Vous êtes sur la page 1sur 13

VOLUME DAN HARGA LUMP SUM

(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)

2 PEKERJAAN INFRASTRUKTUR -
2.1 PEKERJAAN JALAN -
Earth Work -
Soil Excavation 1,260.00 m3 -
Soil Disposal 1,260.00 m3 -
Free from tree,grass and unused
Site Grading 4,156.00 m2 -
material
Access Road (Flexible Pavement) -
- Wearing Course (t = 30 mm) HRS = Hot Rolled Sheet /Laston 108.00 m3 -
- Binder Course (t = 70 mm) ATB = Asphalt Treated Base 252.00 m3 -
- Base Course (Sand Gravel+ Asphalt Spray, t = 100 mm) 360.00 m3 -
- Sub Base (Gravel, t = 150 mm) 540.00 m3 -
- shoulder (Gravel, t = 100 mm) 81.41 m3 - N/A
Additional access road
- Excavation 165.00 m3 -
- Soil backfilling 165.00 m3 -
- Concrete culvert Box K350 (1200mm x 1600mm) 100.00 ea -
- Open ditch 150.00 m -
- Wearing Course (t = 30 mm) 27.00 m3 -
- Binder Course (t = 70 mm) 63.00 m3 -
- Base Course (Sand Gravel+ Asphalt Spray, t = 100 mm) 90.00 m3 -
- Sub Base (Gravel, t = 150 mm) 135.00 m3 -
- shoulder (Gravel, t = 100 mm) 78.75 m3 -
Dismantle Wall & reinstall to new location - N/A
,- Dismantle existing wall 375.00 m2 -
,- Reinstall at new locationl 375.00 m2 -
,- Dismantle existing building (incl. Disposal cleaning) 60.00 m2 -
- Street LED Light (106 W, 230 VAC, 50 Hz STREET LED
6.00 ea -
LIGHT, STANCHION TYPE C/W 6M LIGHTING POLE)
2.2 PEKERJAAN PAGAR -
Fencing -
Barbed Wire 5 layers, 2.5m height
Fencing Work & Miscellaneous 43.00 m -
(Steel Heavily Galvanized)
2.3 PEKERJAAN SALURAN -
Earth Work -
Soil Excavation 263.13 m3 -
Soil Disposal 157.88 m3 -
Compacted Subgrade 305.08 m2 -
Sand 45.76 m3 -
Concrete Work -
Polyethylene Sheet 305.08 m2 -
fc = 35 Mpa, Cement Type I, Wide
U-Ditch Precast Concrete 762.70 m -
= 300~600 mm, Depth = 300~1200
MANHOLE -
Earth Work -
Soil Excavation 12.51 m3 -
Soil Disposal 12.51 m3 -
Compacted Subgrade 13.31 m2 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.79 m3 -
Formwork - Dinding Smooth multiplex form 26.14 m2 -
ASTM A615 grade 60, JIS G3122
Rebar 1.23 ton -
SD390 or equivalent
Concrete 100 mm thk fc = 21 Mpa, Cement Type I 8.18 m3 -

ORF - Civil Page 1 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Miscellaneous -
Grating 25 mm thk 29.75 m2 -
Reinforced Concrete Pipe 0.5 m diameter L = 19 meters 19.00 m -
2.4 PEKERJAAN JEMBATAN (CANCELLED) - N/A
PERMANENT BRIDGE
Abutment
Earth Works -
Pilecap Excavation 36.55 m3 -
Soil Disposal 36.55 m3 -
Compacted Subgrade 29.24 m2 -
Compacted Backfill m3 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.46 m3
Formwork - Kolom Smooth multiplex form 24.24 m2
ASTM A615 grade 60, JIS G3122
Reinforcement 4.90 ton
SD390 or equivalent
Pilecap Concrete fc = 28 Mpa, Cement Type I / V 32.64 m3
PC Pile Ø 400 mm with length 20 m fc = 41,5 Mpa, Cement Type I 12.00 ea
Bridge Slab -
Formwork - Lantai Smooth multiplex form 25.50 m2
ASTM A615 grade 60, JIS G3122
Reinforcement 1.53 ton
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 10.20 m3
Approach Slab -
Formwork - Lantai Smooth multiplex form 6.80 m2
ASTM A615 grade 60, JIS G3122
Reinforcement 0.41 ton
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 2.72 m3
Girder Beam -
H 400 x 200 x 8 x13 ASTM A36 2.31 ton
W Shaped Guard Rail c/w C180x75x7x10.5 ASTM A123 Hot dip galvanized 24.00 m
Retaining wall with stone masonry 55.25 m3
Pipe 4 Inch 22.00 m
Elastomeric Bearing Pads 300 x 300 10.00 ea
2.5 PEKERJAAN PONDASI GENERATOR -
2.5.1 FOUNDATION -
Earth Work -
Soil Excavation 19.20 m3 -
Compacted Backfill 9.30 m3 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.00 m3 -
Concrete fc = 21 Mpa, Cement Type I 15.30 m3 -
Formwork - Sloop Smooth multiplex form 7.65 m3 -
ASTM A615 grade 60, JIS G3122
Rebar 1.53 ton -
SD390 or equivalent
2.6 PEKERJAAN SHELTER AIR PEMADAM -
2.6.1 FOUNDATION -
Earth Works -
Excavation 3.53 m3 -
Soil Disposal 1.80 m3 -
Soil Backfill 1.73 m3 -
Compacted Subgrade 8.82 m2 -
Concrete Works -
Foundation -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.26 m3 -
Formwork - Lantai Smooth multiplex form 2.40 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.40 ton -
SD390 or equivalent

