PRO-0002
3 Dispensation Request Form Procedure DK-FP-DOC-PRO-0001
4 Management of documentation for Modification DK-EP-GDE-0011
Projects, (GDE-0010)
5 Clouds and Revision Triangles on Maersk Oil DK-EP-GDE-0004
Drawings, (GDE-0018)
6 User Guideline, (DOS A-00) DK-FP-INS-0006
7 Engineering Drawings & Legends, (DOS A-01) DK-FP-INS-0007
8 Engineering Lists, (DOS A-02) DK-FP-INS-0008
9 Tag Numbering, (DOS A-10) DK-FP-INS-0015

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 5 of 22

10 Calculations and Reports, (DOS A-12) DK-FP-INS-0016


11 Location and System Codes, (DOS A-13) DK-FP-INS-0017
12 Line Numbering, (DOS A-14) DK-FP-INS-0018
13 Cable Numbering, (DOS A-15) DK-FP-INS-0019
14 CAD Systems, (DOS A-23) DK-FP-INS-0022
15 Electronic Documents, (DOS A-25) DK-FP-INS-0023
16 Directives, Acts and Codes Matrix YYYY-00-06003-0000

4.2 External References

Title Reference
1 N/A N/A

5 ORDER OF PRECEDENCE
In document YYYY-00-06003-0000 – Directives, Acts and Codes Matrix a simple overview
can be obtained according to Codes and Standards Construction, Design and Equipment,
which is described in DK-EP-STD-0038
The order of precedence for regulations referred to shall be:
 EU Directives and Regulations
 National Acts and Orders
 Harmonised or international standards
 Company standards and guidelines

6 REQUIREMENTS
Selection of the required documentation shall be made prior to commencement of the
work, and shall be carried out by excluding the not required documentation as per:
 Appendix A: Topsides – incl. cellar deck and bridges
 Appendix B: Jackets
 Appendix C: Pipelines and Risers

7 SPECIFIC REQUIREMENTS
The documentation shall be compiled under one of the following headings:
 Engineering & Design
 Fabrication
 Installation

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 6 of 22

7.1 Engineering & Design


 Conceptual Design
 Certification Design
 Construction Tender Package
 Detailed Design
 Fabrication Package
 Installation Package
The Maersk Oil procedure DK-EP-PRO-0008 - (PRO-0002), Management of change for
Design Modifications, describes how to control design modifications on all Maersk Oil
offshore installations in production in the Danish North Sea. It is very important that all
modifications are developed and executed correctly, with respect to engineering check
and verification, documentation update in general and special revision control for safety
critical documents.
DK-EP-PRO-0008 - (PRO-0002) ensures that revisions of critical documents are
accessible and status on AS-BUILT updates are transparent for all, and all changes to
critical documents are reviewed and authorised by responsible function before
implementation
DK-EP-GDE-0011 - (GDE-0010), Management of documentation for modification
projects, gives a description of how to manage the documentation; especially how to
check-out drawings to ensure that the right version is used and that information is
given to other projects.
If a deviation is discovered on an existing drawing (from line walks etc.), which is not
related to the ongoing project, this shall be clearly marked on the drawing. Reference is
made to guideline DK-EP-GDE-0004 – (GDE-0018), Clouds and revision triangles on
Maersk Oil drawings, section 7.5.
During the design phase the Engineering contractor must deliver design package(s) and
drawing(s) to Maersk Oil for 3rd part verification and for Maersk Oil approval. Especially
P&IDs and C&Es shall be subject for approval. When these approvals are obtained, a
copy is uploaded to the Maersk Oil database. Reference is made to section 8,
Deliverables.
To ensure the quality of the design packages and drawings in pdf version, the
documents shall be delivered according to the requirements in DOS A-25, Electronic
Documents. It must clearly emerge from the documents, who have prepared the
document, and who have performed the quality assurance (Check & Approval).
The Engineering Contractor shall prepare an Engineering Dossier. The Engineering
Dossier contains all the detail design documentation. The content of the Engineering
Dossier is shown in Appendix A: Topsides, Appendix B: Jackets or Appendix C: Pipelines
and Risers.
A link to an excel sheet, which gives the content of the Engineering Dossier, is given at
the left hand top of each appendix.

