NOTES:

1. The Contractor shall carefully examine, compare and verify the data
furnishedby the drawingsand specifications.Any doubt as to the meaning
of the drawings(includingnotes thereon)or of the specificationsor of any
errors/ omissionsafter its discovery,any work involvingsuch discrepancies
shall be done at the contractor's risk.
2. This drawing to be read in conjunctionwith all relevant Engineer'sand
Architect's drawings and with all relevant specifications.
3. All dimensions are in millimeters unless noted otherwise.
4. Drawings are not to be scaled.
5. 28 days concrete strength is 40 MPa
6. Steel reinforcement shall confirm to IS:1786-2008, fy = 500 MPa
7. P.C.C. Shall be of 15 MPa; 75mm Thickness below the Tank
8. If the soil at tentative founding level is not suitable, the same shall be
removed and replaced with mass concreteck=20
of f MPa.
9. Prior to laying the mass concrete layer, the founding material shall be
inspected and tested to the satisfaction of client representative.
10. The excavationwork up to the proposedfoundinglevel shall be carriedout
KEY PLAN
PLAN with due care to avoid excessive disturbance to the soil at founding level.
SCALE = 1: 20 11. If disturbanceto the foundingmaterialis occurred,the disturbedmaterial REVISIONS

shall be removed and replaced with mass concrete REV DESCRIPTIONS DRW CHK APR DATE
ck=20
of f MPa.
NO. BY BY BY
12. Adequatetemporarydrainage should be provided for excavatedarea to
divert all surface water from reaching the excavated area and footing.

TANK 13. Bore hole shall be sunk to confirmthe raft foundinglevel to agree with the
client representative.Later, the bore holes shall be filled with concreteof
PLAN
SCALE = 1: 20 fck=20 MPa.
14. Foundationshall rest on dense sandy silt/silty sand with minimum safe
bearing capacity 200 kPa. Value is assumedas per our discussionwith
client. Based on Clients confirmation;level of Footing is shown in the
Drawing.
15. Uniformcompactionof backfill all around the structuralelementsshall be
OWNER:
SECTION 2 done ensuring on lateral pressure is applied to the structural element.

SCALE = 1:20 - 16. No water table was encounteredin any of the boreholes during field
investigation.

SECTION A MAN HOLE SLAB


SCALE = 1:20 - PLAN
SCALE = 1: 20

THIS DRAWING IS BASED ON THE FOLLOWING INFORMATION:


DRAWINGS RECEIVED ON :- 14/12/2018

SECTION 1 STRUCTURAL CONSULTANTS:


SCALE = 1:20 -
SLABS
SLABS Engineering Private Limited
World Trade Center, Level 9, Tower 2,
Opp. Eon Free Zone,
SECTION 5 Kharadi, Pune - 411 014
Telephone +91 20 46923489
SCALE = 1:20 - Email: contact@slabsc.com
www.slabsc.com

LICENSE NO. 525 A


PROJECT:
UNDER GROUND PRECAST
WATER TANK

DRAWING TITLE:

SECTION 6 UG PRECAST WATER TANK


SECTION 3 SECTION 4 - CONCRETE PROFILE.
SCALE = 1:20 - - SCALE = 1:20
SCALE = 1:20

PURPOSE OF ISSUE: PROJECT CODE


GOOD FOR CONSTRUCTION 252909
SCALE: 1:20 DATE: 07/01/2019 SHEET SIZE: A1

DRW BY: SK CHK BY: SVM APR BY : SL

COVER SLAB This drawing is property of SLABS Engineering Pvt. Ltd.


and cannot be reproduced without written consent.
PLAN Do not scale the dimensions of drawing.
SCALE = 1: 20
DRAWING NUMBER REV.
SEPL-UG TANK-S-101 0

Vous aimerez peut-être aussi