ORF - Civil Page 2 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Concrete fc = 28 Mpa, Cement Type I 2.65 m3 -
2.6.2 PEDESTAL WORKS -
Earth Works -
Excavation 4.41 m3 -
Soil Disposal 0.16 m3 -
Soil Backfill 2.89 m3 -
Pedestal -
Formwork - Lantai Smooth multiplex form 0.14 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.04 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I 0.27 m3 -
Anchor bolt M24 Type 1 ASTM A307 grade C or equivalent 8.00 ea -
2.6.3 SLAB FLOOR WORKS (5m x 2m) ea -
Earth Works -
Soil Backfill 0.50 m3 -
Compacted Subgrade 10.00 m2 -
Slab Floor -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.50 m3 -
Formwork - Lantai Smooth multiplex form 2.10 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.45 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I 3.00 m3 -
2.6.4 BEAM ea -
Earth Works -
Excavation 4.28 m3 -
Soil Disposal 1.40 m3 -
Soil Backfill 2.88 m3 -
Compacted Subgrade 3.50 m2 -
Slab Floor -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.09 m3 -
Formwork - Lantai Smooth multiplex form 2.00 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.21 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I 1.40 m3 -
2.6.5 STEEL -
Steel Frame ASTM A36 1.65 ton -
Purlin, Connection, and Plate connection ASTM A36 0.25 ton -
2.6.6 ROOFING
Roof
Metal Sheet 0.45 Zincalume Colorbond 66.00 m2 -
2.7 PEKERJAAN KOLAM PEMADAM -
2.7.1 POND -
Earthwork -
Soil Excavation 973.73 m3 -
Soil Disposal 1,067.34 m3 -
Compacted Subgrade 321.70 m2 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 16.09 m3 -
Formwork - Dinding Smooth multiplex form 176.21 m2 -
Wall Concrete fc = 28 Mpa, Cement Type I 47.93 m3 -
Concrete Bottom Slab fc = 28 Mpa, Cement Type I 95.34 m3 -
Concrete Top Slab fc = 28 Mpa, Cement Type I 2.50 m3 -
Concrete Beam 30/40 fc = 28 Mpa, Cement Type I 1.26 m3 -
Concrete Column 40/40 fc = 28 Mpa, Cement Type I 0.74 m3 -
RC Pipe 300 fc = 28 Mpa, Cement Type I - m - N/A
Grouting fc = 48 Mpa, Non Shrink Grout 0.01 m3 -
ASTM A615 grade 60, JIS G3122
Rebar 32.51 ton -
SD390 or equivalent

