Vous êtes sur la page 1sur 6

Ringo D.

Aquino
D.O.B.: 18 Oct. 1972, 44y.o.

Brgy. Banaba, Padre Garcia, Batangas 4224, Philippines

Tel.: +63435157133 Mob.: +639173822804

ringo.aquino@ymail.com

PROJECT ENGINEER
PERSONAL DETAILS KEY ATTRIBUTES
Qualifications Bachelor of Science in Civil  Highest consideration for
Engineering quality, occupational health &
safety and environmental
Being in the construction industry for 22 years has refined my skills in wise and
proper project implementation. I always do take direct responsibility and regulations
involvement on all activities at the project site: work planning, scheduling and  Excellent organisational,
execution; maximising usage of resources; implement work with the highest programming, procurement
consideration to quality, safety and environment; direct participation and supervision and budget control skills.
of all site activities to be able to closely monitor project performance to ensure bigger
productions will be attained.  Ability to work under pressure
and meet tight deadlines.
Responsibilities:  Good people skills, with the
•Responsible for ensuring the Effective Engineering; Planning, Quality, Survey, Cost ability to develop, and
Control and Scheduling functions for the project and ensuring that all project motivate others.
requirements are being adhered to.  Extensive practical and
•Coordinate with Managers and Superintendents on Engineering, temporary works, theoretical appreciation of
scheduling and status of the project. most construction and civil
•Provide overall progress reports and other reports related to schedule and cost as elements.
required by the Project Manager.
 Proven experience of working
•Provide general technical assistance to supervisory personnel.
in a team environment to
•Interpret engineering documents and drawings for field personnel. achieve a common goal.
•Control fabrication and field construction engineering and schedules for overall
 Excellent communication
programs.
skills both written and verbal.
•Participate in bid evaluation of subcontract tenders.
•Prepare reports on progress, manpower and costs and coordinate the work  Experienced in cost control,
scheduling and procurement. closely monitoring revenue
•Monitor and coordinate the preparation maintenance and change of construction against expenses, setting
schedules, methods, manning charts and equipment requirements. Advise on actions budget and forecasting cost to
to be taken to prevent or improve undesirable trends in progress. complete.
•Ensure the currency and accuracy of information for schedules and reports; provide
timely submission of reports and project schedules.
•Develop and oversee inspection practices of Site Engineers to ensure effective and
satisfactory progress and completion of all work areas for the project.
•Ensure temporary works designs and fabrications are verified prior to use of the
specific item.
•Carry out progressive engineering audits of temporary works in accordance with the
audit schedule
Ringo Aquino CV

RELEVANT EXPERIENCE

Project Role Experience


QCLNG Export Project Engineer Responsible for all earthmoving activities,
Pipeline-Narrows causeway and rail construction to be utilised for
Crossing launching a twin 42” dia. Concrete Weight Coated
Pipes across the 4.0kms Narrows channel to Curtis
Island.
Sydney Desalination Project Engineer Tunnelling – Concrete pipe jacking using 2.50M
Project dia. HK EPB Machine and installation of 1.80M
dia. steel pipes in tunnels. 19 shafts and 16 tunnels.
Dubai Metro Project Sr. Civil Engineer Construction of a driverless, fully automated metro
rail network in Dubai, UAE.
Philippine – Japan Project Engineer Construction of 36kms PCCP with asphalt concrete
Friendship Highway paved shoulder including all related structures -
(Mindanao Section) – drainages, slope protections and retaining walls.
Bayugan-Awa-San Construction of 126.0mts Bridge: craneway, 1.20
Francisco Road and 1.80m dia. bored piles, 31.0m precast
prestressed girder, Type – V.
Rehabilitation of 8 existing bridges – demolition
and replacement of superstructures.