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 7 of 22

7.2 Fabrication
 Detailed Design, updated to AS-BUILT
The Fabrication Contractor shall update the Engineering Dossier to AS-BUILT. The
Fabrication Contractor is allowed to define the documentation as ONSHORE AS-BUILT,
especially if the documents are changed during offshore installation.

7.3 Installation
 Installation and HUC Design, updated to AS-BUILT
The Installation Contractor shall update the Installation Package to AS-BUILT. The
package shall contain all updates to the Engineering Dossier, if any.
All drawings, reference databases for 3D CAD models, computer-generated databases,
calculations, reports and engineering lists shall be updated to the agreed status as
computer activities.
Revision numbers for drawings, calculations, reports and lists etc. shall be raised one
higher, and stamped AS-BUILT prior to hand-over of the Engineering Dossier.
The drawing index shall be updated with details of AS-BUILT revision and added or
deleted drawings.
Reference is made to the appendixes detailing the contents of the above mentioned
documentation.

8 DELIVERABLES
The deliverables shall include all the listed documentation regardless if the
documentation during progress of work has been handed over for comments, approval
or information, even if otherwise agreed.
Electronic files shall be delivered to Maersk Oil in a suitable media. The media shall fit
to the amount of data, and shall be an international recognized type. If e-mail is used
the amount of data must not exceed 10 Mb. The chosen media must be approved by
Maersk Oil, Document Control, and upon request the media can be returned if wanted.

8.1 Engineering

8.1.1 Modification projects


 1 set of AS-BUILT calculations and reports in A4 binders
Ref. DOS A-12, Calculations and Reports
 2 sets of AS-BUILT drawings in A3 binders
Ref. DOS A-01, Engineering Drawings & Legends
 1 set of all documentation in pdf-version (calculations, reports and drawings) in
appropriate media
Ref. DOS A-25, Electronic Documents

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 8 of 22

8.1.2 EPC Contracts


 1 sets of AS-BUILT calculations and reports in A4 binders
Ref. DOS A-12, Calculations and Reports
 2 sets of AS-BUILT drawings in A3 binders
Ref. DOS A-01, Engineering Drawings & Legends
 1 set of all documentation in pdf-version (calculations, reports and drawings) in
appropriate media.
Ref. DOS A-25, Electronic Documents

8.2 Document Control

8.2.1 Modification projects


 1 set of all drawing CAD files in appropriate media, when the drawings are in
rev. 0 (or higher) from Engineering contractor
Ref. DOS A-01, Engineering Drawings & Legends
 1 set of all AS-BUILT engineering lists in appropriate media
Ref. DOS A-02, Engineering Lists
 1 set of all AS-BUILT calculations and reports in native format, including input
files for calculations, in appropriate media
Ref. DOS A-12, Calculations and Reports

8.2.2 EPC Contracts


 1 set of all documentation in pdf-version (calculations, reports and drawings) in
appropriate media
Ref. DOS A-25, Electronic Documents
 1 set of all drawing CAD files in AS-BUILT version in appropriate media
Ref. DOS A-01, Engineering Drawings & Legends
 1 set of computer design model (3D) in appropriate media
Ref. DOS A-23, CAD System
Monthly copies of the computer records (2D and 3D CAD and Databases) shall be
provided if requested by Maersk Oil.

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 9 of 22

9 TERMS, ABBREVIATIONS & ACRONYMS


Terms, abbreviations and acronyms included in this document are specific to the
contents of the same. A list of other relevant terms is available in GMS Definitions for
general reference.

9.1 Terms

Shall Indicates the requirements strictly to be followed in order to


conform to this instruction. Deviations from shall requirements
shall be subject to dispensation approval.
Should Indicates that among several possibilities, one is recommended
as particularly suitable, without mentioning or excluding others or
that a certain course of action is preferred but not necessarily
required. Other possibilities may be applied subject to agreement.
May Verbal form used to indicate a course of action permissible within
the limits of the instruction.