ORF - Civil Page 3 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
2.7.2 FENCE -
Earthwork -
Soil Excavation 14.90 m3 -
Soil Disposal 1.66 m3 -
Compacted Subgrade 7.68 m2 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.37 m3 -
Formwork - Kolom Smooth multiplex form 12.00 m2 -
Concrete fc = 28 Mpa, Cement Type I 2.07 m3 -
ASTM A615 grade 60, JIS G3122
Rebar 0.36 ton -
SD390 or equivalent
Fence Work -
Pipe 2' - m - N/A
Fence 2 m height of corrugated wire fence 79.80 m -
Gate Single swing gate with 1 m opening - ea -
2.8 PEKERJAAN KOLAM AIR BERSIH -
Earthwork -
Soil Excavation 125.30 m3 -
Soil Disposal 85.96 m3 -
Compacted Subgrade 33.06 m2 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.71 m3 -
Formwork - Dinding Smooth multiplex form 82.16 m2 -
Wall Concrete fc = 28 Mpa, Cement Type I 20.54 m3 -
Concrete Bottom Slab fc = 28 Mpa, Cement Type I 8.27 m3 -
Concrete Top Slab fc = 28 Mpa, Cement Type I 7.22 m3 -
Concrete Cover 1400x1400 fc = 28 Mpa, Cement Type I 3.00 ea -
ASTM A615 grade 60, JIS G3122
Rebar 5.40 ton -
SD390 or equivalent
2.9 PEKERJAAN TIANG LAMPU -
Earth Work -
Soil Excavation 78.00 m3 -
Compacted Backfill 63.00 m3 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.60 m3 -
Concrete fc = 21 Mpa, Cement Type I 15.00 m3 -
Formwork - Kolom Smooth multiplex form 37.80 m3 -
ASTM A615 grade 60, JIS G3122
Rebar 1.50 ton -
SD390 or equivalent
2.10 PEKERJAAN SEPTICTANK BIOTECH (CANCELLED) - NA
Earthwork
Soil Excavation m3
Soil Disposal m3
Compacted Subgrade m2
Concrete Work
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I m3
Formwork - Dinding Smooth multiplex form m2
Wall Concrete fc = 28 Mpa, Cement Type I m3
Concrete Bottom Slab fc = 28 Mpa, Cement Type I m3
ASTM A615 grade 60, JIS G3122
Rebar ton
SD390 or equivalent
2.11 PERSIAPAN LAHAN (CANCELLED) - NA
For Building + Outside Building -
Compacted Backfill m3
For Fire Water Underground -
Compacted Backfill m3
For Electrical Unferground -
Compacted Backfill m3

ORF - Civil Page 4 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Grassing m2
2.12 PEKERJAAN PONDASI KONTAINER -
Earth Work -
Soil Excavation 9.00 m3 -
Soil Disposal 4.13 m3 -
Compacted Subgrade 18.75 m2 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.13 m3 -
Concrete 100 mm thk fc = 21 Mpa, Cement Type I 9.75 m3 -
Formwork - Sloop Smooth multiplex form 9.00 m3 -
ASTM A615 grade 60, JIS G3122
Rebar 0.98 ton -
SD390 or equivalent
2.13 PEKERJAAN TEMPORARY BRIDGE (CANCELLED) - NA
Earth Works
Excavation m3
Soil Disposal m3
Compacted Subgrade m3
Compacted Backfill m2
Bridge Slab -
Plate 25 THK ton
Girder Beam -
H 200x100x5,5x8 ASTM A36 ton
C 100x50x5x7,5 ASTM A36 ton
Bolt, Gusset plate, Stud (10% Total Weight) ASTM A36 ton
3 PEKERJAAN BANGUNAN -

3.1 STRUKTUR -
3.1.1 FOUNDATION -
Foundation F1 -
Earth Works -
Pilecap Excavation 41.11 m3 -
Soil Disposal 41.11 m3 -
Compacted Subgrade 63.25 m2 -
Compacted Backfill - m3 - N/A
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 3.16 m3 -
Formwork - Sloop Smooth multiplex form 48.00 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 3.63 ton -
SD390 or equivalent
Pilecap Concrete fc = 28 Mpa, Cement Type I / V 33.00 m3 -
PC Pile Ø 400 mm with length 20 m fc = 41,5 Mpa, Cement Type I 50.00 ea -
Foundation F2 -
Earth Works -
Excavation 6.88 m3 -
Soil Disposal 6.88 m3 -
Compacted Subgrade 10.58 m2 -
Compacted Backfill - m3 -
Pilecap -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.53 m3 -
Formwork - Sloop Smooth multiplex form 5.28 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.64 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 5.81 m3 -
PC Pile Ø 400 mm with length 20 m fc = 41,5 Mpa, Cement Type I 6.00 ea -
3.1.2 COLUMN & BEAM -
Column 1 600 mm x 300 mm -

