Vous êtes sur la page 1sur 17

Summary of rate of items

Date:12/19/2018
Sn Name of materials Brand name Unit Rate Remarks
1 Cement (Including delivary charge)
2 Sand Per Cuft. Double wash
3 Aggrigate Per Cuft. Chapagaun
4 Bricks Chimney made Per nos.
5 Steels (Including delivary charge) Ambe Per kg.
6 Stone Per Cuft.
7 Boulders Per Cuft.
8 Stone Dust Per Cuft.
9 Skilled labour Per day
10 Unskilled labour Per day
90.56604
Item No. 1,2,3,4 & 5
Unit: P/M3
Description of works : Earthwork excavation in Soft/hard soil foundation
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Unskilled Man Day 0.75 -
Sub Total -

B. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -
Total A+B -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/Cum. -
Rate per Cuft. -
Item No.:6
Unit: 1cum
Description of works:Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 23 cm to 20 cm thick
including hand packing and compacting etc. complete
Quantity Rate/Unit Amount
Category/Type Unit Remarks
(NRs.) (NRs.)

A. Labour
Unskilled Man Day 1.50 -
Sub Total -

B. Material
Rubble Stone M3 1.20 -
Sand M3 0.55 -
Sub Total -

C. Equipment
Staging 3% of A --- --- -
Sub Total -

Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/cum. -
Rate per Cuft. -
Item No.:7
Unit: 1cum
Description of works:Removing and Transporting of excavated / demolished material within limit
including loading, unloading, stacking the material as directed by Engineer-in-charge etc. complete.
Quantity Rate/Unit Amount
Category/Type Unit Remarks
(NRs.) (NRs.)

A. Labour
Unskilled Man Day 0.20 -
Sub Total -

C. Equipment
Transportation charge per days 1.00 -
Sub Total -

Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/cum. -
Rate per Cuft. -

Item No.: 8,9,10,11,12 &13


Unit: P/M3
Description of works : P.C.C. for R.C.C. for all Items in road works only.
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 1.00 -
Unskilled Man Day 4.00 -
Sub Total -

B. Material
Cement M.T. 0.40
Aggregate
20 mm down M3 0.57 - .0
10 mm down M3 0.29 - .0
Sand M3 0.425 - .0
Sub Total - .0

C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -

Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/Cum. -
Rate per Cuft. -
Item No.: 14
Unit: P/MT.
Description of works: Providing and fixing in position Fe-500 steel reinforcement
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 12.00 -
Unskilled Man Day 12.00 -
Sub Total -

B. Material

Reinforcement 8mm to
25mm size Mt. 1.02 -
Binding wire Kg 10.00 -
Sub Total -
C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -
C. Equipment
--- ---
Sub Total -
Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/MT. -
-
Rate per Kg. -
Item No.: 15
Unit: P/M3
Description of works:Providing uncoursed rubble trap /quartzite /gneiss stone masonary in cement
mortar 1:5 for returns, head-walls, parapet etc. including bailing out of water, striking joints of the non
exposed faces, pointing the exposed faces with cement mortar 1:3, scaffolding, watering to
masonary and etc. complete.mortar .
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 1.50 -
Unskilled Man Day 5.00 -
Sub Total 1,600.00

B. Material
cement(PPC) M.T. 0.11 -
Stone Cum. 1.25 -
Sand M3 0.47 - .0
Sub Total -

C. Equipment
Tools & Plant 3% of A --- --- 48.00
Sub Total 48.00

Total A+B+C 1,648.00


Overhead Expenses and Profit 10% 164.80
Bill Item Rate in P/Cum. 1,812.80
Rate per Cuft. -
Item No.: 16
Unit: P/10 M2
Description of works : Providing expansion joints with 25mm thick bituminous pad as per detailed
drawings etc. complete.
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 1.00 -
Unskilled Man Day 6.00 -
Sub Total -

B. Material
Bituminous kg -
Sand M3 0.15 - .0
Sub Total -

C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -

Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/10 Sqm. -
Rate per Sqft./Rft. -
Item No.: 17
Unit: P/M3

Description of works : Providing and laying in situ / ready mix M20 RCC of trap/ granite/ quartzite/ gneiss
metal for RCC work of ballast walls, kerbs and box returns including scaffolding, compaction, formwork
finishing and curing etc. complete. (excluding reinforcement, with concrete batch mix plant / pan mixer etc
completeworks only.

Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 1.00 -
Unskilled Man Day 4.00 -
Sub Total -

B. Material
Cement M.T. 0.40
Aggregate
20 mm down M3 0.57 - .0
10 mm down M3 0.29 - .0
Sand M3 0.425 - .0
Form works Sqm. 4.000 - .0
Sub Total - .0

C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -

Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/Cum. -
Rate per Cuft. -
Item No.: 18
Unit: P/M

Description of works : Providing weep holes in brick masonry /plain /reinforced concrete abutment, wing
wall / return wall with 100mm diameter AC pipe extending through the full width of the structure with slope
of 1V: 20H towards drawing face as per drawings and technical specifications etc. complete..

Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)
A. Labour
Skilled Man Day 0.12 -
Unskilled Man Day 0.25 -
Sub Total -

B. Material
HDP/AC pipe Mtr. 1.10 -
Sub Total -

C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -

Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/M. -
Rate per Rft. -
Item No. 19
Unit: 1/M3

Description of works : Providing and laying of filter media with granular materials/ stone crushed
aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and
provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to
a firm condition as per drawing and technical specifications etc. complete.

Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
UnSkilled Man Day 1.75 -
Sub Total -
B. Material
Filter materials (Boulders) M3 1.10 -
-
C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -
Total A+B -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/Cum. - .0
Rate per Cuft. -

Item No. 25
Unit: P/M3

Description of works :Providing earth work in embankment with approved materials obtained from
departmental/Private land or other sources including all leads and lifts, laying in layers of 20cm. to 30cm.
thickness breaking clods, dressing to the required lines, curves, grades and section, watering and
compaction with Vibratory roller to achieve not less than 97 % of standard proctor density etc. complete.
Note:- If material for the earthwork to be brought from borrow areas from private land owner,the rate of
compensation to be given to land owner shall be decided by the concerned Superintending
Engineer,depending on local site conditions.

Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)
A. Labour
Unskilled Man Day 0.55 -
Sub Total -

B. Equipment
Vibratory Roller Hr. 0.040 -
Sub Total -
Total A+B -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/Cum. -
Rate per Cuft. -
Item No.:26
Unit: P/M3
Description of works : Providing and supplying,spreading in uniforms layers of Granular Sub Base.
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 0.10 -
Unskilled Man Day 1.50 -
Sub Total -

B. Material
Diesel ltr. 0.88
Sub Base agg. M3 2931.145 - .0
Sub Total - .0
C. Equipment
Road Roller hr. 0.040
Tools & Plant 3% of A --- --- -
Sub Total -

Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/Cum. -
Rate per Cuft. -
Item No. 32
Unit: P/M

Description of works :Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm. .in concrete
slab using concrete cutting machine with diamond studded saw within 48 hours of casting of bay / slab
etc. complete including subsequent widening of the groove 8 to 10 mm. wide at top having depth of 15
mm. as directed by Engineer incharge

Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Unskilled Man Day 0.05 -
Sub Total -

B. Equipment
Cuttting machine Hr. 0.083 -
Sub Total -
Total A+B -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/m. -
Rate per Cuft. -

Item No.: 33
Unit: P/M

Description of works : Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS
: 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per
detailed drawing including fixing Polyethylene foam backer rod of required diameter (appraox. 25% larger
than the initial 3 mm.to 4 mm. joint) overlaid with bond breaking tape as per detailed drawing. Item
includes cleaning the joints with water jet / air compressor and allowing joint to become thoroughly dry
before sealent is applied and applying primer. (A) Contraction and longitudinal joints (15 mm. deep x 8
mm.wide)

Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 0.08 -
Unskilled Man Day 0.35 -
Sub Total -

B. Material
Polysulphide sealent kg 0.25 -
Sub Total -

C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -

Total A+B+C -
Overhead Expenses and Profit 10% -
Bill Item Rate in P/M. -
Rate per Sqft./Rft. -

