PRESUPUESTO

CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC. UNID.

MATERIALES

CERRAMIENTO
Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza.

1 TU Cuadr.4" x 3.0 mm 9.11 kg/m x 18000 columnas Pza.


2 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 8800 transversales Pza.
4 TU Rect.40 mm x 80 mm x 5.19 kg/m x 6800 transversales Pza.
3 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 26700 transversales Pza.
4 TU Rect.40 mm x 80 mm x 5.19 kg/m x 6800 transversales Pza.
4 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 6700 arriostre Pza.
5 TU Rect.40 mm x 80 mm x 5.19 kg/m x 6500 arriostre Pza.
6 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 6800 arriostre Pza.
7 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 8700 arriostre Pza.
8 Pl 3/16" 5.00 x 300 x 300 cart tipo 1 Pza.
9 Pl 1/2" 12.00 x 300 x 300 pl base 8 aguj. Pza.

10 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 3000 transversales Pza.


11 Riel Tipo Stanley 2.00 x 200 x 6000 cart tipo 1 Pza.

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 3 mils
Capa intermedia
Acabado
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 200 US $ x sem 15 m altura
Mano de Obra 8 personas 3 semanas 6 kg/hh
Supervision
SCRT
Varios
Costo Total de Procesos

COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL
RATIO
MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

A-36 1 3,780.00 8.60 840.00 7,224.00

A-36 17 2,787.66 0.90 124.85 2,508.89


A-36 6 370.66 0.90 16.16 333.59
A-36 8 282.34 0.00 13.06 0.00
A-36 3 562.30 0.90 24.51 506.07
A-36 4 141.17 0.90 6.53 127.05
A-36 20 940.68 0.90 41.00 846.61
A-36 12 404.82 0.90 18.72 364.34
A-36 4 190.94 0.90 8.32 171.85
A-36 2 122.15 0.90 5.32 109.93
A-36 76 268.81 1.20 13.68 322.57
A-36 24 203.73 1.20 4.32 244.48

A-36 20 421.20 0.85 18.36 358.02


A-36 4 75.46 1.40 9.60 105.64

10,551.91 304.43
126.62 4.20 531.82

1.50 276.47 414.71


2.50 276.47 691.18
2.50 276.47 691.18
0.00 276.47 0.00
30.00 3.00 90.00

10,551.91
276.47
15,641.93

10,551.91 0.01 105.52


10,551.91 0.03 316.56
10,551.91 0.03 316.56
10,551.91 0.03 316.56
10,551.91 0.02 211.04
2 200.00 3.00 1,200.00
10,551.91 3.20 1,758.65 5,627.69
10,551.91 0.06 633.11
10,551.91 0.06 633.11
1,000.00
10,360.15

26,002.07
20.00% 5,200.41
31,202.49
2.96
306000 51.0 51 PZAS
52800
54400
80100
27200
134000
78000
27200
17400 78.5 84 PZAS

60000
800
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC.

MATERIALES

ALMACEN
Panel TR 4 0,45 mm 4.50 kg/m2 cobertura

1 TU Cuadr.4" x 3.0 mm 9.11 kg/m x 8000 columnas


2 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 6500 transversales
3 TU Rect.40 mm x 80 mm x 3.0 mm 5.19 kg/m x 36000 transversales
4 TU Rect.40 mm x 80 mm x 3.0 mm 5.19 kg/m x 6800 arriostre
5 Pl 3/16" 5.00 x 300 x 300 cart tipo 1
6 Pl 1/2" 12.00 x 300 x 300 pl base 8 aguj.

7 TU Rect.40 mm x 80 mm x 3.0 mm 5.19 kg/m x 3250 transversales


8 Riel Tipo Stanley 2.00 x 200 x 6000

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 3 mils
Capa intermedia
Acabado
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 150 US $ x sem 10 m altura
Mano de Obra 6 personas 3 semanas 7.5 kg/hh
Supervision
SCRT
Varios

Costo Total de Procesos


COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
UNID. MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

Pza. A-36 1 4,410.00 8.60 980.00 8,428.00

Pza. A-36 28 2,040.64 0.90 91.39 1,836.58


Pza. A-36 17 775.71 0.90 33.81 698.14
Pza. A-36 8 1,494.72 0.90 69.12 1,345.25
Pza. A-36 20 705.84 0.90 32.64 635.26
Pza. A-36 40 141.48 1.20 7.20 169.78
Pza. A-36 28 237.69 1.20 5.04 285.22

Pza. A-36 10 168.68 0.90 7.80 151.81


Pza. A-36 2 37.73 1.40 4.80 52.82

10,012.48 251.81

120.15 4.20 504.63

1.50 239.21 358.81


2.50 239.21 598.01
2.50 239.21 598.01
0.00 239.21 0.00
30.00 3.00 90.00

10,012.48
239.21

10,012.48 0.01 100.12


10,012.48 0.03 300.37
10,012.48 0.03 300.37
10,012.48 0.03 300.37
10,012.48 0.02 200.25
2 150.00 2.00 600.00
10,012.48 3.20 1,335.00 4,271.99
10,012.48 0.06 600.75
10,012.48 0.06 600.75
1,600.00
20.00%
224000 37.33333333
110500
288000
136000
12000

32500
400

15,752.31

8,874.99
24,627.29
4,925.46
29,552.75

2.95
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC. UNID. MAT.

MATERIALES

METRADO DE LOS DOS AMBIENTES EXISTENTES


Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza. A-36

1 TU Cuadr.4" x 3.0 mm 9.11 kg/m x 6000 columnas Pza. A-36


2 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 6950 transversales Pza. A-36
3 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 9900 transversales Pza. A-36
CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

1 2,430.00 9.00 540.00

20 1,093.20 0.90 48.96 983.88


16 780.62 0.90 34.03 702.56
16 1,111.97 0.90 48.47 1,000.77

5,415.79 131.46
540 M2

120000 20.0 20 PZAS


111200
158400 44.9 45 PZAS

SE PUEDE USAR UN 70%


US $
Panel TR 4 0,45 mm 378 m2 8.5 3,213.00
TU Cuadr.4" x 3.0 mm 14 pzas de 6 m 765.24 688.72
TU Rect.4" x 2" x 3.0 mm 31.5 pzas de 6 m 1326.78 1,194.10

DESCUENTO TOTAL POR REUSAR MATERIALES 5,095.82


PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC. UNID.

MATERIALES

DESMONTAJE DE AMBIENTES EXISTENTES


Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza.

1 TU Cuadr.4" x 3.0 mm 9.11 kg/m x 6000 columnas Pza.


2 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 6950 transversales Pza.
3 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 9900 transversales Pza.