ORF - Civil Page 5 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Formwork - Kolom Smooth multiplex form 153.09 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 4.59 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 30.62 m3 -
Column 2 400 mm x 400 mm
Formwork - Kolom Smooth multiplex form 61.44 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.84 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 12.29 m3 -
Tie Beam 1 300 mm x 500 mm -
Earth Works -
Excavation 25.06 m3 -
Soil Disposal 25.06 m3 -
Compacted Subgrade 45.56 m2 -
Compacted Backfill - m3 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 2.28 m3 -
Formwork - Balok Smooth multiplex form 56.95 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.56 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 17.09 m3 -
Tie Beam 2 300 mm x 500 mm -
Earth Works -
Excavation 20.68 m3 -
Soil Disposal 20.68 m3 -
Compacted Subgrade 37.60 m2 -
Compacted Backfill - m3 - N/A
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.88 m3 -
Formwork - Balok Smooth multiplex form 61.10 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.12 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 14.10 m3 -
Tie Beam 3 250 mm x 400 mm -
Earth Works -
Excavation 15.91 m3 -
Soil Disposal 15.91 m3 -
Compacted Subgrade 35.35 m2 -
Compacted Backfill - m3 - N/A
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.77 m3 -
Formwork - Balok Smooth multiplex form 53.03 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.52 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 10.10 m3 -
Upper Floor Beam 1 300 mm x 600 mm -
Formwork - Balok Smooth multiplex form 110.12 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 3.78 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 25.17 m3 -
Upper Floor Beam 2 300 mm x 600 mm -
Formwork - Balok Smooth multiplex form 81.04 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.78 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 18.52 m3 -
Upper Floor Beam 3 250 mm x 400 mm -
Formwork - Balok Smooth multiplex form 28.84 m2 -

ORF - Civil Page 6 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
ASTM A615 grade 60, JIS G3122
Reinforcement 0.75 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 4.98 m3 -
Roof Beam 1 250 mm x 450 mm -
Formwork - Balok Smooth multiplex form 100.24 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.73 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 18.17 m3 -
Roof Beam 2 250 mm x 450 mm -
Formwork - Balok Smooth multiplex form 66.93 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.82 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 12.13 m3 -
Roof Beam 3 250 mm x 350 mm -
Formwork - Balok Smooth multiplex form 35.86 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.87 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 5.81 m3 -
3.1.3 FLOOR & ROOF -
Ground Floor Slab -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I - m3 - N/A
Polyethylene Sheet 595.39 m2 -
Formwork - Lantai Smooth multiplex form 9.92 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 8.93 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 71.45 m3 -
Compacted Subgrade 595.39 m2 -
Upper Floor Slab -
Formwork - Lantai Smooth multiplex form 275.38 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 8.93 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 71.45 m3 -
Roof Slab -
Formwork - Lantai Smooth multiplex form 320.16 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 9.60 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 76.84 m3 -
3.1.4 STAIR -
Stair 1 -
Stair Plate Formwork - Tangga Smooth multiplex form 8.70 m2 -
Stair Tread Formwork - Tangga Smooth multiplex form 1.16 m2 -
Reinforcement ASTM A36 0.40 ton -
Stair Plate Concrete (including stair landing) fc = 28 Mpa, Cement Type I / V 1.80 m3 -
Stair Tread 280 mm x 180 mm fc = 28 Mpa, Cement Type I / V 0.87 m3 -
Stair 2 -
Stair Plate Formwork - Tangga Smooth multiplex form 32.71 m2 -
Stair Tread Formwork - Tangga Smooth multiplex form 2.42 m2 -
Reinforcement ASTM A36 1.29 ton -
Stair Plate Concrete (including stair landing) fc = 28 Mpa, Cement Type I / V 6.77 m3 -
Stair Tread 280 mm x 180 mm fc = 28 Mpa, Cement Type I / V 1.81 m3 -
3.1.5 HALL -
Hall Slab -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I - m3 - N/A
Polyethylene Sheet 100.00 m3 -
Formwork - Lantai Smooth multiplex form 9.92 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.80 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 12.00 m3 -