PROFESSIONAL EXPERIENCE 1. GRAND RESIDENCES 35 Ongoing Projects:


April 2017 – Present STOREY CONDOMINIUM,
Cebu City
PHILIPPINE RIGID
CONSTRUCTION CORP. 114 sets of bored pile, 1.20m to
1.50m diameter, depth
Project Manager
RANGING FROM 35.0m to
55.0m June 2016 – March 2017
Key tasks performed: Managing 2. ARANETA-MAGSAYSAY STA. CLARA
various Bored Piling Projects: FLYOVER, Bacolod City INTERNATIONAL CORP.
Mob / Demob, site setup,
16 sets of bored pile, 1.0m and Sr. Project Engineer
drilling, rebar cage fabrication
1.50m diameter, 15.0M deep JTI Flex Project
and installation, temporary steel
casing driving and extraction, 3. MINULUAN BRIDGE, (Japan Tobacco International,
concrete pouring. Bacolod City LIMA Technology Center,
Completed Projects: 18 sets of bored pile, 1.0m and Batangas, Philippines)
1.50m diameter, 15.0M deep
Ringo Aquino CV

Key tasks performed: McCONNELL DOWELL reinforced concrete, precast


Responsible for the construction AUSTRALIA – March 2008 overhead arches installation
of the 13 hectare 2-storey to September 2015 (RCBC), conveyor modules and
“Factory Building”: All Civil services installation; d)
Works which includes Temporary and Permanent
February – September 2015
earthworks and foundations, Escape Tunnels – earthworks,
McConnell Dowell /
reinforced concrete structures demolition of existing tunnel,
Mastermyne JV
(columns, beams, deck slab, Corrugated Metal Pipe and
etc.), structural steel erection, Project Engineer mechanical services installation.
and all related structures. ANGLO-AMERICAN
Manage subcontractors, work GROSVENOR COAL MINE
Feb 2011 – June 2014
schedule preparation and Key tasks performed:
making sure that work is being McConnell Dowell /
Responsible for the construction
implemented with quality and CCCJoint Venture
of man refuges and drift floor
safely. installation inside 2 x 7.0m dia. Project Engineer
Tunnels (1.0km long, 1:6 slope, QCLNG EXPORT
150mts below ground level) as PIPELINE - Narrows
well as surface civil works Crossing
February – June 2016
(Blast Door – precast and cast- Key tasks performed:
SAMSUNG C&T / S&WOO in-situ concrete structures). Responsible for all earthmoving
CONST. PHILS., INC
activities, causeway construc-
Civil Engineer tion over the mudflats and rail
June – December 2014
SEMPHIL P4 PROJECT track construction for launching
McConnell Dowell / SNC
(Samsung Electro-Mechanics, a twin 42” dia.CWC Pipe
Lavalin JV
CPIP, Batino, Calamba City) (4.0km long) across the
Project Engineer Narrows channel to Curtis
GLENCORE – ROLLESTON Island. Task includes
Key tasks performed: COAL MINE construction of cofferdam
Responsible for the construction (sheet piling) including
Key tasks performed:
of the 4-storey “Factory 4 excavation, processing &
Responsible for the
Building”: Structural steel treatment of Acid Sulphate Soil
Construction of a) 5th Coal
erection, Steel Reinforced utilising a pugmill.
Valve Chamber – general
Columns, Reinforced concrete
earthworks, reinforced concrete
structures (columns, deck slab,
structure including all July 2010 – Jan 2011
etc.) and all related structures.
mechanical services and cast-in
Manage subcontractors and McConnell Dowell /
items; b) Stacker Rail – general
work schedule preparation. NORTHERN NETWORK
earthworks, reinforced concrete
ALLIANCE
rail beams including hold down
bolts and rail installation; c)
Reclaim Tunnel – general
earthworks, cast-in-situ
Ringo Aquino CV

Project Engineer welded joints, grouting of the Key tasks performed:


