Vous êtes sur la page 1sur 1

BALANCE OF TURBINE ISLAND PACKAGE KAPP- 3&4

Project No.: 075


Check List for Painting

PO No.: CMM/MEQ/23-40-2-1040/PO/6087
Name of Work: BOTI for KAPP 3&4 Project
Location: Date:

Sl.
DESCRIPTION STATUS REMARK
No
1 Whether the pre job briefing/safety induction/medical test is done to all
workers deployed? YES NO
2 Whether appropriate PPE like safety shoes, helmets, nose masks, are
provided to concerned workers? YES NO
3 Whether Painting zone is identified and unauthorized access is
prohibited? YES NO
4 Whether Air-Compressor is tested and certified from competent person?
YES NO
5 Whether authorized technicians, operators and foremen are deployed?
YES NO
6 Are connections to electrical equipments given through standard industrial
type DB, Sub-DB, Extension boards, plug tops and cables? YES NO
7 Whether accesses to electrical panels/DB/Sub-DB are clear of
obstructions? YES NO
8 Whether the airlines and connections/fittings of the paintings system are
checked for their healthiness prior to use? YES NO
9 Whether Painting area is Cleaned and Pollution free to Environment?
YES NO
10 Whether the MSDS of paint are available and understood by the engaged
personnel? YES NO
11 Whether fire extinguisher and fire buckets are deployed at easily
accessible location(s)? YES NO
12 Whether adequate ventilation is available at painting shop?
YES NO
13 Whether enough illumination is available for executing the activity?
YES NO

Checked by (Site Engineer) Reviewed By (Safety Department)


Name:

Signature:

Prepared by Concurred by Approved by Approval date

75-DOD -KAPP3&4-BOTI-JHA-HSE-020, Rev.R1 Page 1 of 1