ORF - Civil Page 7 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Compacted Subgrade 100.00 m2 -
3.1.6 CANOPY BUILDING -
Foundation -
Earth Works -
Pilecap Excavation 10.87 m3 -
Soil Disposal 4.94 m3 -
Compacted Subgrade 9.84 m2 -
Compacted Backfill 5.93 m3 -
Pedestal -
Formwork - Sloop Smooth multiplex form 1.92 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.08 ton -
SD390 or equivalent
Concrete fc = 24,03 Mpa, Cement Type I 0.77 m3 -
Grouting fc = 48 Mpa, Non Shrink Grout 0.05 m3 -
Footing -
Lean Concrete 50 mm thk. fc = 13,5 Mpa, Cement Type I 0.49 m3 -
Formwork - Lantai Smooth multiplex form 2.52 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.40 ton -
SD390 or equivalent
Slab Concrete fc = 24,03 Mpa, Cement Type I 3.68 m3 -
Steel Column & Beam -
ASTM A36, JIS 3101 SS 400 or
Steel Frame -
equivalent
ST PIPE Ø 14" (Column) 0.81 ton -
ST H 588x300x12x20 (Beam) 4.04 ton -
ST H 400x200x8x13 (Beam) 2.23 ton -
ST H 350x175x7x11 (Beam) 2.37 ton -
ST C 150x75x6,5x10 (Rafter) 0.78 ton -
ST L 50x50x6 (Eave) - ton - N/A
Bolt, Gusset plate, Stud (10% Total Weight) 600 mm x 300 mm 1.10 ton -
Steel Column & Beam -
Floor Deck 193.49 m2 -
Concrete Slab fc = 24,03 Mpa, Cement Type I 14.90 m3 -
ASTM A185 or JIS G 3551 or
Wire mesh (M8-150) 193.49 m2 -
equivalent
Formwork (inner section) Smooth multiplex form 1.38 m2 -
Formwork (outer section) Smooth multiplex form 21.93 m3 -
3.1.7 BRIDGE BUILDING (OFFICE TO MEETING FUNCTION/MEETING BUILDING) -
Foundation -
Earth Works -
Pilecap Excavation 40.32 m3 -
Soil Disposal 37.19 m3 -
Compacted Subgrade 4.84 m2 -
Compacted Backfill 3.13 m3 -
Pilecap -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.24 m3 -
Formwork - Sloop Smooth multiplex form 4.80 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.26 ton -
SD390 or equivalent
Pilecap Concrete fc = 24,03 Mpa, Cement Type I / V 2.40 m3 -
PC Pile Ø 400 mm with length 20 m fc = 41,5 Mpa, Cement Type I 4.00 ea -
Column & Beam -
Column 600 mm x 300 mm -
Formwork - Kolom Smooth multiplex form 23.70 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.47 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 4.27 m3 -

ORF - Civil Page 8 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Tie Beam -
Earth Works -
Excavation 35.57 m3 -
Soil Disposal 33.77 m3 -
Compacted Subgrade 5.99 m2 -
Compacted Backfill 1.80 m3 -
Concrete Works -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.30 m3 -
Formwork - Sloop Smooth multiplex form 5.99 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.16 ton -
SD390 or equivalent
Pilecap Concrete fc = 24,03 Mpa, Cement Type I / V 1.50 m3 -
Upper Floor Slab -
Formwork - Lantai Smooth multiplex form 17.77 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.45 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 4.10 m3 -
Roof Beam 600 mm x 300 mm -
Formwork - Balok Smooth multiplex form 15.72 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.34 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 3.08 m3 -
3.2 MEETING & MULTIFUNCTION -
3.2.1 FOUNDATION -
Foundation F1 -
Earth Works -
Pilecap Excavation 3.30 m3 -
Soil Disposal 3.30 m3 -
Compacted Subgrade 5.07 m2 -
Compacted Backfill - m3 - N/A
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.25 m3 -
Formwork - Sloop Smooth multiplex form 4.32 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.29 ton -
SD390 or equivalent
Pilecap Concrete fc = 28 Mpa, Cement Type I / V 2.59 m3 -
PC Pile Ø 400 mm with length 20 m fc = 41,5 Mpa, Cement Type I 3.00 ea -
Foundation F2 -
Earth Works -
Excavation 31.10 m3 -
Soil Disposal 31.10 m3 -
Compacted Subgrade 47.84 m2 -
Compacted Backfill - m3 - N/A
Pilecap -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 2.39 m3 -
Formwork - Sloop Smooth multiplex form 32.64 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.79 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 25.34 m3 -
PC Pile Ø 400 mm with length 20 m fc = 41,5 Mpa, Cement Type I 32.00 ea -
Foundation F3 -
Earth Works -
Excavation 6.88 m3 -
Soil Disposal 6.88 m3 -
Compacted Subgrade 10.58 m2 -
Compacted Backfill - m3 - N/A
Pilecap -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.53 m3 -

