China Harbour Engineering Co.L.L.C.

CHECK LIST FOR INSTALLATION OF WOODEN DOORS

SUBCONTRACTOR : CONTRACTOR: CHEC


SECTION OF WORK : ARCH LACATION :

LEVEL : Page 1 of 1

CHECKED BY DATE
STAGE ITEM
HGC CHEC DORSCH
Preliminary Doors frames and panels including materials and
Checks types are approved
Check type and size of door frames and panels for
particular locations as per door schedules
Method Statement, QCP, ITP & Risk Assessment
approved.
Check that building envelope is complete, weather
tight until all wet trade is complete
SETTING OUT Check setting out and fixing of door frames ( i.e.
OF DOOR plumb, square, and true level) are correct
FRAMES Check clear height w.r.t datum
INSTALLATION Fastener shall be not be more than 600 mm o/c and
OF DOOR 150 mm from the edge of the door
FRAME Check for strut support from rebate to rebate of
frame prior to the application of the foam
Check for protection of frames
INSTALLATION Check installation of door panels/ shutters (i.e.
OF DOOR alignment with frame, correct fit and smooth
operation)
PANELS/ Check for gap between door shutter and frame is
SHUTTERS maintained.
Check for rubber silencer
INSTALLATION
OF DOOR Check type of door hardware and accessories that
are installed as per manufacturer instructions and
HARDWARE approved door schedule and hardware schedule
(IRON
MONGERY)
CLEANING & Check cleaning and protection of installed doors
PROTECTION completed

FOR S/C QA/QC : FOR CONTRACTOR QA/QC : FOR DORSCH REP :

Name: Name: Name:


Sign: Sign: Sign:
Date : Date : Date :