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 6 mils
Capa intermedia
Acabado
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 150 US $ x sem 10 m altura
Mano de Obra 6 personas una semana 8 kg/hh
Supervision
SCRT
Varios

Costo Total de Procesos

COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

A-36 1 2,430.00 0.00 540.00

A-36 20 1,093.20 0.00 48.96 0.00


A-36 16 780.62 0.00 34.03 0.00
A-36 16 1,111.97 0.00 48.47 0.00

5,415.79 131.46

5.42 4.20 22.75

0.00 540.00 0.00


0.00 540.00 0.00
0.00 540.00 0.00
0.00 540.00 0.00
15.00 3.00 45.00

5,415.79
540.00
67.75

5,415.79 0.01 54.16


5,415.79 0.06 324.95
5,415.79 0.00 0.00
5,415.79 0.00 0.00
5,415.79 0.03 162.47
2 150.00 1.00 300.00
5,415.79 3.20 676.97 2,166.32
5,415.79 0.03 162.47
5,415.79 0.04 216.63
400.00

3,787.00

3,854.75
25.00% 963.69
4,818.43

0.89
540 M2

120000 20.0 20 PZAS


111200
158400 44.9 45 PZAS
COTIZACION REV

1 FABRICACION Y MONTAJE DE CERRAMIENTO DE


26.70 M DE LARGO X 8.80 M DE ANCHO X 18 M ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGURAL DE 4" X 2" X 3.0 MM
TUBO RECTANGURAL DE 80 MM X 40 MM X 3.0 MM Y COBERTURA
TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
TIEMPO: 03 SEMANAS

2 FABRICACION Y MONTAJE DE ALMACEN DE


36.00 M DE LARGO X 6.50 M DE ANCHO X 8.00 M ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGURAL DE 4" X 2" X 3.0 MM
TUBO RECTANGURAL DE 80 MM X 40 MM X 3.0 MM Y COBERTURA
TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
INCLUYE PLANCHAS BASE DE COLUMNAS Y PERNOS DE ANCLAJE
TIEMPO: 03 SEMANAS

3 DESARMADO DE 02 AMBIENTES EXISTENTES


9.90 M DE LARGO X 6.00 M DE ANCHO X 6.00 M ALTURA
PARA REUSAR MATERIAL
TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGULAR DE 4" X 2" X 3.0 MM Y COBERTURA
TIPO TP - 4 DE 0.5 MM ESP.
INCLUYE DESMONTAJE Y MONTAJE EN NUEVA UBICACIÓN
DE EXTRACTORES
TIEMPO: 01 SEMANA

NOTA POR REUSAR MATERIALES SE PODRIA HACER UN DESCUENTO DE


US $ 5,000.00 DSCTO

Panel TR 4 0,45 mm 378 m2


TU Cuadr.4" x 3.0 mm 14 pzas de 6 m
TU Rect.4" x 2" x 3.0 mm 31 pzas de 6 m ??

PREPARACION SUPERFICIAL LIMPIEZA MECANICA


PROTECCION SUPERFICIAL UNA CAPA DE PINTURA BASE Y UNA CAPA DE PINTURA DE ACABADO

EL COSTO INCLUYE
MANO DE OBRA CALIFICADA Y DIRECCION TECNICA, CON ESTANDARES DE SEGURIDAD
EQUIPOS Y HERRAMIENTAS
SEGURO COMPLEMENTARIO DE RIESGO Y TRABAJO

EL CLIENTE SUMINISTRARA
ENERGIA ELECTRICA EN LA ZONA DE TRABAJO
AREA SEGURA PARA ALMACENAJE DE NUESTROS EQUIPOS Y HERRAMIENTAS.
US $ GG+UTIL US $

31,202.49 + IGV 20% 5,200.41

29,552.75 + IGV 20% 4,925.46

4,818.43 + IGV 25% 963.69

GG+UTIL TOTAL 11,089.56

-5000.00 + IGV 0.5135769172

60,573.68 + IGV

4,226.32

2170.542488949 33,373.03
URA DE ACABADO
2,055.78 31,608.53
COTIZACION
ITEM DESCRIPCION

1 FABRICACION Y MONTAJE DE CERRAMIENTO DE


26.70 M DE LARGO X 8.80 M DE ANCHO X 18 M ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGURAL DE 4" X 2" X 3.0 MM
TUBO RECTANGURAL DE 80 MM X 40 MM X 3.0 MM Y COBERTURA
TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
TIEMPO DE ENTREGA : 04 SEMANAS

2 FABRICACION Y MONTAJE DE ALMACEN DE


36.00 M DE LARGO X 6.50 M DE ANCHO X 8.00 M ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGURAL DE 4" X 2" X 3.0 MM
TUBO RECTANGURAL DE 80 MM X 40 MM X 3.0 MM Y COBERTURA
TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
INCLUYE PLANCHAS BASE DE COLUMNAS Y PERNOS DE ANCLAJE
TIEMPO DE ENTREGA : 04 SEMANAS

3 DESARMADO DE 02 AMBIENTES EXISTENTES


9.90 M DE LARGO X 6.00 M DE ANCHO X 6.00 M ALTURA
PARA REUSAR MATERIAL
TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGULAR DE 4" X 2" X 3.0 MM Y COBERTURA
TIPO TP - 4 DE 0.5 MM ESP.
INCLUYE DESMONTAJE Y MONTAJE EN NUEVA UBICACIÓN
DE EXTRACTORES
TIEMPO DE ENTREGA : 01 SEMANA

NOTA: SE REUTILIZARA PARA EL ITEM 1 UN 70% DE LOS MATERIALES DESCUENTO


QUE SE OBTENGAN DEL DESARMADO DE LOS AMBIENTES
CORRESPONDIENTES AL ITEM 3 MONTO TOTAL US $
Panel TR 4 0,45 mm 378 m2
TU Cuadr.4" x 3.0 mm 14 pzas de 6 m
TU Rect.4" x 2" x 3.0 mm 31 pzas de 6 m

FORMA DE PAGO: 50% CON LA ORDEN DE COMPRA, SALDO CONTRA ENTREGA

PREPARACION SUPERFICIAL LIMPIEZA MECANICA


PROTECCION SUPERFICIAL UNA CAPA DE PINTURA BASE Y UNA CAPA DE PINTURA DE ACABADO

EL COSTO INCLUYE
MANO DE OBRA CALIFICADA Y DIRECCION TECNICA, CON ESTANDARES DE SEGURIDAD
EQUIPOS Y HERRAMIENTAS
SEGURO COMPLEMENTARIO DE RIESGO Y TRABAJO

EL CLIENTE SUMINISTRARA
ENERGIA ELECTRICA EN LA ZONA DE TRABAJO
AREA SEGURA PARA ALMACENAJE DE NUESTROS EQUIPOS Y HERRAMIENTAS.
US $ GG+UTIL US $