Item No. 34
Unit: 10 M2
Description of works: Providing and laying 150 micron Low Density Polyethylene (LDPE) sheet confirming
to IS 3395 : 1997 below concrete pavement including all materials and labour complete.
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Unskilled Man Day 0.80 -
Sub Total -
B. Material
Polythene sheet 500 micron M² 11.000 -
Sub Total -
C. Equipment
Tools & Plant 3% of A --- ---
Sub Total -
Total A+B+C -
Overhead Expenses and Profit 10% -
Grand Total for 10 Sqm -
Bill Item Rate in SQM -
Rate per Sqft. -

Item No. 35
Unit: 10 M2

Description of works: Providing and fixing factory made Hydraulically pressed Mechanically vibrated and
compacted precast inter locking cement concrete paving blocks 100MM thick in M-40 grade of approved
size and shape for City streets and roads with high volume/ heavy traffice as specified and as per IS
15658:2006 including cost of all materials, manufacturing, curing, transportation of blocks to work site
including loading, unloading and stacking as directed, laying paving blocks in position over prepared bed
of natural sand / crushed sand of 50 mm thickness including necessary excavation in all stratas, spreading
blindge of fine sand over the prepared bed, compacting blocks by plate vibrator etc. complete

Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 2 -
Unskilled Man Day 3.00 -
Sub Total -
B. Material
100 mm precast Interlock
M² 11.000 -
block
Sone Dust Cum. 0.710 -
Sub Total -
C. Equipment
Plate vibrator Hr. 1.00 -
Tools & Plant 3% of A --- --- -
Sub Total -
Total A+B+C -
Overhead Expenses and Profit 10% -
Grand Total for 10 Sqm -
Bill Item Rate in SQM -
Rate per Sqft. -

Item No. 36
Unit: P/10M
Description of works: Providing and laying cement concrete pipe of IS 458:2003 NP-3 class of 300mm
diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and
curing etc. complete.
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 1.00 -
Unskilled Man Day 3.50 -
Sub Total -
B. Material
Cement Mt.
Sand Cum. 0.10 -

300 mm NP3 hume pipe Mtr. 10.10 -


300mm collars nos 3.0 -
Sub Total -
C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -
Total A+B+C -
Overhead Expenses and Profit 10% -
Grand Total for 10 m -
Bill Item Rate in M -
Rate per Sqft. -

Item No. 36
Unit: P/10M
Description of works: Lowering, laying and jointing H.D.P.E. Double Wall Corrugated pipes for non
pressure underground drainage and sewerage applications and specials of following class and diameter
including the cost of conveyance from stores to the site of works including cost of all labour, material
except O ring coupler giving satisfactory hydraulic testing as per relevant ISO etc. complete.
Rate/Unit Amount
Category/Type Unit Quantity Remarks
(NRs.) (NRs.)

A. Labour
Skilled Man Day 1.25 -
Unskilled Man Day 2.50 -
Sub Total -
B. Material

300 mm NP3 hume pipe Mtr. 11.0 -

Coupler nos 3.0 -


Sub Total -
C. Equipment
Tools & Plant 3% of A --- --- -
Sub Total -
Total A+B+C -
Overhead Expenses and Profit 10% -
Grand Total for 10 m -
Bill Item Rate in M -
Rate per Sqft. -
G.P. BUILDERS PVT. LTD. 12/17
Teku., Kathmandu Nepal
VAT/PAN No:- 601872327
Summary Of Rate Analysis
Project: United Cement (P) Ltd.
Location:Dhading

Sn Description of works Unit Rate.


