Design of slab:

Critical panel:

Length of long span (Ly) =(7+0.219)= 7.22 m

Length of short span (Lx) =(6.45+0.219)= 6.67 m

(Ly/Lx) =(7.219/6.669)= 1.082

Grade of concrete (fck) 25 N/mm2

Grade of steel (fy) 500 N/mm2

Assume overall thickness of the slab (D x) or (Dy) 250 mm

Unit weight of reinforced concrete (γc) (As per IS:875, Part-I) 25 Kn/m3

Loads acting:

a) Self weight of the slab =(250/1000x25)= 6.25 Kn/m2

b) Floor Finishes load acting (As per IS:875, Part-II) 0.0 Kn/m2

c) Live load acting (As per Manufactures equipment loads) 10 Kn/m2

Total acting load (w) =(6.25+0+10)= 23 Kn/m2

Assume the diameter of the bar provided (Ø) 12 mm

Clear cover (d') 25 mm

Effective depth for top steel along short span (dx) =(250-25-12/2)= 219 mm

Effective depth for bottom steel along long span (dy)

=(250-25-12/2-12)= 207 mm

The maximum BM per unit width (As per IS:456-2000, Page No:90)
Mx=(αx x w x Lx2)

My=(αy x w x Lx2)

Along short span:

Max BM in the support =(0.042x22.5x6.669�)= 42.03 Kn-m/m

Max BM in the mid span =(0.031x22.5x6.669�)= 31.02 Kn-m/m

Page 1 of 6
Area of top steel required at support location:

Consider breadth of the slab (b) 1 m

Mu/(bxd2) =((42.029x1.5x1000000)/(1000x219�))= 1.314

Percentage of steel required (As per SP-16) 0.32 %

Area of steel required (Astreq) 706 mm2/m

Provide 12 mm dia tor steel at a spacing 150 mm c/c

Area of steel provided (Astpro) 754 mm2/m

Percentage of steel provided (Ppro) 0.34 %

Minimum percentage of steel required (Pmin) 0.12 %

Area of bottom steel required at mid span location:

Mu/(bxd2) =((31.022x1.5x1000000)/(1000x219�))= 0.97

Percentage of steel required (As per SP-16) 0.23 %

Area of steel required (Astreq) 511 mm2/m

Provide 12 mm dia tor steel at a spacing 150 mm c/c

Area of steel provided (Astpro) 754 mm2/m

Percentage of steel provided (Ppro) 0.34 %

Minimum percentage of steel required (Pmin) 0.12 %

Along long span:

Max BM in the support =(0.044x22.5x6.669�)= 44.031 Kn-m/m

Max BM in the mid span =(0.033x22.5x6.669�)= 33.02 Kn-m/m

Area of top steel required at support location:

Mu/(bxd2) =((44.031x1.5x1000000)/(1000x219�))= 1.38

Percentage of steel required (As per SP-16) 0.32 %

Area of steel required (Astreq) 703 mm2/m

Provide 12 mm dia tor steel at a spacing 150 mm c/c

Area of steel provided (Astpro) 754 mm2/m

Percentage of steel provided (Ppro) 0.34 %

Minimum percentage of steel required (Pmin) 0.12 %

Page 2 of 6
Area of bottom steel required at mid span location:

Mu/(bxd2) =((33.023x1.5x1000000)/(1000x219�))= 1.03

Percentage of steel required (As per SP-16) 0.24 %

Area of steel required (Astreq) 515 mm2/m

Provide 12 mm dia tor steel at a spacing 150 mm c/c

Area of steel provided (Astpro) 754 mm2/m

Percentage of steel provided (Ppro) 0.34 %

Minimum percentage of steel required (Pmin) 0.12 %

Punching shear check

Load
Punching 30000 N
(Assumed)
area (d/2
distance 542244 mm2
from the
Punching
face) 0.06 N/mm2 Ok
shear stress

Check for Shear:

Factored load (wu) 22.500 Kn/m2

Vu=(Wux(0.5xlx - dx or dy)) =(22.5x(0.5x6.669-0.219))= 70.10 Kn/m

ζv =(Vu/bxdx or dy) =(70099/(1000x219))= 0.320 N/mm2

% of steel provided at mid span 0.34 %

(ζc) from IS:456-2000 (Table-19) 0.42 N/mm2

(K) Multification factor 1.1

(Kxζc) =(1.1x0.416)= 0.458 N/mm2

if Kζc > ζv Shear is Safe

Page 3 of 6
ENERGY INFRATECH PRIVATE LIMITED.
Hydro Design Division - Gurgaon
Plot No - 145&146, Udyog Vihar, Phase-IV, Gurgaon-122015,Haryana.
PROJECT: DOCUMENT NO: DATE
Teesta Stage-III HEP (6 x 200 MW)

DESIGNED By CHECKED By PAGE


STRUCTURE: Design calculations of two way slab of GIS Floor SREENU.M Dr.K.K.M

Design of slab:

Critical panel:
Length of long span (Ly) =(3.775+0.312)= 4.09 m
Length of short span (Lx) =(3.212+0.312)= 3.52 m
(Ly/Lx) =(4.087/3.524)= 1.16
Grade of concrete (fck) 25 N/mm2
Grade of steel (fy) 500 N/mm2