33,373.00 + IGV 20% 5,200.41

31,608.00 + IGV 20% 4,925.46

4,819.00 + IGV 25% 963.69

GG+UTIL TOTAL 11,089.56

-5000.00 + IGV

64,800.00 + IGV

64,800.00

33280.04185839 66,653.04
DE ACABADO
31,519.96 63,127.96
COTIZACION
ITEM DESCRIPCION

1 FABRICACION Y MONTAJE DE CERRAMIENTO DE


26.50 M DE LARGO X 8.80 M DE ANCHO X 16 M ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGURAL DE 4" X 2" X 3.0 MM
TUBO RECTANGURAL DE 80 MM X 40 MM X 3.0 MM Y COBERTURA
TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
TIEMPO DE ENTREGA : 04 SEMANAS

2 DESARMADO DE 02 AMBIENTES EXISTENTES


9.90 M DE LARGO X 6.00 M DE ANCHO X 6.00 M ALTURA
PARA REUSAR MATERIAL
TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGULAR DE 4" X 2" X 3.0 MM Y COBERTURA
TIPO TP - 4 DE 0.5 MM ESP.
INCLUYE DESMONTAJE Y MONTAJE EN NUEVA UBICACIÓN
DE EXTRACTORES
TIEMPO DE ENTREGA : 01 SEMANA

NOTA: SE REUTILIZARA PARA EL ITEM 1 UN 70% DE LOS MATERIALES DESCUENTO


QUE SE OBTENGAN DEL DESARMADO DE LOS AMBIENTES
CORRESPONDIENTES AL ITEM 2 MONTO TOTAL US $
Panel TR 4 0,45 mm 378 m2
TU Cuadr.4" x 3.0 mm 14 pzas de 6 m
TU Rect.4" x 2" x 3.0 mm 31 pzas de 6 m

FORMA DE PAGO: 50% CON LA ORDEN DE COMPRA, SALDO CONTRA ENTREGA

PREPARACION SUPERFICIAL LIMPIEZA MECANICA


PROTECCION SUPERFICIAL UNA CAPA DE PINTURA BASE Y UNA CAPA DE PINTURA DE ACABADO

EL COSTO INCLUYE
MANO DE OBRA CALIFICADA Y DIRECCION TECNICA, CON ESTANDARES DE SEGURIDAD
EQUIPOS Y HERRAMIENTAS
SEGURO COMPLEMENTARIO DE RIESGO Y TRABAJO

EL CLIENTE SUMINISTRARA
ENERGIA ELECTRICA EN LA ZONA DE TRABAJO
AREA SEGURA PARA ALMACENAJE DE NUESTROS EQUIPOS Y HERRAMIENTAS.
US $ GG+UTIL US $

31,200.00 + IGV 20% 5,200.41

4,819.00 + IGV 25% 963.69

GG+UTIL TOTAL 6,164.10

-5000.00 + IGV

31,019.00 + IGV

64,800.00

#VALUE! #VALUE!
DE ACABADO
#VALUE! #VALUE!
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC. UNID.

MATERIALES

CERRAMIENTO
Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza.

1 TU Cuadr.4" x 3.0 mm 9.11 kg/m x 16000 columnas Pza.


2 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 8800 transversales Pza.
3 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 26500 transversales Pza.
4 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 6700 arriostre Pza.
4 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 4700 arriostre Pza.
5 TU Rect.40 mm x 80 mm x 5.19 kg/m x 6500 arriostre Pza.
5 TU Rect.40 mm x 80 mm x 5.19 kg/m x 6500 arriostre Pza.
6 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 5100 arriostre Pza.
7 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 8700 arriostre Pza.
8 Pl 3/16" 5.00 x 300 x 300 cart tipo 1 Pza.
9 Pl 1/2" 12.00 x 300 x 300 pl base 8 aguj. Pza.

10 TU Rect.4" x 2" x 3.0 mm 7.02 kg/m x 3000 transversales Pza.


11 Riel Tipo Stanley 2.00 x 200 x 6000 cart tipo 1 Pza.

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 3 mils
Capa intermedia
Acabado
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 200 US $ x sem 15 m altura
Mano de Obra 8 personas 3 semanas 6 kg/hh
Supervision
SCRT
Varios

Costo Total de Procesos

COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

A-36 1 3,352.50 8.60 745.00 6,407.00

A-36 17 2,477.92 0.90 110.98 2,230.13


A-36 12 741.31 0.90 32.31 667.18
A-36 6 1,116.18 0.90 48.65 1,004.56
A-36 16 752.54 0.90 32.80 677.29
A-36 4 131.98 0.90 5.75 118.78
A-36 8 269.88 0.90 12.48 242.89
A-36 4 134.94 0.90 6.24 121.45
A-36 4 143.21 0.90 6.24 128.89
A-36 2 122.15 0.90 5.32 109.93
A-36 76 268.81 1.20 13.68 322.57
A-36 24 203.73 1.20 4.32 244.48

A-36 20 421.20 0.85 18.36 358.02


A-36 4 75.46 1.40 9.60 105.64

10,211.81 306.75

122.54 4.20 514.68

1.50 278.79 418.18


2.50 278.79 696.97
2.50 278.79 696.97
0.00 278.79 0.00
30.00 3.00 90.00

10,211.81
278.79
15,155.59

10,211.81 0.01 102.12


10,211.81 0.03 306.35
10,211.81 0.03 306.35
10,211.81 0.03 306.35
10,211.81 0.02 204.24
2 200.00 3.00 1,200.00
10,211.81 3.20 1,701.97 5,446.30
10,211.81 0.06 612.71
10,211.81 0.06 612.71
915.00

10,012.13

25,167.73
20.00% 5,033.55
30,201.27

2.96
0.24
272000 45.3 51 PZAS
105600
159000
107200
18800
52000
26000
20400
17400 84.4 84 PZAS

60000
800
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC. UNID.

MATERIALES

CERRAMIENTO
Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza.
Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza.
1 TU Cuadr.4" x 2.0 mm 6.17 kg/m x 9000 columnas Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 6000 columnas Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 6000 columnas Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 8800 transversales Pza.
3 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 26500 transversales Pza.
4 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 6700 arriostre Pza.
4 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 4250 arriostre Pza.
5 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 6500 arriostre Pza.
5 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 3850 arriostre Pza.
6 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 4350 arriostre Pza.
7 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 8700 arriostre Pza.
8 Pl 1/8" 3.00 x 300 x 300 cart tipo 1 Pza.
9 Pl 3/8" 9.00 x 300 x 300 pl base 8 aguj. Pza.

10 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 3000 transversales Pza.