9.2 Abbreviations & Acronyms

ALARP As Low As Reasonably Practicable


C.P. Cathodic Protection
DBU Danish Business Unit
DOS Documentation Instruction
DFI Design, Fabrication & Installation
EPC Engineering, Procurement & Construction
ESD Emergency Shut Down
Ex Symbol for Explosion protection
F&G Fire & Gas
GMS Global Management System
HAZID Hazard Identification
HAZOP Hazard Operability study
HUC Hook up and Commissioning
HV High Voltage
I.S. Intrinsically Safe
MO Maersk Oil - Mærsk Olie og Gas A/S
MOTS Maersk Oil – Technical Standard - Corporate
PFP Passive Fire Protection
QRA Quantitative Risk Assessment

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 10 of 22

ROSAP Structural calculation programme


SCADA Supervisory Control And Data Acquisition
SWG Switchgear

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 11 of 22

APPENDIX A: TOPSIDES – INCL. CELLAR DECK AND BRIDGES

Master – Engineering Dossier – Topsides

Design packages Conceptual Certification Construction Detailed Installation


Design Package Tendering Design and HUC
*1) design
Introduction
- Drawing and Document List X X X X X
- Design Basis X X X X X
- Design Summary X X X X X
- Health & Safety Reviews
- HAZID/ALARP X X X X
- HAZOP X *2) X X *3)
- QRA X X X *3) X *3)

Design packages Conceptual Certification Construction Detailed Installation


Design Package Tendering Design and HUC
*1) design
Process and Utility Systems
- Drawing and Document List X X X X X
- System Description X X X X X
- Flow Diagrams X X X X X
- P&ID’s X X X X X
- Process Cause & Effect X X X X
- Calculations
- Process System X X X
- Blow-down X X
- Pressure Relief Valves
X X
(PRV)
- Flare System X X
- Shut down analysis X X
- Radiation X X
- Heat & Material Balance X
- ESD Alarm Setting X
- Pressure Safety Valve
X X
(PSV)

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 12 of 22

Design packages Concept Certificatio Construction Detailed Installation


ual n Tendering Design and HUC
Design Package *1) design
Piping
- Drawing and Document List X X X X X
- System Description X X X X X
- General Arrangement X X X X X
- Isometric *5) X X X
- Line List X X X
- Pigging Facility X X X
- Pipe Support X X X
- SPP Index X X X
- SPP Details
- Data Sheet X X
- Drawing X X
- Calculation X
- Field Run Piping & Support X X
- Calculation X X
- Stress X
Weight Report- *6) - X X X X X

Design packages Conceptual Certification Construction Detailed Installation


Design Package Tendering Design and HUC
*1) design
Mechanical
- Drawing and Document List X X X X X
- Systems Description X X X X X
- Plot Plan X X X X X
- Equipment Layout X X X X X
- Hook-up Drawing X X X
- Equipment List X X X
Equipment Sizing
- X X X X
Calculation
Maintenance of Major
- X X
Equipment
- Data Sheet X X X
- Requisition X X X
- Weight Report *6) X X X X X

Design packages Conceptual Certification Construction Detailed Installation

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 13 of 22

Design Package Tendering Design and HUC


*1) design
Electrical
- Drawing and Document List X X X X X
- System Description X X X X X
- Area Classification X X X X X
- Earthing Layout X X X X
- Equipment Layout X X X
Lighting and Small Power
- X X X
Layout
- Trace Heating Layout X X X
- Cable Routing X X X
- Cable Ladder Layout X X X
- Interconnection Diagram X X X
- Block Diagram X X X
- Electrical Load List X X X X X
- Control Schematic X X X
- Single Line Diagram X X X X X
HV-SWG Protection Single
- X X X
Line

- Switchboard Layout X X

- Navigation Aid Layout X X X

- Cable List X X X

Electrical Equipment List


- X X X
(Ex)
- Data Sheet X X X
- Requisition X X X
- Calculations
- Short Circuit X
- Equipment Sizing X
- Battery Sizing X
- Load Flow /
X X
Device Co-ordination

- Cable sizing Calculations X X X X X


¤1
- Weight Report *6) X X X X X

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 14 of 22

Design packages Conceptual Certification Construction Detailed Installation


Design Package Tendering Design and HUC
*1) design
Instrumentation (SCADA and ESD)
- Drawing and Document List X X X X X
- System Description X X X X X
- Loop Diagram X X X
- Connection Diagram X X X
- Block Diagram X X X
- Termination Diagram X X X
- Cable Routing X X X
- Cable Ladder Layout X X X
- Instrument Layout X X X
- Cable List X X X
- Instrument List X X X
- Signal List X X
- Data Sheet X X X
- Requisition X X X
- Calculation
- I.S. Calculation X
- Level Study X X
- SIL Calculations X X X X X ¤2
- Weight Report *6) X X
Communication
- Drawing and Document List X X X X X
- System Description X X X X X
- Public Address System X X X X X
- Telephone System X X X X X
- Connection Diagram X X X
- Block Diagram X X
- Termination Diagram X X X
- Cable List X X X
- Equipment List X X X
- Data Sheet X X X
- Requisition X X X
- Weight Report *6) X X