The slab is designed as two way spanning with two adjacent edges discontinuous
Assume overall thickness of the slab (Dx) or (Dy) 350 mm
Unit weight of reinforced concrete (γc) (As per IS:875, Part-I) 25 Kn/m3

Loads acting:

a) Self weight of the slab =(350/1000x25)= 8.75 Kn/m2

b) Floor Finishes load acting (As per IS:875, Part-II) 1.2 Kn/m2

c) Live load acting (As per Manufactures equipment loads) 83 Kn/m2

Total acting load (w) =(8.75+1.2+83)= 93 Kn/m2

Assume the diameter of the bar provided (Ø) 16 mm

Clear cover (d') 30 mm


Effective depth for top steel along short span (d x) =(350-30-16/2)= 312 mm
Effective depth for bottom steel along long span (d y)

=(350-30-16/2-16)= 296 mm

The maximum BM per unit width (As per IS:456-2000, Page No:90)
Mx=(αx x w x Lx2)

My=(αy x w x Lx2)

Along short span:

Max BM in the support =(0.057x92.95x3.524�)= 65.80 Kn-m/m

Max BM in the mid span =(0.043x92.95x3.524�)= 49.64 Kn-m/m

Area of top steel required at support location:

Consider breadth of the slab (b) 1m

Page 4 of 6
ENERGY INFRATECH PRIVATE LIMITED.
Hydro Design Division - Gurgaon
Plot No - 145&146, Udyog Vihar, Phase-IV, Gurgaon-122015,Haryana.
PROJECT: DOCUMENT NO: DATE
Teesta Stage-III HEP (6 x 200 MW)

DESIGNED By CHECKED By PAGE


STRUCTURE: Design calculations of two way slab of GIS Floor SREENU.M Dr.K.K.M

Mu/(bxd2) =((65.795x1.5x1000000)/(1000x312�))= 1.014

Percentage of steel required (As per SP-16) 0.24 %


Area of steel required (Astreq) 763 mm2/m

Provide 16 mm dia tor steel at a spacing 150 mm c/c


Area of steel provided (Astpro) 1340 mm2/m
Percentage of steel provided (Ppro) 0.43 %
Minimum percentage of steel required (Pmin) 0.12 %

Area of bottom steel required at mid span location:


Mu/(bxd2) =((49.635x1.5x1000000)/(1000x312�))= 0.76

Percentage of steel required (As per SP-16) 0.18 %


Area of steel required (Astreq) 564 mm2/m

Provide 16 mm dia tor steel at a spacing 150 mm c/c


Area of steel provided (Astpro) 1340 mm2/m
Percentage of steel provided (Ppro) 0.43 %
Minimum percentage of steel required (Pmin) 0.12 %

Along long span:

Max BM in the support =(0.047x92.95x3.524�)= 54.252 Kn-m/m

Max BM in the mid span =(0.035x92.95x3.524�)= 40.40 Kn-m/m

Area of top steel required at support location:


Mu/(bxd2) =((54.252x1.5x1000000)/(1000x312�))= 0.84

Percentage of steel required (As per SP-16) 0.19 %


Area of steel required (Astreq) 594 mm2/m

Provide 16 mm dia tor steel at a spacing 150 mm c/c


Area of steel provided (Astpro) 1340 mm2/m
Percentage of steel provided (Ppro) 0.43 %
Minimum percentage of steel required (Pmin) 0.12 %

Area of bottom steel required at mid span location:

Page 5 of 6
ENERGY INFRATECH PRIVATE LIMITED.
Hydro Design Division - Gurgaon
Plot No - 145&146, Udyog Vihar, Phase-IV, Gurgaon-122015,Haryana.
PROJECT: DOCUMENT NO: DATE
Teesta Stage-III HEP (6 x 200 MW)

DESIGNED By CHECKED By PAGE


STRUCTURE: Design calculations of two way slab of GIS Floor SREENU.M Dr.K.K.M

Mu/(bxd2) =((40.401x1.5x1000000)/(1000x312�))= 0.62

Percentage of steel required (As per SP-16) 0.14 %


Area of steel required (Astreq) 434 mm2/m

Provide 16 mm dia tor steel at a spacing 150 mm c/c


Area of steel provided (Astpro) 1340 mm2/m
Percentage of steel provided (Ppro) 0.43 %
Minimum percentage of steel required (Pmin) 0.12 %

Check for deflection:

For a continuous slab,the effective depth of slab is required


d=(L/26xMf) 68 mm
Mf=Modification factor from IS:456-2000 (Page No - 38) 2.0
(fs) =(0.58x500x(564/1340))= 122.06

% of steel provided at mid span 0.43 %

Deflection Safe

Check for Shear:


Factored load (wu) =(1.5x92.95)= 139.425 Kn/m2
Vu=(Wux(0.5xlx - dx or dy)) =(139.425x(0.5x3.524-0.312))= 202.17 Kn/m
ζv =(Vu/bxdx or dy) =(202166/(1000x312))= 0.648 N/mm2

% of steel provided at mid span 1.05 %


(ζc) from IS:456-2000 (Table-19) 0.65 N/mm2

(K) Multification factor 1.0

(Kxζc) =(1x0.653)= 0.653 N/mm2

if Kζc > ζv Shear is Safe

Page 6 of 6