Vous êtes sur la page 1sur 5

MENARA MASJID MT 20M

(GREENFIELD SITE)
SITE NAME : BAGAGAP
SITE ID : -
OWNER :
OWNER
REMARK
1. REINFORCED CONCRETE K-225 f c' = 18.6 MPa
2. STEEL BAR dia <10mm PLAN U-24 fy = 240 MPa
dia <13mm PLAN U-39 fy = 390 MPa
3. CONCRETE SLUMP = 10 +/-2
4. WELDING USE ELECTRODE E 70XX
5. STRUCTURAL STEEL AND PLATE ACCORDANCE
WITH ASTM A-36
6. BOLT AND NUT ACCORDANCE WITH ASTM A325
ACKNOWLEDGED BY
PT. ---------------------------------------
CONSULTANT DESIGN BY
PT. BHAMASA
PROJECT MANAGER
REV DESCRIPTION DRAW CHECK
SITE ID SITE NAME
- BAGAGAP
PROJECT NAME
-
DRAWING TITLE
3D VIEW
SCALE NTS DATE
DRAWING BY DEM
CHECKED BY SUDAR
APPROVED BY ALFIAN
CONTRACT BY:
DRAWING NO:
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHEET NO TOTAL SHEET
01 01
OWNER
REMARK
1. REINFORCED CONCRETE K-225 f c' = 18.6 MPa
2. STEEL BAR dia <10mm PLAN U-24 fy = 240 MPa
dia <13mm PLAN U-39 fy = 390 MPa
3. CONCRETE SLUMP = 10 +/-2
4. WELDING USE ELECTRODE E 70XX
5. STRUCTURAL STEEL AND PLATE ACCORDANCE
WITH ASTM A-36
6. BOLT AND NUT ACCORDANCE WITH ASTM A325
ACKNOWLEDGED BY
PT. ---------------------------------------
CONSULTANT DESIGN BY
PT. BHAMASA
PROJECT MANAGER
REV DESCRIPTION DRAW CHECK
SITE ID SITE NAME
- BAGAGAP
PROJECT NAME
-
DRAWING TITLE
FOUNDATION MT 20M
SCALE NTS DATE
DRAWING BY DEM
CHECKED BY SUDAR
APPROVED BY ALFIAN
CONTRACT BY:
DRAWING NO:
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHEET NO TOTAL SHEET
02a 01
OWNER
REMARK
1. REINFORCED CONCRETE K-225 f c' = 18.6 MPa
2. STEEL BAR dia <10mm PLAN U-24 fy = 240 MPa
dia <13mm PLAN U-39 fy = 390 MPa
3. CONCRETE SLUMP = 10 +/-2
4. WELDING USE ELECTRODE E 70XX
5. STRUCTURAL STEEL AND PLATE ACCORDANCE
WITH ASTM A-36
6. BOLT AND NUT ACCORDANCE WITH ASTM A325
ACKNOWLEDGED BY
PT. ---------------------------------------
CONSULTANT DESIGN BY
PT. BHAMASA
PROJECT MANAGER
REV DESCRIPTION DRAW CHECK
SITE ID SITE NAME
- BAGAGAP
PROJECT NAME
-
DRAWING TITLE
FOUNDATION MT 20M
SCALE NTS DATE
DRAWING BY DEM
CHECKED BY SUDAR
APPROVED BY ALFIAN
CONTRACT BY:
DRAWING NO:
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHEET NO TOTAL SHEET
02b 01
OWNER
REMARK
1. REINFORCED CONCRETE K-225 f c' = 18.6 MPa
2. STEEL BAR dia <10mm PLAN U-24 fy = 240 MPa
dia <13mm PLAN U-39 fy = 390 MPa
BAR BENDING SCHEDULE FOUNDATION
3. CONCRETE SLUMP = 10 +/-2
4. WELDING USE ELECTRODE E 70XX
Berat
a b c Dia L potong QTY L tot Berat
Satuan 5. STRUCTURAL STEEL AND PLATE ACCORDANCE
WITH ASTM A-36
(m) (m) (m) ( mm ) (m) (m) ( kg / m ) ( kg ) 6. BOLT AND NUT ACCORDANCE WITH ASTM A325
PAD 6000 X 6000 ACKNOWLEDGED BY
a PT. ---------------------------------------
1. Top Bar 5.900 0.200 16 6.300 62 390.6 1.58 617.15
b b
2.Bottom Bar b a b 5.900 0.200 16 6.300 62 390.6 1.58 617.15
3.Spacer c b 0.150 0.135 0.150 16 0.735 36 26.46 1.58 41.81 CONSULTANT DESIGN BY
a
Total Weight of Steel Reinforcement (kg) for Pad 1,276.11
PT. BHAMASA
Total Concrete Volume (m³) 10.80
PEDESTAL 400 X 400
PROJECT MANAGER
4.Longitudinal b a 1.768 0.500 0.050 16 2.318 48 111.26 1.58 175.797 REV DESCRIPTION DRAW CHECK
c
5.Sengkang b
a c 0.300 0.300 0.070 10 1.34 32 42.88 0.62 26.58
SITE ID SITE NAME
b
6.Stirrup a 0.300 0.125 0.060 10 0.99 64 63.36 0.62 39.28 - BAGAGAP
c
PROJECT NAME
Total Weight of Steel Reinforcement (kg) for Pedestal 241.657 -
Total Concrete Volume (m³) 1.024 DRAWING TITLE
Resume: BAR BENDING SCHEDULE
Total Weight of Steel Reinforcement 1,517.767 Kg
Total Concrete Volume (m³) 11.824 m³
Rasio 128 SCALE NTS DATE
DRAWING BY DEM
CHECKED BY SUDAR
APPROVED BY ALFIAN
CONTRACT BY:
DRAWING NO:
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14
SHEET NO TOTAL SHEET
03 01

Vous aimerez peut-être aussi