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 15 of 22

Design packages Conceptual Certification Construction Detailed Installation


Design Package Tendering Design and HUC
*1) design
Fire and Gas, Detection and Alarm
Drawing and Document
- X X X X X
List
- System Description X X X X X
- Fire Area X X X X
- F&G Cause & Effect X X X X
- F&G Detection Layout X X X
Passive Fire Protection
- X X X
(PFP)
- Fusible Plug Layout X X
- Connection Diagram X X X
- Loop Diagrams *4) X X
- Block Diagram X X
- Termination Diagram X X X
- Hook-up Drawings X X X
- Instrument List X X X
- Cable List X X X
- Data Sheet X X X
- Requisition X X X
Fire & Safety
Drawing and Document
- X X X X X
List
- System Description X X X X X
- Fire & Safety Plan X X X
- Escape Route X X X X X
- Passive Fire Protection X X X
- Crane Operational Area X X
- Equipment List X X X
- Calculation
- Fire water / Deluge Report X X
Passive Fire Protection
- X X X
Report
- Weight Report *6) X X

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 16 of 22

Design packages Conceptual Certification Construction Detailed Installation


Design Package Tendering Design and HUC
*1) design
Structures
- Drawing and Document List X X X X X
- System Description X X X X X
- Design Brief X X X X X
- Design Drawings
- Arrangement X X X X X
- Detail X X X X
- Traceability X X
- Load Plan X X
- Rig Access X
- Lists of Structural details
- Nodes X
- Members X
- Bearing X
- Bill of Material X X
- Design Report
- Static and Dynamic
X X X X
Analysis
- Static Calculation of Wind,
Ice and Explosion on Walls X X X
and Roofs
- SRS Report X X X
- SRS ROSAP files X X X
- In place Analysis X X X X
- Fatigue Analysis X X X X
- Weight Report X X X X X
- Lift Analysis X X X X X
- Load out Analysis X X X X X
- Transportation Analysis X X X X X
- Detailed Design Report X X X X
- Secondary Steel Design X
- Corrosion Protection
X X X
Report
- Weight Report X X X X X
- Installation Manual X

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 17 of 22

Certification Construction Detailed Installation


Conceptual
Design packages Design
Package Tendering Design and HUC
*1) design
HVAC ¤3
- Drawing and Document List X X X X X
- System Description X X X X X
- Design Drawings
- Ducting and Instrument X X X
- Termination Diagram X X X
- Ducting detail drawings X X X
- Equipment List X X X
- Material Take off (MTO) X X X
- Data Sheet / Requisition X X X
- Calculation and Report X X X
- Equipment Sizing,
X X X
Calculations / Air flow
- Environmental Calculations
X X X
(Temperature)
- Weight Report *6) X X X X
Misc. Calculations / Reports
- Protective Coating Report X
- Blast Calculation X X
- Installation Report X X
- Design Manual X X
- Communication Report X X

*1) The documents shall be certified as per requirements in the certification


contract.
*2) A preliminary HAZOP, HAZID/ALARP is required to enable the early
identification of any major safety issue.
*3) HAZOP and QRA shall be updated if there is significant change to certificate
package which may cause a safety issue.
*4) Fire and Gas Loop diagrams shall not be prepared for the TYW and TYE
platforms.
*5) Isometrics to include weights and centre of gravity (c.o.g)
*6) One common weight report to be issued, i.e. to be co-ordinated between the
relevant disciplines. Both native and pdf. files to be submitted to:
topsides-structural@maerskoil.com

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 18 of 22

APPENDIX B: JACKETS

Master – Engineering Dossier – Jackets

Design packages Conceptual Certification Construction Detailed Installation


Design Package Tendering Design *1)
Introduction
- Drawing and Document List X X X X X
- Design Basis X X X X X
- Design Summary X X X X X
- Health & Safety Reviews
- HAZID/ALARP X X X X
- HAZOP X *2) X X *3)
- QRA X X X *3) X *3)

