ASSIGNMENT 2
GROUPING
SEPT/OCT SEMESTER 2018

BACHELOR OF CIVIL ENGINEERING

CONSTRUCTION PROJECT MANAGEMENT


(CIVE4406)

Group members name and Id Numbers:

1
2
3
4
5

GENERAL INSTRUCTIONS

1. This question booklet consists of 2 printed pages including this page.

Total marks Marks Score

Total

CONFIDENTIAL
QUESTION

In 1993 the PMI defined WBS as ‘a task-oriented “family tree” of activities which
organizes defines, and graphically displays the total work to be accomplished in order to
achieve the final objectives of the project

The Work Breakdown Structure provides sub-divisions of project objectives, based on


a network plan linking all levels of the WBS, from the highest (client) to the lowest (specific
job).
In addition project tasks are divided into ‘manageable units’ based on cost, resources
and time data available for the additional purposes of ‘tracking’ and reporting. WBS is also
perceived as a tool for managers specifically for planning and control activities

As a Project Manager, you are required to plan a project by providing a report that consists of:
1. General description of the project (such as name of project, duration to complete, any
specific technology, type of project delivery method etc). (10 marks)
2. The definition of WBS. (4 marks)
3. A complete WBS and OBS. (16 marks)

[CLO2-PLO5:C5](Total Mark: 20 marks)

END OF QUESTION

Assignment Format and criteria:


1. Use double space and 12-point of Times New Roman font.
2. The assignment maximum pages can reach between 6 to 8 pages only.
3. Plagiarism is not acceptable and will be given zero (0) mark for each group.
4. Please include together this page in your report.
5. Penalty will be given to the late submission.
6. Stapler on the upper left side ONLY.
7. Provide reference using the American Psychological Association (APA) format
8. References should be latest (year 2008 onwards). At least SIX (6) references.
9. Due DATE = 18th January 2019