11 Riel Tipo Stanley 2.00 x 200 x 6000 cart tipo 1 Pza.

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 3 mils 992.03
Capa intermedia
Acabado
Disco de esmeril
Peso Total
Area Total
Costo Total de Materiales
PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 200 US $ x sem 15 m altura
Mano de Obra 8 personas 3 semanas 6.5 kg/hh
Supervision
SCRT
Varios
Costo Total de Procesos
COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

A-36 1 2,502.00 8.10 556.00 4,503.60


A-36 1 585.00 0.00 130.00 0.00
A-36 17 944.01 0.82 62.42 774.09
A-36 11 302.28 0.82 15.18 247.87
A-36 6 164.88 0.00 8.28 0.00
A-36 12 483.65 0.82 24.29 396.59
A-36 6 728.22 0.82 36.57 597.14
A-36 12 368.23 0.82 18.49 301.95
A-36 8 155.72 0.00 7.82 0.00
A-36 8 238.16 0.82 11.96 195.29
A-36 4 70.53 0.00 3.54 0.00
A-36 4 79.69 0.00 4.00 0.00
A-36 2 79.69 0.82 4.00 65.35 562.59
A-36 76 161.29 1.20 13.68 193.54
A-36 24 152.80 1.20 4.32 183.36

A-36 10 137.40 0.00 9.18 0.00


A-36 2 37.73 0.00 4.80 0.00
7,191.28 228.54
86.30 4.20 362.44

1.50 214.56 321.84


66800 2.50 214.56 536.40
2.50 214.56 536.40
0.00 214.56 0.00
25.00 3.00 75.00
7,191.28
214.56
9,290.86

7,191.28 0.01 71.91


7,191.28 0.03 215.74
7,191.28 0.03 215.74
7,191.28 0.03 215.74
7,191.28 0.02 143.83
2 200.00 2.00 800.00
7,191.28 3.20 1,106.35 3,540.32
7,191.28 0.05 359.56
7,191.28 0.05 359.56
600.00
6,522.40
15,813.27
20.00% 3,162.65
18,975.92

2.64
0.38
28.69
153000 25.5 51 PZAS
66000
36000
105600
159000
80400
34000
52000
15400
17400
17400 80.2 84 PZAS

30000
400
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC. UNID.

MATERIALES

CERRAMIENTO
Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza.

1 TU Cuadr.4" x 2.0 mm 6.17 kg/m x 9000 columnas Pza.


2 TU Cuadr.4" x 2.0 mm 6.17 kg/m x 6000 columnas Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 4500 columnas Pza.
3 TU Cuadr.4" x 2.0 mm 6.17 kg/m x 6000 columnas Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 5600 columnas Pza.
4 TU Cuadr.4" x 2.0 mm 6.17 kg/m x 6000 columnas Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 6200 columnas Pza.
5 TU Cuadr.4" x 2.0 mm 6.17 kg/m x 12500 columnas Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 26000 transversales Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 9800 transversales Pza.
3 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 2000 transversales Pza.
3 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 3200 transversales Pza.
4 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 4250 arriostre Pza.
8 Pl 1/8" 3.00 x 300 x 300 cart tipo 1 Pza.
9 Pl 3/8" 9.00 x 300 x 300 pl base 8 aguj. Pza.

10 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 3000 transversales Pza.


11 Riel Tipo Stanley 2.00 x 200 x 6000 cart tipo 1 Pza.

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 3 mils
Capa intermedia
Acabado
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 200 US $ x sem 15 m altura
Mano de Obra 8 personas 3 semanas 5 kg/hh
Supervision
SCRT
Varios

Costo Total de Procesos

COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

A-36 1 1,620.00 8.10 360.00 2,916.00

A-36 2 111.06 0.82 7.34 91.07


A-36 2 74.04 0.82 4.90 60.71
A-36 2 41.22 0.82 2.07 33.80
A-36 2 74.04 0.82 4.90 60.71
A-36 2 51.30 0.82 2.58 42.06
A-36 2 74.04 0.82 4.90 60.71
A-36 2 56.79 0.82 2.85 46.57
A-36 2 154.25 0.82 10.20 126.49
A-36 3 357.24 0.82 17.94 292.94
A-36 1 44.88 0.82 2.25 36.80
A-36 1 9.16 0.82 0.46 7.51
A-36 8 117.25 0.82 5.89 96.14
A-36 8 155.72 0.82 7.82 127.69
A-36 16 33.96 1.20 2.88 40.75
A-36 20 127.33 1.20 3.60 152.80

A-36 5 68.70 0.85 4.59 58.40


A-36 1 18.86 1.40 2.40 26.41

3,189.84 58.03

38.28 4.20 160.77

1.50 51.04 76.56


2.50 51.04 127.61
2.50 51.04 127.61
0.00 51.04 0.00
15.00 3.00 45.00

3,189.84
51.04
4,815.10

3,189.84 0.01 31.90


3,189.84 0.03 95.70
3,189.84 0.03 95.70
3,189.84 0.03 95.70
3,189.84 0.02 63.80
2 160.00 2.00 640.00
3,189.84 3.20 637.97 2,041.50
3,189.84 0.05 159.49
3,189.84 0.05 159.49
400.00

3,783.26

8,598.37
20.00% 1,719.67
10,318.04

3.23
0.70
15.60
18000 3.0 51 PZAS
12000 2.0 51 PZAS
9000
12000 2.0 51 PZAS
11200
12000 2.0 51 PZAS
12400
25000 4.2 51 PZAS
78000
9800
2000
25600
34000

15000
200
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION

MATERIALES

CERRAMIENTO
Panel TP 5 0,4 mm 3.90 kg/m2 cobertura

1 TU Cuadr.100 mm x 2.0 mm 6.17 transversalekg/m x 1000 columnas


2 TU Cuadr.100 mm x 2.0 mm 6.17 kg/m x 6000 columnas

3 TU Cuadr.1 1/2" x 2.0 mm 2.24 kg/m x 6000 transversales


3 TU Cuadr.1 1/2" x 2.0 mm 2.24 kg/m x 6000 transversales
9 Pl 3/8" 9.00 x 250 x 250 pl base col
9 Pl 1/4" 6.00 x 80 x 6000 cartelas col

3 TU Rect.80 mm x 40 mm x 2.0 mm 3.56 kg/m x 4000 correa cierre


1 TU Rect.80 mm x 40 mm x 2.0 mm 3.56 kg/m x 4000 correa intermedia

1 TU Cuadr.1 1/2" x 2.0 mm 2.24 kg/m x 4000 viga celosia


1 TU Cuadr.1 1/2" x 2.0 mm 2.24 kg/m x 500 viga celosia
1 TU Cuadr.1 1/2" x 2.0 mm 2.24 kg/m x 1000 viga celosia

2 Fierro redondo 3/8" 0.56 kg/m x 6000 refuerzos

1,048.32
69.888
6.9888
Soldadura
PROTECCION SUPERFICIAL 5.769230769
Arenado global
Pntura base 3 mil y acabado 3 mils 430.6779661
Capa intermedia
Acabado 9.491525424
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 200 US $ x sem 15 m altura
Mano de Obra 6 personas 4 semanas 4.22 kg/hh
Ingenieria
Supervision 1344
SCRT
Varios