Design packages Conceptual Certification Construction Detailed Installation


Design Package Tendering Design *1)
Structures
- Drawing and Document List X X X X X
- Design Basis X X X X X
- Design Briefs X X X X X
- Design Manual (summary) X X
- Design Drawings
- Arrangement X X X X X
- Detail X X X X
- Traceability X X
- Lists of Structural Details
- Nodes X
- Members X
- Bearing X
- Anodes X
- Bill of Material X X
- Calculation and Reports
- Static and Dynamic X X X
- SRS Report X X X
- SRS ROSAP-files X X X
- In place Analysis X X X X
- Fatigue Analysis X X X X
- Dynamic Analysis X X X X

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 19 of 22

- Load out Analysis X X X X X


- Transportation Analysis X X X X X
- Lift Analysis X X X X X
- Detail Design Report X X X X
- Secondary Steel Design X
- Corrosion Protection
X X X
Report
- Structural Analyses Files
(to be compatible with X X X
ROSAP)
- Weight Report X X X X X
- Installation Manual X
- Installation Analysis X
- Installation procedure /
X
report
- On-bottom Stability X
- Pile Driveability X
- Grout Hardening X

*1) The documents shall be certified as per requirements in the certification


contract.
*2) A preliminary HAZOP, HAZID/ALARP is required to enable the early identification
of any major safety issue.
*3) HAZOP and QRA shall be updated if there is significant change to certificate
package which may cause a safety issue.

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 20 of 22

APPENDIX C: PIPELINES AND RISERS


Master – Engineering Dossier – Pipelines
Design packages Conceptual Certification Detailed Installation
Design Package Design
*1)
Introduction

- Drawing and Document List X X X X


- Design Basis X X X X
- Design Summary X X X X
- Health & Safety Review
- HAZID/ALARP X X X X
- HAZOP X *2) X X *3)
- QRA X X X *3) X *3)
Structural
- Drawing and Document List X X X X
- System Description X X X X
- Design Brief X X
- Design Manual (Summery) X X X X
- Drawings
- Arrangement X X X X
- Detail X X X
- Traceability X
- Bill of Materials X X
- Weight Report *4) X X X X
- Calculation Reports
- Riser Design X X
- Pipeline Route X X X X
- Pipeline Stability X X X X
- Line Pipe Design X X X X
- Protective Coating X X X X
- C.P. Design X X X
- Spanning Analyses X X X
- Weight Report *4) X X X X
- Pipeline Installation Report X X X
- Transportation
- Loadout Analysis X
- Transport Analysis X
- Installation

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 21 of 22

- Installation Analysis X
- Installation Procedure Report X
*1) The documents shall be certified as per requirements in the certification
contract.
*2) A preliminary HAZOP, HAZID/ALARP is required to enable the early identification
of any major safety issue.
*3) HAZOP and QRA shall be updated if there is significant change to certificate
package which may cause a safety issue.
*4) Weight report format to be agreed with Structural Department – Topsides.

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.
Design & Engineering (DOS A-03)
DK-FP-INS-0009 Rev. 13.0
Page 22 of 22

APPENDIX D: CHANGES SINCE REVISION 12

Questions, comments or proposed amendments to the Documentation Instructions are


to be given in writing to Maersk Oil, Document Control or by e-mail to Doc Control
Mailbox at doccontrol@maerskoil.com.

Note
Major alterations are shown as ¤ identified with a number and are mentioned under
"SPECIFIC" on this revision page (ex. ¤1)
Minor alterations where the meaning of the content is unchanged are not shown.

GENERAL
Standard renamed to Instruction DK-FP-INS-0009 – Replace DK-EP-STD-0004.

SPECIFIC
¤1 Appendix A – Electrical, Cable sizing calculations added.
¤2 Appendix A – Instrumentation, SIL calculations added.
¤3 Appendix A – New HVAC discipline added.

This document contains proprietary information belonging to Maersk Oil and shall not be wholly or partially reproduced nor
disclosed without prior written permission from Maersk Oil.

Printed versions of this document are uncontrolled, check GMS for latest version.

Vous aimerez peut-être aussi