Annex no 3: Logframe Matrix

ANNEX 1 LOGFRAME MATRIX (Identification phase)

A B C D
PROJECT DESCRIPTION OBJECTIVELY SOURCES OF ASSUMPTIONS AND PRE
INTERVENTION LOGIC VERIFIABLE VERIFICATION CONDITIONS
INDICATORS (OVIs) (SOV)

Overall objectives (if both are applicable) (OO)


The sources of data /
 developmental overall objective (max. 1) Measures (direct or information necessary to
1  academic overall objective (max. 1) indirect) to verify to verify status of OO level
what extent the OO are indicators
fulfilled (benefits for
indirect beneficiaries)

Specific objectives (if both are applicable) (SO)


2 Measures (direct or The sources of data / Important events, conditions or decisions
 developmental specific objective (max. 1) indirect) to verify to information necessary to outside control of the project which must
 academic specific objective (max. 1) what extent the SO are verify status of SO level prevail
fulfilled (benefits for indicators
direct beneficiaries)

Intermediate results (ideally 3 to 7 results)


Measures (direct or The sources of data / Important events, conditions or decisions
3 Results that the projects needs to deliver indirect) to verify to information to verify outside control of the project which must
(sufficient and necessary) to ensure the what extent the results status of result level prevail
accomplishment of the specific objective are produced indicators

1. 1.1.
1.2. 1.1.
2. 2.1. 1.2.
2.2. 2.1.
3. 3.1. 2.2.
3.2. 3.1.
3.2.

Activities (3 to 5 activities per result) Means Costs

The activities (sufficient and necessary) that have Main resources (physical Means translated into Important events, conditions or decisions
to be undertaken by the project in order to produce and non-physical costs. outside control of the project which must
results. necessary to carry out prevail
activities). VLIR-UOS
1.1. budget lines could be
4 1.2. used.  investment costs
1.3.  operational costs
 investment items  personnel costs
2.1.  main operational  scholarship costs
2.2. expenses  coordination costs
2.3.  number, level and
person months of TOTAL:
3.1. personnel
3.2.  number and level
3.3. of scholarships

Pre conditions
5
Conditions that need to be fulfilled before
the project can start.

For the purpose of the Letters of intent:

 the green coloured cells (A1 – A2 – A3) need to be completed and described in sufficient detail
 the yellow coloured cells (A4 – B4- C4 – D2 – D3 – D5) need to be completed in an indicative manner
 the white cells do not need to be completed at this stage