Costo Total de Procesos

COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
PROC. UNID. MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

Pza. A-36 0 0.00 5.90 545.00 0.00

Pza. A-36 15 92.55 0.80 6.12 74.04


Pza. A-36 15 555.30 0.75 36.72 416.48

Pza. A-36 75 1,008.00 0.75 72.00 756.00


Pza. A-36 3 40.32 0.75 2.88 30.24
Pza. A-36 90 397.91 1.00 5.40 397.91
Pza. A-36 4 90.55 1.00 0.08 90.55

Pza. A-36 28 398.72 0.80 26.88 318.98


rrea intermedia Pza. A-36 42 598.08 0.80 40.32 478.46

Pza. A-36 10 89.60 0.75 6.40 67.20


Pza. A-36 60 67.20 0.75 4.80 50.40
Pza. A-36 50 112.00 0.75 8.00 84.00
268.80
Pza. A-36 28 94.08 1.20 3.69 3.69 112.90

4.8
3.2
3,544.31 213.29
236.2873133
38.99 4.00 155.95
16.441
1.00 213.29 213.29
1.00 213.29 213.29
0.00 213.29 0.00
1.40 213.29 298.61
25.00 2.40 60.00

3,544.31
213.29

3,544.31 0.02 63.80


3,544.31 0.03 106.33
3,544.31 0.03 106.33
3,544.31 0.03 106.33
3,544.31 0.06 212.66
2 125.00 1.00 250.00
3,544.31 3.20 840 2,687.63
3,544.31 0.07 248.10
3,544.31 0.07 248.10
3,544.31 0.04 141.77
500.00

16.00%

0.71
15000 2.5 51 PZAS
90000 15.0 51 PZAS

450000
18000

112000
168000 28.0 51 PZAS

40000 6.7 51 PZAS


30000 5.0 51 PZAS
50000 8.3 51 PZAS

4.03 4.032

2,877.15
0.81

0.060178523

3,818.29
4,671.05

8,489.34
1,358.29
9,847.63 33580.4286

2.78

19.70
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION

MATERIALES

CERRAMIENTO
Panel TP 5 0,5 mm 4.90 kg/m2

1 TU Rect.400 mm x 200 mm x 4 mm 37.68 kg/m x 6400


1 TU Rect.400 mm x 200 mm x 3 mm 28.26 kg/m x 9030
1 TU Cuadr.150 mm x 150 mm x 3.0 mm 14.13 kg/m x 6500
1 TU Cuadr.100 mm x 100 mm x 4.0 mm 12.56 kg/m x 8600
3 C ATIEZ..150 mm x 50 mm x 15 mm x 3.0 mm 6.60 kg/m x 45700
3 C ATIEZ..150 mm x 50 mm x 15 mm x 3.0 mm 6.60 kg/m x 45700
3 C ATIEZ..150 mm x 50 mm x 15 mm x 2.0 mm 4.40 kg/m x 17700

Panel TP 5 0,5 mm 4.90 kg/m2

1 U 350 mm x 100 mm x 6 mm 42.40 kg/m x 18090


1 U 350 mm x 100 mm x 4 mm 28.26 kg/m x 18062
1 ANG 2 1/2" x 3/16" 4.60 kg/m x 922
1 ANG 2 1/2" x 3/16" 4.60 kg/m x 2304
1 ANG 2 1/2" x 3/16" 4.60 kg/m x 1831
1 ANG 2 1/2" x 3/16" 4.60 kg/m x 1870
1 ANG 2" x 1/8" 2.50 kg/m x 1174
1 ANG 2" x 1/8" 2.50 kg/m x 700
1 ANG 2" x 1/8" 2.50 kg/m x 1706
1 ANG 2" x 1/8" 2.50 kg/m x 350

1 U 350 mm x 100 mm x 4 mm 28.26 kg/m x 7000


1 ANG 2" x 1/8" 2.50 kg/m x 600
1 ANG 2" x 1/8" 2.50 kg/m x 781
1 ANG 2" x 1/8" 2.50 kg/m x 610
6 Pl 1/2" 16.00 x 900 x 700
6 Pl 1/2" 10.00 x 450 x 700

3 C ATIEZ..150 mm x 50 mm x 15 mm x 2.0 mm 4.40 kg/m x 72000


1 ANG 2" x 1/8" 2.50 kg/m x 7000
3 C ATIEZ..150 mm x 50 mm x 15 mm x 2.0 mm 4.40 kg/m x 36000
1 TU Cuadr.150 mm x 150 mm x 4.0 mm 18.84 kg/m x 7000
1 ANG 2" x 1/8" 2.50 kg/m x 600

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 3 mils
Capa intermedia
Acabado
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 200 US $ x sem 15 m altura
Mano de Obra 8 personas 4 semanas 4.9 kg/hh
Ingenieria
Supervision
SCRT
Varios

Costo Total de Procesos

COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
PROC. UNID. MAT. CANT. PESO PR. MAT. TIEMPO AREA
Kg. US $ Hr. m2

cobertura Pza. A-36 1 14,700.00 8.00 3,000.00

columnas Pza. A-36 16 3,858.43 0.66 122.88


columnas Pza. A-36 16 4,083.00 0.66 173.38
conector Pza. A-36 21 1,928.75 0.75 81.90
arriostre Pza. A-36 16 1,728.26 0.75 82.56
correas techo Pza. A-36 16 4,825.92 0.80 175.49
correas laterales Pza. A-36 10 3,016.20 0.80 109.68
correas laterales Pza. A-36 10 778.80 0.80 42.48

20,219.36

cobertura Pza. A-36 1 8,820.00 8.00 1,800.00

columnas Pza. A-36 2 1,534.03 0.66 43.42


columnas Pza. A-36 2 1,020.86 0.66 43.35
conector Pza. A-36 4 16.96 0.75 2.21
conector Pza. A-36 4 42.39 0.75 5.53
conector Pza. A-36 4 33.69 0.75 4.39
conector Pza. A-36 40 344.08 0.75 44.88
conector Pza. A-36 48 140.88 0.75 33.81
conector Pza. A-36 4 7.00 0.75 1.68
conector Pza. A-36 4 17.06 0.75 4.09
conector Pza. A-36 140 122.50 0.75 29.40
3,279.47
42,633.05

columnas Pza. A-36 2 395.64 0.66 16.80


conector Pza. A-36 30 45.00 0.75 10.80
conector Pza. A-36 28 54.67 0.75 13.12
conector Pza. A-36 28 42.70 0.75 10.25
pl base Pza. A-36 1 79.23 1.20 1.26
pl base Pza. A-36 2 49.52 1.20 1.26
666.76
17,335.68

correas techo Pza. A-36 30 9,504.00 0.80 518.40


conector Pza. A-36 48 840.00 0.75 201.60
correas lateral Pza. A-36 10 1,584.00 0.80 86.40
conector Pza. A-36 10 1,318.80 0.75 42.00
conector Pza. A-36 24 36.00 0.75 8.64
13,282.80
13,282.80