ORF - Civil Page 9 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Formwork - Sloop Smooth multiplex form 5.28 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.64 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 5.81 m3 -
PC Pile Ø 400 mm with length 20 m fc = 41,5 Mpa, Cement Type I 6.00 ea -
3.2.2 COLUMN & BEAM -
Column 1 600 mm x 300 mm -
Formwork - Kolom Smooth multiplex form 52.43 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.57 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 10.49 m3 -
Column 2 300 mm x 300 mm -
Formwork - Kolom Smooth multiplex form 13.56 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.31 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 2.03 m3 -
Column 3 400mm x 400 mm -
Formwork - Kolom Smooth multiplex form 114.40 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 3.43 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 22.88 m3 -
Column 4 750mm x 300 mm -
Formwork - Kolom Smooth multiplex form 24.47 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.79 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 5.24 m3 -
Tie Beam 1 300 mm x 500 mm -
Earth Works -
Excavation 32.63 m3 -
Soil Disposal 32.63 m3 -
Compacted Subgrade 59.33 m2 -
Compacted Backfill - m3 - N/A
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 2.97 m3 -
Formwork - Balok Smooth multiplex form 74.16 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 3.34 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 22.25 m3 -
Tie Beam 2 250 mm x 350 mm -
Earth Works -
Excavation 1.87 m3 -
Soil Disposal 1.87 m3 -
Compacted Subgrade 6.23 m2 -
Compacted Backfill - m3 - N/A
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 0.31 m3 -
Formwork - Balok Smooth multiplex form 5.60 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.19 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 1.25 m3 -
Sloof 200 mm x 300 mm -
Concrete Work -
Formwork Smooth multiplex form 46.91 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.06 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 7.04 m3 -
Upper Floor Beam 1 300 mm x 500 mm -

ORF - Civil Page 10 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Formwork - Lantai Smooth multiplex form 114.92 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 3.88 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 25.86 m3 -
Upper Floor Beam 2 300 mm x 500 mm -
Formwork - Lantai Smooth multiplex form 36.37 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.07 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 7.12 m3 -
Roof Beam 1 300 mm x 400 mm -
Formwork - Lantai Smooth multiplex form 100.55 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.87 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 19.15 m3 -
Roof Beam 2 200 mm x 300mm -
Formwork - Lantai Smooth multiplex form 33.21 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.95 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 6.33 m3 -

3.2.3 FLOOR & ROOF -


Ground Floor Slab -
Polyethylene Sheet 308.58 m2 -
Formwork - Lantai Smooth multiplex form 11.93 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 4.44 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 37.03 m3 -
Compacted Subgrade 308.58 m2 -
Upper Floor Slab -
Formwork - Lantai Smooth multiplex form 154.29 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 4.63 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 37.03 m3 -
Roof Slab +11.650 -
Formwork Smooth multiplex form 108.07 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 3.24 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 25.94 m3 -
Roof Slab +14.300 -
Formwork Smooth multiplex form 29.82 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.89 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 7.16 m3 -
Roof Slab (water tank area) -
Formwork Smooth multiplex form 16.40 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.62 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 4.92 m3 -
3.2.4 STAIR -
Stair 1 -
Stair Plate Formwork - Tangga Smooth multiplex form 70.50 m2 -
Stair Tread Formwork - Tangga Smooth multiplex form 3.32 m2 -
Stair Beam Formwork - Tangga Smooth multiplex form 12.68 m2 -
Reinforcement ASTM A36 3.70 ton -
Stair Plate Concrete (including stair landing) fc = 28 Mpa, Cement Type I / V 16.93 m3 -
Stair Tread 280 mm x 180 mm fc = 28 Mpa, Cement Type I / V 5.22 m3 -
Concrete Beam 25/45 fc = 28 Mpa, Cement Type I / V 2.48 m3 -
Stair 2 -

ORF - Civil Page 11 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Stair Plate Formwork - Tangga Smooth multiplex form 64.35 m2 -
Stair Tread Formwork - Tangga Smooth multiplex form 3.28 m2 -
Stair Beam Formwork - Tangga Smooth multiplex form 12.38 m2 -
Reinforcement ASTM A36 3.51 ton -
Stair Plate Concrete (including stair landing) fc = 28 Mpa, Cement Type I / V 15.87 m3 -
Stair Tread 280 mm x 180 mm fc = 28 Mpa, Cement Type I / V 5.10 m3 -
Concrete Beam 25/45 fc = 28 Mpa, Cement Type I / V 2.42 m3 -

