OE.2.1.1 EXCAVACION DE ZANJAS PARA ZAPATAS Y CIMIENTOS TERRENO NORMAL M3 44.1 42.25 1,862.38 3.5 12.6 0.1CA+1P 7 cuadrillas para que
1 lo 931.19
hagan en dos
931.19
dias
OE.2.1.2 RELLENO Y APISONADO C/EQ LIVIANO Y MATERIAL PROPIO M3 15.2 23.98 363.30 30 0.5 0.1CA+3PE+1OP 1 363.30
OE.2.1.3 NIVELACION INTERIOR Y COMPACTADO DE TERRENO M2 226 4.88 1,102.93 100 2.3 0.1CA+1PE+1OP 1 367.64293 367.64293 367.642933
OE.2.1.4 ELIMINACION DE MATERIAL EXCEDENTE DIST. 15 KM M3 32.2 83.09 2,675.50 24 1.3 0.1CA+6PE 1 1,337.75 1,337.75
OE.2.2 OBRAS DE CONCRETO SIMPLE 17427.7087
OE.2.2.1 SOLADO E=4" CONCRETO 1:10 C/H - ESTRUCTURAS M3 13.5 32.56 438.91 70 0.2 2OP+1OF+6 p 2 438.91
OE.2.2.2 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA M3 14.2 187.62 2,660.45 25 0.6 2OP+2OF+ 8p 2 2,660.45
OE.2.2.3 SOBRECIMIENTO, MEZCLA C:H 1:8+25% P. MEDIANA M3 6.05 268.55 1,624.73 12 0.5 1 Op + 2 Of +8Pe 3 1,624.73
OE.2.2.4 ENCOFRADO Y DESENCOFRADO NORMAL - SOBRECIMIENTOS M2 79.9 84.16 6,722.70 40 2 1OP+1OF 3.5 3361.3504 3361.35
OE.2.2.5 FALSO PISO DE 4" DE CONCETO 1:10 C-H M2 220 27.186 5,980.92 100 2.2 2 OP+ 6 PE 3.5
OE.2.3 OBRAS DE CONCRETO ARMADO 132,552.85