73,251.52

23.5294117647
143,747.88 3,661.02
9583.192107
1,581.23 4.20
5.7692307692 16.441
1.50 3,661.02
430.6779661017 1.00 3,661.02
0.00 3,661.02
9.4915254237 1.50 3,661.02
25.00 2.50

143,747.88
3,661.02

143,747.88 0.04
143,747.88 0.04
143,747.88 0.03
143,747.88 0.03
143,747.88 0.05
2 150.00 1.00
143,747.88 3.20 ###
143,747.88 0.05
1344 143,747.88 0.05
143,747.88 0.05

15.00%

0.03
P. PARCIAL P. TOTAL
US $ US $

24,000.00

2,546.57 102400 17.1 51 PZAS


2,694.78 144480 24.1 51 PZAS
1,446.56 136500 22.8 51 PZAS
1,296.19 137600 22.9 51 PZAS
3,860.74 731200
2,412.96 457000
623.04 177000

14,400.00

1,012.46 36180 6.0 51 PZAS


673.77 36124 6.0 51 PZAS
12.72 3688 0.6 51 PZAS
31.80 9216 1.5 51 PZAS
25.27 7324 1.2 51 PZAS
258.06 74800 12.5 51 PZAS
105.66 56352 9.4 51 PZAS
5.25 2800 0.5 51 PZAS
12.80 6824 1.1 51 PZAS
91.88 49000 8.2 51 PZAS

261.12 14000 2.3 51 PZAS


33.75 18000 3.0 51 PZAS
41.00 21868 3.6 51 PZAS
32.03 17080 2.8 51 PZAS
95.07
59.42

7,603.20 2160000
630.00 336000 56.0 51 PZAS
1,267.20 360000
989.10 70000 11.7 51 PZAS
27.00 14400 2.4 51 PZAS

0.00

6,641.15

5,491.53
3,661.02
0.00
5,491.53
62.50

87,897.12

5,749.92
5,749.92
4,312.44
4,312.44
7,187.39
300.00
93,876.17
7,187.39
7,187.39
7,187.39
400.00

143,450.45

231,347.57
34,702.14
266,049.70

1.85

532.10
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC. UNID.

MATERIALES

CERRAMIENTO
Panel TP 5 0,4 mm 3.90 kg/m2 cobertura Pza.

1 TU Cuadr.100 mm x 3.0 mm 9.40 kg/m x 1000 columnas Pza.


2 TU Cuadr.100 mm x 3.0 mm 9.40 kg/m x 6000 columnas Pza.

3 TU Rect.3" x 2" x 3.0 mm 7.62 kg/m x 3000 transversales Pza.


3 TU Rect.3" x 2" x 3.0 mm 7.62 kg/m x 600 transversales Pza.
3 TU Rect.3" x 2" x 3.0 mm 7.62 kg/m x 6000 transversales Pza.
3 TU Rect.3" x 2" x 3.0 mm 7.62 kg/m x 3000 transversales Pza.
3 TU Rect.3" x 2" x 3.0 mm 7.62 kg/m x 6000 transversales Pza.
3 TU Rect.3" x 2" x 3.0 mm 7.62 kg/m x 4000 transversales Pza.
9 Pl 1/2" 12.00 x 250 x 250 pl base col Pza.
9 Pl 3/8" 10.00 x 80 x 6000 cartelas col Pza.

3 TU Rect.3" x 2" x 3.0 mm 7.62 kg/m x 4000 correa cierre Pza.


1 TU Cuadr.2" x 3.0 mm 4.32 kg/m x 4000 correa intermedia Pza.

1 TU Cuadr.1 1/2" x 3.0 mm 3.63 kg/m x 4000 viga celosia Pza.


1 TU Cuadr.1 1/2" x 3.0 mm 3.63 kg/m x 750 viga celosia Pza.
1 TU Cuadr.1 1/2" x 3.0 mm 3.63 kg/m x 1200 viga celosia Pza.

2 Fierro redondo 1/2" 0.99 kg/m x 6000 refuerzos Pza.

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 3 mils
Capa intermedia
Acabado
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 200 US $ x sem 15 m altura
Mano de Obra 8 personas 4 semanas 5 kg/hh
Ingenieria
Supervision 1792
SCRT
Varios

Costo Total de Procesos

COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

A-36 1 2,613.00 6.50 670.00 4,355.00

A-36 15 141.00 0.66 6.12 93.06


A-36 15 846.00 0.55 36.72 465.30

A-36 15 342.90 0.60 11.43 205.74


A-36 15 68.58 0.60 2.29 41.15
A-36 15 685.80 0.60 22.86 411.48
A-36 15 342.90 0.60 11.43 205.74
A-36 15 685.80 0.60 22.86 411.48
A-36 15 457.20 0.60 15.24 274.32
A-36 120 707.40 1.20 15.00 848.88
A-36 4 150.91 1.00 3.84 150.91
2,583.18
A-36 42 1,280.16 0.60 42.67 768.10
A-36 42 725.76 0.66 34.27 479.00

A-36 28 406.56 0.66 17.92 268.33


A-36 70 190.58 0.66 8.40 125.78
A-36 56 243.94 0.66 10.75 161.00

A-36 56 332.64 1.30 7.39 7.39 432.43 7.72

9,697.70
0.95
10,221.12 269.19

122.65 4.20 515.14

1.50 269.19 403.79


2.50 269.19 672.98
0.00 269.19 0.00
2.50 269.19 672.98
10.00 3.00 30.00

10,221.12
269.19
11,992.58

10,221.12 0.04 408.84


10,221.12 0.04 408.84
10,221.12 0.03 306.63
10,221.12 0.03 306.63
10,221.12 0.06 613.27
2 200.00 1.00 400.00
10,221.12 3.60 2,044.22 7,359.21
10,221.12 0.07 715.48
10,221.12 0.05 511.06
10,221.12 0.05 511.06
800.00

560
3920 12,341.02
15680
4611.764706
24,333.61
23.00% 5,596.73
29,930.34

2.93
0.25
59.86
15000 2.5 51 PZAS
90000 15.0 51 PZAS

45000
9000
90000
45000
90000
60000

168000
168000 28.0 51 PZAS

112000 18.7 51 PZAS


52500 8.8 51 PZAS
67200 11.2 51 PZAS

7.722
COTIZACION
ITEM DESCRIPCION

1 FABRICACION Y MONTAJE DE TECHO METALICO 500 M2


9.00 M DE ANCHO X 56.00 M DE LARGO X 6.00 M DE ALTURA
ESPECIFICACIONES TECNICAS
COLUMNAS FABRICADAS A PARTIR DE TUBO CUADRADO DE 4", CON
PLANCHAS BASE DE 3/8" Y CARTELAS DE 1/4"
COLUMAS DEL LADO DEL MURO DE 1 M DE ALTURA (14 PZAS.)
COLUMNAS DEL LADO LIBRE DE 6 M DE ALTURA (14 PZAS.)
TIJERALES DE TUBO CUADRADO DE 1 1/2" (14 PIEZAS)
VIGUETAS DEL TECHO DE TUBO DE 3" x 1 1/2"
VIGUETAS ENTRE COLUMNAS LADO LIBRE DE TUBO CUAD. DE 1 1/2".
COBERTURA DEL TECHO TIPO TP - 5 DE 0.4 MM ALUZINC ACABADO NATURAL.
NOTA IMPORTANTE: ELCOSTO NO INCLUYE OBRAS CIVILES NI LOS PERNOS
DE ANCLAJE DE LA CIMENTACION DE LAS COLUMNAS.