1 Earthwork excavation in Soft soil foundation Cuft.
2 Earthwork backfilling with 15cm layer compact by excavated soil. Cuft.
3 Sand Filling Work Cuft.
4 Providing and laying 500 micron plastic sheet Sqft.
5 Providing and Laying chimney made dry flat brick solling Sqft.
6 Concrete works
7 P.C.C. (1:3:6) M10 Cuft.
8 P.C.C. (1:2:4) M15 Cuft.
9 P.C.C. (1:1.5:3) M20 Cuft.
10 Barbending works Kg
11 Providing, fabrication, erecting, centering and shuttering of plywood formwork at Slab Sqft.
12 Providing and stone wall in 1:6 cement mortar . Cuft.
13 Providing and Laying chimney made brick work in 1:6 cement mortar in superstructure Cuft.
14 Providing and Laying chimney made first class half brick work in 1:4 cement mortar in Superstructure Sqft.
15 12mm th. Cement plastering work in 1:5cement mortar Sqft.
16 12.5mm th. Cement plastering work in 1:4 cement mortar (ceiling) Sqft.
17 20mm th. Cement plastering work in 1:5 cement mortar Sqft.
18
Providing, fabrication, erecting, centering and shuttering of plywood formwork at lintel and Brick wall tia. Rft.
19 Providing,applying of 6" wide chicken mesh on brick masonary and concrete joints. Rft.
20 Providing and laying of hand mixed 40mm plain cement concrete (1:2:4) in IPS flooring . Sqft.
21 3 mm th. cement punning works over 1:1 c/s mortar on screeding floor and plaster wall. Sqft.
22 Providing and Scafolding work by ms pipe. Sqft.
23 Providing and filling of filter material in 150mm to 300mm thickness. Cuft.
24 Providing and laying of 150 mm to 230 mm thick boulder solling on foundation . Cuft.
25 Providing and applying of plaster pointing on stone masonary by 1:4 (C:S) . Sqft.
26 Providing, fabrication, erecting, centering and shuttering of plywood formwork for boundary coaping,pcc or
other below 9" down measurement. Rft.
27 Providing and applying of cement polymer waterproofing works on concrete surface. Sqft.
28 Providing,applying of polymer enjection grouting on brick masonary cracks. Rft.
Sn Description of works Unit Rate. 13/17
29 Providing,applying of polymer enjection grouting on brick masonary cracks. Nos
30 Dismantale of brick/Stone masonary. Cuft.
31 Providing and applying of protection plaster on waterproofing surface by 1:3 (C:S) . Sqft.
32 Removal of debris and Chiping /hacking on concrete surface . Sqft.
33
Providing and plastering of water bit,plain cement cornice and others 12 " below plaster copla by 1:5 (C:S ). Rft.
34 levelling,compacting and soil dressing on ground surface. Sqft.
Manpower Supply
35 Skilled MD
36 Unskilled MD
37
Providing, Supplying and laying of brick bat coba filling in (1:2:4) on sunkun area , terrace as per drawing Cuft.
38 Fixing of wooden door/window fitting and all complete Nos
39 Providing,and Laying 20mm thick in 1:4 (C:S) indian Marble on wall & floor. Sqft.
40 Providing,and Laying 20mm thick in 1:4 (C:S) granite on wall & floor. Sqft.
41 Providing,and Laying 20mm thick in 1:4 (C:S) Ceramic marble on wall & floor. Sqft.
42 Marble Moulding Including sand and Cunsumables with Polishing. Rft.
43 Granite (Moulding/Skirting) including sand cunsumables with polishing Rft.
44 Kitchen Sink Pc.
45 Providing,and Laying 20mm thick in 1:4 (C:S) granite on wall & floor. Rft.
46 Providing,and Laying 20mm thick in 1:4 (C:S) Ceramic marble on wall & floor. Rft.
47 Tiles fitting Rft.
48 Counter basin fitting Nos
49 Plaster groove Rft.
50 Ips Rate as per Cuft. Cuft.
51 Providing and laying of Upvc Roofing works Sqft.
52 Providing and laying of Rooof Ridge Rft.
53 Truss Works
54 Truss/grill fabrication and installation Kg
55 up to 1.5"X1.5" ms pipe Rft
56 Gutter Rft.
57 Ms gate,door & window Sqft
58 MS boalt supply up to 16mm dia and 750mm length Nos
59 Ms post fixing Nos
60 Fencing of 2.5"X2.5" heavy 10 gause G.I mesh Sqft.
61 Road works
Sn Description of works Unit Rate. 14/17
DERS PVT. LTD. 15/17
hmandu Nepal
No:- 601872327
Of Rate Analysis

Remarks
Remarks 16/17

-
Remarks 17/17

Vous aimerez peut-être aussi