BOILER AND
ASSOCIATED STEAM
LINES
Commissioning Group, NTPC Mouda
NTPC Mouda
• The steam blowing will carried in different stages.
Proposal
NTPC Mouda
and 4. Duration of each blow is to be around 20-30 mins and 2
hrs time gap before the next blow.
Stages of Steam Blowing
NTPC Mouda
be used for blowing.
• Stage 2a: SH, MS lines up to ESVs, temporary lines from ESVs
to EOTVs to CRH lines, CRH lines, Re-heater, HRH lines to IVs,
temporary lines from IVs to exhaust. CRH lines, SH and Re-
heater attemperators shall be welded. LP bypass line blanked.
Stages of Steam Blowing
NTPC Mouda
will be kept closed.
Stages of Steam Blowing
NTPC Mouda
• 4g: CRH to Turbine gland sealing header
• 4h: CRH to PRDS to Aux Steam Header
• 4i: MS to PRDS to Aux Steam Header
• 4j: SH and RH spray lines
• Note: Steam Blowing of sub stages 4h & 4i shall be done prior
to blowing of sub-stages 4a & 4b.
Methodology
NTPC Mouda
start of each blow to avoid water droplets carryover with
saturated steam.
• A standard practice: Number of blows per day are limited to 8
with an interval of 1½ hrs. for cooling in addition to overnight
cooling to avoid thermal stresses.
Methodology
NTPC Mouda
Completion Criteria
NTPC Mouda
• For Stages 4c to 4j steam blowing is declared to be complete
on the basis of visual observation. Minimum 3 no. of blows
shall be given for each sub-stage.
Disturbance Factor
NTPC Mouda
QMCR = Steam flow rate at MCR condition
- REDUCER
NTPC Mouda
- PIPE WITH FLANGE (PF)
SH OUTLET HEADER
OD 564 X 45
IP TURBINE
OD 720 X 45
OD 660 X 36
OD 506 X 16
(P91) TURBINE
STAGE - IIA
TP - 044
OD 323.9 X 35
OD 323.9 X 35
M.S LINE
MP - 018
(P91)
(P91)
OD 406 X 42
(P91)
OD 355.6 X 11.3 OD 610 X 10
OD 720 X 45
PRESSURE : 50 KSC
TEMP : 400OC
OD 406.4 X 45
(P91) I.V
ISOLATOR
ESV
002
LPBP LINE
DESH ET - 1
OD 720 X 45
T.P HPBP LINE
NRV
CRH
001
OD 610X10 HPBP LINE
STAGE - I EOTV
003
R - 015
PRESSURE : 50KSC MP - 042
OD 660 X 36
CRH LINE MP - 042 OD 323.9 X 9.53 R - 13 OD 355.6 X 11.3
HRH LINE
OD 660 X 36
OD 508 X 20 OD 508 X 20 OD 711.2 X 25
R - 14 OD 406.4 X 12.7
CRH LINE OD 864 X 23.83 OD 864 X 35 STAGE - IIB
004
M.S STOP
VALVE
ESV
BLANK FLANGE
HP
SH INLET HEADER
SH OUTLET HEADER
THRO FLANGE
TURBINE
M.S LINE
TARGET PLATE
UNTREATED PIPE
TEMP. PIPING
NRV
CRH
HOTV - CLOSED HPBP LINE
HPBP LINE
CONDITION
HOTV HOTV
HPBP VALVE
SPOOL PIECE
45O ELBOW
CRH LINE
EOTV - CLOSED
M.S STOP
VALVE - OPEN
ESV
BLANK FLANGE
HP
SH INLET HEADER
SH OUTLET HEADER
THRO FLANGE
TURBINE
M.S LINE
TARGET PLATE
UNTREATED PIPE
TEMP. PIPING
NRV
CRH
HOTV - OPNED HPBP LINE
HPBP LINE
CONDITION
HOTV HOTV
HPBP VALVE
SPOOL PIECE
45O ELBOW
CRH LINE
EOTV-OPEN
M.S STOP
DESH VALVE-OPEN
ESV
ISOLATOR
I.V
SH OUTLET HEADER
RH REAR OUTLET HEADER 1
RH REAR OUTLET HEADER 2
HP IP TURBINE
TURBINE
M.S LINE
I.V
ISOLATOR
LPBP LINE
ESV
EOTV- OPEN BLANK
NRV
CRH
DESH HPBP LINE FLANGE
HPBP LINE
THRO
FLANGE
HRH LINE
CRH HOTV
LINE
HPBP VALVE
SPOOL PIECE
LPBP
LPBP TO
45O ELBOW VLV
VLV CONDENSOR
CRH LINE
LPBP TO
HRH LINE LPBP VLV CONDENSOR
LINE
EOTV - OPEN
M.S STOP
DESH VALVE-OPEN
ESV
ISOLATOR
I.V
SH OUTLET HEADER
RH REAR OUTLET HEADER 1
RH REAR OUTLET HEADER 2
HP IP TURBINE
TURBINE
M.S LINE
I.V
BLANK
ISOLATOR
LPBP LINE
ESV FLANGE
EOTV - OPEN
THRO
NRV
CRH
DESH HPBP LINE
FLANGE
HPBP LINE
HRH LINE
CRH HOTV
LINE
HPBP VALVE
SPOOL PIECE TO
LPBP
LPBP
45O ELBOW CONDENSOR
VLV
VLV
CRH LINE
TO
HRH LINE LPBP
LPBP
VLV CONDENSOR
LINE
NEAR DEAERATOR
FROM IP / LP CROSS
FROM CROSS AROUND TO DEAERATOR FROM CRH
AROUND PIPES
CRH CRH
FROM IP / LP CROSS
AROUND PIPE
CRH CRH
FROM APRDS
HEADER
TDBFP-A TDBFP-B
CRH CRH
FROM IP / LP CROSS
AROUND PIPE
CRH CRH
FROM APRDS
HEADER
TDBFP-A TDBFP-B
Thank You !
List of Requirements
NTPC Mouda
CC PUMP 1B & 1C
HPH 5B-6B INLET VALVE
SGECW PUMP 1A & 1B
HPH 5B-6B INLET VALVE IBPV
TGECW PUMPS 1 A/1B/1C HPH 5B-6B OUTLET VALVE
AIR COMPRESSOR HPH 5B-6B OUTLET VALVE IBPV
MDBFP (SYSTEM) HPH 100% BYPASS VALVE
OTHER EQUIPMENTS HPH 50% BYPASS VALVE
FCS VALVE (30% MOTORIZED)
FCS VALVE (30% PNEUMATIC)
FCS VALVE (100% MOTORIZED)
EOTV (Temporary Drives)
List of Requirements
NTPC Mouda
SAPH 1B FLUE GAS OUTLET DAMPER ECO RECIRCULATION VALVE
(PNEUMATIC) ECO FEED LINE DRAIN
SAPH 1B AND PAPH 1B COMMON ECO INLET HDR DRAIN
FLUE GAS OUTLET DAMPER (BOF) SUPERHEATER VENTS
ESP PASS 1D INLET GATEs SH STARTUP VENT L/R
ESP PASS 1D OUTLET GATEs RH STARTUP VENT
ID FAN 1B INLET GATE REHEATER VENTS
ID FAN 1B IGV MAIN STEAM STOP VALVE -L (MS-1) & -R (MS-2)
ID FAN 1B OUTLET GATE MAIN STEAM STOP VALVE IBPV -L (MS-3 & MS-5)
& -R (MS-4 & MS-6)
MS LINE DRAIN -L (MS-401) & -R (MS-402)