FORMA DE PAGO:
50% CON LA ORDEN DE COMPRA
25 % A LOS 15 DIAS, SALDO CONTRA ENTREGA
TIEMPO DE ENTREGA:
04 SEMANAS
A PARTIR DE LA ENTREGA DE LA ORDEN DE COMPRA Y EL ADELANTO.

PREPARACION SUPERFICIAL LIMPIEZA MECANICA


PROTECCION SUPERFICIAL UNA CAPA DE PINTURA BASE Y UNA CAPA DE PINTURA DE ACABADO

EL COSTO INCLUYE
MANO DE OBRA CALIFICADA Y DIRECCION TECNICA, CON ESTANDARES DE SEGURIDAD
EQUIPOS Y HERRAMIENTAS
SEGURO COMPLEMENTARIO DE RIESGO Y TRABAJO

EL CLIENTE SUMINISTRARA
AREA DE TRABAJO PARA FABRICAR LOS ELEMENTOS ESTRUCTURALES
ENERGIA ELECTRICA EN LA ZONA DE TRABAJO
ALOJAMIENTO PARA NUESTRO PERSONAL ASIGNADO A OBRA
AREA SEGURA PARA ALMACENAJE DE NUESTROS EQUIPOS Y HERRAMIENTAS.
S/. GG+UTIL US $

20% 5,596.73

3,162.65
20%

MONTO TOTAL S/. 56,000.00 + IGV

#VALUE!
E PINTURA DE ACABADO #VALUE!
#VALUE!
#VALUE!
DE SEGURIDAD
COTIZACION
ITEM DESCRIPCION

1 FABRICACION Y MONTAJE DE CERRAMIENTO DE


14.00 M DE LARGO X 6.00 M DE ALTURA
TODO CON MATERIAL DESMONTADO DE LOS 2 GALPONES EXISTENTES (ITEM 4 )
INSTALACION DE DOS PUERTAS CORREDIZAS RECUPERADAS.
TIEMPO DE ENTREGA : 01 SEMANAS

2 FABRICACION Y MONTAJE DE CERRAMIENTO (44,10 M PERIMETRO) DE


26.50 M DE LARGO X 8.80 M DE ANCHO X 15 M ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 2.0 MM,
TUBO CUADRADO DE 3" X 3" X 2.0 MM
COBERTURA LATERAL TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
SE REUTILIZARA DEL ITEM 4:
130 M2 DE COBERTURA, PARA COLUMNAS 6 TUBOS DE 4" x 4" x 6.0 m,
PARA LOS ARRIOSTRES 67 metros de TUBO 4" x 2" Y 02 PUERTAS CORREDIZAS
TIEMPO DE ENTREGA : 03 SEMANAS

3 FABRICACION Y MONTAJE DE CERRAMIENTO DE


26.50 M DE LARGO X 12.50 M DE ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 2.0 MM,
TUBO CUADRADO DE 3" X 3" X 2.0 MM
COBERTURA LATERAL TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
SE CONSIDERA LA INSTALACION DE 01 PUERTAS CORREDIZA NUEVA.
TIEMPO DE ENTREGA : 02 SEMANAS

4 DESARMADO DE 02 AMBIENTES GALPONES EXISTENTES


9.90 M DE LARGO X 6.00 M DE ANCHO X 6.00 M ALTURA
PARA REUSAR MATERIAL
TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGULAR DE 4" X 2" X 3.0 MM Y COBERTURA TIPO TP - 4 DE 0.5 MM ESP.
INCLUYE DESMONTAJE Y MONTAJE EN NUEVA UBICACIÓN
DE EXTRACTORES
TIEMPO DE ENTREGA : 01 SEMANA

MONTO TOTAL US $

FORMA DE PAGO: 50% CON LA ORDEN DE COMPRA, SALDO CONTRA ENTREGA

PREPARACION SUPERFICIAL LIMPIEZA MECANICA


PROTECCION SUPERFICIAL UNA CAPA DE PINTURA BASE Y UNA CAPA DE PINTURA DE ACABADO

EL COSTO INCLUYE
MANO DE OBRA CALIFICADA Y DIRECCION TECNICA, CON ESTANDARES DE SEGURIDAD
EQUIPOS Y HERRAMIENTAS
SEGURO COMPLEMENTARIO DE RIESGO Y TRABAJO
EL CLIENTE SUMINISTRARA
ENERGIA ELECTRICA EN LA ZONA DE TRABAJO
AREA SEGURA PARA ALMACENAJE DE NUESTROS EQUIPOS Y HERRAMIENTAS.
US $ GG+UTIL US $

29,930.00 + IGV 20% 5,596.73

18,975.00 + IGV 3,162.65


20%

10,318.00 + IGV 1,719.67


20%

4,819.00 + IGV 963.69


25%

5,846.01
GG+UTIL TOTAL

64,042.00 + IGV

#VALUE!
DE ACABADO #VALUE!
#VALUE!
#VALUE!
PRESUPUESTO
CLIENTE:
OBRA
REFERENCIA
ELABORADO POR

ITEM DESCRIPCION PROC. UNID.

MATERIALES

CERRAMIENTO
Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza.
Panel TR 4 0,45 mm 4.50 kg/m2 cobertura Pza.

1 TU Cuadr.4" x 2.0 mm 6.17 kg/m x 15000 columnas Pza.


1 TU Cuadr.4" x 2.0 mm 6.17 kg/m x 15000 columnas Pza.
2 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 8800 transversales Pza.
3 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 26500 transversales Pza.
4 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 6700 arriostre Pza.
4 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 4700 arriostre Pza.
5 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 6500 arriostre Pza.
5 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 6500 arriostre Pza.
6 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 5100 arriostre Pza.
7 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 8700 arriostre Pza.
8 Pl 1/8" 3.00 x 300 x 300 cart tipo 1 Pza.
9 Pl 3/8" 9.00 x 300 x 300 pl base 8 aguj. Pza.