3.3 MESS -
3.3.1 FOUNDATION -
Foundation F1 -
Earth Works -
Pilecap Excavation 22.82 m3 -
Soil Disposal 13.65 m3 -
Compacted Subgrade 21.00 m2 -
Compacted Backfill 9.17 m3 -
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.27 m3 -
Formwork - Sloop Smooth multiplex form 24.60 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.89 ton -
SD390 or equivalent
Pilecap Concrete fc = 28 Mpa, Cement Type I / V 12.60 m3 -
PC Pile Ø 400 mm with length 20 m fc = 41,5 Mpa, Cement Type I 20.00 ea -

3.3.2 COLUMN & BEAM -


Column 1 450 mm x 250 mm -
Formwork - Kolom Smooth multiplex form 51.80 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.00 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 8.33 m3 -
Column 2 450 mm x 250 mm -
Formwork - Kolom Smooth multiplex form 51.80 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.00 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 8.33 m3 -
Tie Beam 1 250 mm x 350 mm -
Earth Works -
Excavation 12.46 m3 -
Soil Disposal 12.46 m3 -
Compacted Subgrade 31.15 m2 -
Compacted Backfill - m3 - N/A
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.56 m3 -
Formwork - Balok Smooth multiplex form 31.15 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.01 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 7.79 m3 -
Tie Beam 2 250 mm x 300 mm -
Earth Works -
Excavation 12.79 m3 -
Soil Disposal 12.79 m3 -
Compacted Subgrade 36.54 m2 -
Compacted Backfill - m3 - N/A
Concrete Work -
Lean Concrete 50 mm thk. fc = 17.5 Mpa, Cement Type I 1.83 m3 -
Formwork - Balok Smooth multiplex form 31.32 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.17 ton -
SD390 or equivalent

ORF - Civil Page 12 / 13


VOLUME DAN HARGA LUMP SUM
(Termasuk Bahan, Peralatan, Upah Dan Pemasangan)

NO URAIAN PEKERJAAN Spesifikasi Volume Satuan Harga Satuan Subtotal Biaya KETERANGAN
(Rp) (Rp)
Concrete fc = 28 Mpa, Cement Type I / V 7.83 m3 -
Upper Floor Beam 1 300 mm x 600 mm -
Formwork - Lantai Smooth multiplex form 14.26 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.39 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 2.79 m3 -
Upper Floor Beam 2 300 mm x 600 mm -
Formwork - Lantai Smooth multiplex form 21.27 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.51 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 3.92 m3 -
Upper Floor Beam 3 250 mm x 400 mm -
Formwork - Lantai Smooth multiplex form 21.27 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 0.51 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 3.92 m3 -
Roof Beam 1 250 mm x 450 mm -
Formwork - Lantai Smooth multiplex form 51.28 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.23 ton -
SD390 or equivalent
Concrete fc = 28 Mpa, Cement Type I / V 9.45 m3 -

3.3.3 FLOOR & ROOF -


Ground Floor Slab -
Polyethylene Sheet 189.20 m2 -
Formwork - Lantai Smooth multiplex form 4.10 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.72 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 22.70 m3 -
Compacted Subgrade 189.20 m2 -
Upper Floor Slab -
Formwork - Lantai Smooth multiplex form 73.45 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 2.72 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 22.70 m3 -
Roof Slab -
Formwork - Lantai Smooth multiplex form 63.15 m2 -
ASTM A615 grade 60, JIS G3122
Reinforcement 1.86 ton -
SD390 or equivalent
Slab Concrete fc = 28 Mpa, Cement Type I / V 15.53 m3 -
3.3.4 STAIR -
Stair 1 -
Stair Plate Formwork - Tangga Smooth multiplex form 7.24 m2 -
Stair Tread Formwork - Tangga Smooth multiplex form 1.11 m2 -
Reinforcement ASTM A36 0.34 ton -
Stair Plate Concrete (including stair landing) fc = 28 Mpa, Cement Type I / V 1.49 m3 -

TOTAL CIVIL WORK -

ORF - Civil Page 13 / 13

Vous aimerez peut-être aussi