Upon Expenditure Request Approved (ERA), the Contracting
the bid slate to a clarification meeting in which the scope of the project will be
explained. A site visit may be conducted. The contractors get a copy of the bid
package to bid on. Each contractor will submit a technical and a commercial
bid.
The technical bid will contain the technical and management aspects of
the work, and may include the following, depending on the contract:
• Manpower plan
• Equipment schedule.
• Equipment Rental.
• Subcontract Plan.
18
The commercial bid will be based on:
The technical bid will be opened first by the Technical Review Team,
rated against a scale with an agreed pass score. The overall passing score is
70% of the total points. Any bidder which does not achieve this passing score
After the technical evaluation, the commercial bid will be opened by the
those bidders whose Technical proposals have been approved. List the
19
The lowest of the Total cost will be ranked with number 1 and will be
the kind of contract, the detailed engineering will be done by the construction
the facility. Issued for Construction package is developed for the procurement
attend a kick off meeting. In the meeting the contractor meets the
especially at 60% and 90% design completion stages. During this time,
several Saudi Aramco organizations are involved in the reviews like Project
Department.
to make sure that designed facility meets Saudi Aramco standards and
20
As the job progresses, monthly reports are prepared by the contractor to
Aramco drawing management system, which is drawing database for all the
company drawings.