10 TU Rect.3" x 3" x 2.0 mm 4.58 kg/m x 3000 transversales Pza.


11 Riel Tipo Stanley 2.00 x 200 x 6000 cart tipo 1 Pza.

Soldadura
PROTECCION SUPERFICIAL
Arenado global
Pntura base 3 mil y acabado 3 mils
Capa intermedia
Acabado
Disco de esmeril

Peso Total
Area Total
Costo Total de Materiales

PROCESOS
Oxicorte
Equipos
Transporte materiales
Transporte estructuras a local
Transporte de equipos y herramientas
Andamios 200 US $ x sem 15 m altura
Mano de Obra 8 personas 3 semanas 6 kg/hh
Supervision
SCRT
Varios

Costo Total de Procesos

COSTO DE PRODUCCION
GASTOS GENERALES + UTILIDAD
VALOR VENTA TOTAL

RATIO
MAT. CANT. PESO PR. MAT. TIEMPO AREA P. PARCIAL P. TOTAL
Kg. US $ Hr. m2 US $ US $

A-36 1 2,731.50 8.10 607.00 4,916.70


A-36 1 472.50 0.00 105.00 0.00

A-36 10 925.50 0.82 61.20 758.91


A-36 7 647.85 0.00 42.84 0.00
A-36 12 483.65 0.82 24.29 396.59
A-36 6 728.22 0.82 36.57 597.14
A-36 8 245.49 0.82 12.33 201.30
A-36 4 86.10 0.82 4.32 70.61
A-36 8 238.16 0.82 11.96 195.29
A-36 0 0.00 0.82 0.00 0.00
A-36 4 93.43 0.82 4.69 76.61
A-36 2 79.69 0.82 4.00 65.35 609.16
A-36 52 110.35 1.20 9.36 132.43
A-36 24 152.80 1.20 4.32 183.36

A-36 10 137.40 0.85 9.18 116.79


A-36 2 37.73 1.40 4.80 52.82

7,170.37 229.86

86.04 4.20 361.39

1.50 215.88 323.83


2.50 215.88 539.71
2.50 215.88 539.71
0.00 215.88 0.00
25.00 3.00 75.00

7,170.37
215.88
9,603.53

7,170.37 0.01 71.70


7,170.37 0.03 215.11
7,170.37 0.03 215.11
7,170.37 0.03 215.11
7,170.37 0.02 143.41
2 200.00 2.00 800.00
7,170.37 3.20 1,195.06 3,824.20
7,170.37 0.05 358.52
7,170.37 0.05 358.52
600.00

6,801.68

16,405.21
20.00% 3,281.04
19,686.25

2.75
0.37
29.76
150000 25.0 51 PZAS
105000 17.5 51 PZAS
105600
159000
53600
18800
52000
0
20400
17400 71.1 84 PZAS

30000
400
COTIZACION
ITEM DESCRIPCION

1 FABRICACION Y MONTAJE DE CERRAMIENTO DE


14.00 M DE LARGO X 6.00 M DE ALTURA
A PARTIR DEL MATERIAL DESMONTADO DE GALPONES EXISTENTES (ITEM 4 )
INSTALACION DE UNA PUERTA CORREDIZA RECUPERADA Y OTRA NUEVA FABRICADA.
TIEMPO DE ENTREGA : 01 SEMANAS

2 FABRICACION Y MONTAJE DE CERRAMIENTO (44,10 M PERIMETRO) DE


26.50 M DE LARGO X 8.80 M DE ANCHO X 15 M ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 2.0 MM,
TUBO CUADRADO DE 3" X 3" X 2.0 MM
COBERTURA LATERAL TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
SE CONSIDERA LA INSTALACION DE 02 PUERTAS CORREDIZAS
TIEMPO DE ENTREGA : 03 SEMANAS

3 FABRICACION Y MONTAJE DE CERRAMIENTO DE


26.50 M DE LARGO X 12.50 M DE ALTURA
A PARTIR DE TUBO CUADRADO DE 4" X 2.0 MM,
TUBO CUADRADO DE 3" X 3" X 2.0 MM
COBERTURA LATERAL TIPO TP - 4 DE 0.45 MM ESP. PRE PINTADO (PRODACERO S.A.C.)
SE CONSIDERA LA INSTALACION DE 02 PUERTAS CORREDIZAS
TIEMPO DE ENTREGA : 03 SEMANAS

4 DESARMADO DE 02 AMBIENTES GALPONES EXISTENTES


9.90 M DE LARGO X 6.00 M DE ANCHO X 6.00 M ALTURA
PARA REUSAR MATERIAL
TUBO CUADRADO DE 4" X 3.0 MM,
TUBO RECTANGULAR DE 4" X 2" X 3.0 MM Y COBERTURA TIPO TP - 4 DE 0.5 MM ESP.
INCLUYE DESMONTAJE Y MONTAJE EN NUEVA UBICACIÓN
DE EXTRACTORES
TIEMPO DE ENTREGA : 01 SEMANA

NOTA 1: SE REUTILIZARA PARA EL ITEM 1, LOS MATERIALES QUE SE OBTENGAN


DEL DESARMADO DE LOS AMBIENTES CORRESPONDIENTES AL ITEM 4
NOTA 2: SE REUTILIZARA PARCIALMENTE PARA EL ITEM 2, LOS MATERIALES QUE SE OBTENGAN
DEL DESARMADO DE LOS AMBIENTES CORRESPONDIENTES AL ITEM 4
Panel TR 4 0,45 mm (105 m2) y TU Cuadr.4" x 3.0 mm x 15 m (07 pzas.)

MONTO TOTAL US $

FORMA DE PAGO: 50% CON LA ORDEN DE COMPRA, SALDO CONTRA ENTREGA

PREPARACION SUPERFICIAL LIMPIEZA MECANICA


PROTECCION SUPERFICIAL UNA CAPA DE PINTURA BASE Y UNA CAPA DE PINTURA DE ACABADO

EL COSTO INCLUYE
MANO DE OBRA CALIFICADA Y DIRECCION TECNICA, CON ESTANDARES DE SEGURIDAD
EQUIPOS Y HERRAMIENTAS
SEGURO COMPLEMENTARIO DE RIESGO Y TRABAJO

EL CLIENTE SUMINISTRARA
ENERGIA ELECTRICA EN LA ZONA DE TRABAJO
AREA SEGURA PARA ALMACENAJE DE NUESTROS EQUIPOS Y HERRAMIENTAS.
US $ GG+UTIL US $

29,930.00 + IGV 20% 5,596.73

19,686.00 + IGV 20% 3,281.04

10,318.00 + IGV 20% 1,719.67

4,819.00 + IGV 25% 963.69

GG+UTIL TOTAL 5,964.40

E OBTENGAN

64,753.00 + IGV

#VALUE! #VALUE!