NORTHERN PIPELINE annular space between tunnel Construction of 36kms Portland
INTERCONNECTOR – &product pipe and site Cement Concrete Pavement
Stage 2 restoration works. with asphalt concrete paved
Outcomes & accomplishments shoulder including all related
Key tasks performed:
achieved: The safely and timely structures - drainages, slope
Responsible for the installation
completion of 19 shafts and 16 protections and retaining walls.
of 1.29m and 1.8m dia. steel
carrier pipe in 1.5m and 2.1m tunnels including installation of Construction of 126.0mts
dia. tunnel respectively, 1829mm dia. carrier pipe. Bridge - craneway, 1.20 and
including planning, costing, 1.80m dia. bored piles, 31.0m
safety and quality. precast prestressed girder, Type
June 2006 – Nov 2007
– V.
Outcomes & accomplishments OBAYASHI-KAJIMA-YAPI
achieved: Longest pipe jacked Rehabilitation of 8 existing
MERKEZI / DUBAI RAPID
tunnel and product pipe (1.1km) bridges – demolition and
LINK CONSORTIUM
in the southern hemisphere. replacement of superstructures.
Senior Civil Engineer
Jacking pipe for tunnel as well
as the product pipe was jacked Key tasks performed:
Sept 2002 – June 2004
uphill wherein entry and Responsible for the construction
of substructures including Subcontractor (Philippines)
receival shaft has a difference
of 60m in elevation. fabrication of all reinforcing Projects completed:
steel bars required on the 1. Construction of 4 Storey
elevated section of the project, School Building, Pasig City
March 2008 – June 2011 including planning, budget, Philippines
McConnell Dowell / WATER prequalification and selection of
2. Construction of 2 Storey
DELIVERY ALLIANCE subcontractors, safety and
School Building, Province of
Project Engineer quality.
Rizal, Philippines
SYDNEY DESALINATION Outcomes & accomplishments
3. Construction of Multi-
PROJECT achieved: The safe and timely
purpose Covered Court,
completion of all substructures
Province of Rizal, Philippines
(Section 3-Elevated Section) of
Key tasks performed: the first urban train network on 4. DIGITEL CELLSITES
Tunnelling - Shaft construction the Arabian Peninsula. (ALCATEL – main contractor)
(bored pile, sheet pile and – Site development, tower
precast conc. segment) and erection, perimeter fence
setup of temporary works and June 2004 – Feb 2006 fabrication and installation
services. Concrete pipe jacking JM LUCIANO CONST., INC. 5. CAELUM
using 2.50M dia. HK EPB Project Engineer COLUMBARIUM, Quezon
Machine and installation of City, Philippines – 99 sets of
PHILIPPINE – JAPAN
1829mm dia. steel pipes in bored pile ranging from 0.60m
FRIENDSHIP HIGHWAY
tunnels. Tasks include to 1.80m diameter (drilling,
(MINDANAO SECTION)
reinstatement of cement mortar
lining, corrosion protection on
Ringo Aquino CV

RSB fabrication & installation Real estate development; new bridges: bored piling,
and concreting). construction of 27 holes all- reinforced concrete pile driving,
weather golf course, including fabrication of PSC Girder Type
bridges and amenities – IV, construction of temporary
Feb 1995 – Aug 2002
4. PAMPANGA DELTA Bailey bridges and craneways.
CM PANCHO CONST., INC.
DEVELOPMENT PROJECT,
Positions Held: Pampanga, Philippines – Personal Information:
Feb – Dec 1995: Office Dredging of Pampanga River,
College Education:
Engineer / Estimator construction of protection dikes,
BS Civil Engineering
Jan 1996 – Dec 1997: Site sluice gates and service roads.
Polytechnic University of the
Engineer 5. 1200MW COMBINED Philippines
Dec 1997 – Aug 2002: Project CYCLE NATURAL GAS Year Graduated: 1994
Engineer POWER PLANT –
Construction of Temporary
Character References:
Jetty
Projects Completed: 1. BonifacioBebiro
6. INFANTA-GEN. NAKAR
1. BRIDGE (SEISMIC) Construction Manager
ROAD – Construction of 6.0km
RETROFITTING PROGRAM, Sta. Clara International
asphalt concrete pavement and
Luzon, Philippines – Corp.
225.0m bridge - bored piling
Construction of bridge and +63906 374 3764
works, RC pile driving,
approaches (19 bridges in 2. Noel Vardeleon
fabrication of 36.0m PSC
Luzon and 4 Flyovers in Metro Operations Manager
Girder Type-VI.
Manila) – Bored piling works, JM Luciano Const., Inc.
7. ROSARIO-PUGO ROAD, +63917 542 1428
jacking of superstructures and
La Union, Philippines – Road 3. Alfredo Fulgencio
bearing pad replacement,
Construction: Portland Cement Project Manager
demolish and replace
Concrete Pavement, Asphalt CM Pancho Const., Inc.
superstructures, column
Concrete Pavement and all +63927 897 8882
strengthening, cable restrainers
related structures. 4. David Sibthorpe
installation, steel and concrete
shear keys installation. 8. PAMPANGA DELTA Project Manager
DEVELOPMENT PROJECT – McConnell Dowell
2. SAN FRANCISCO BRIDGE
IRRIGATION COMPONENT +61488 544 006
– Mount Pinatubo Damage
– Construction of settling 5. Steve Norman
Rehabilitation Project, Tarlac,
basins, pump stations, irrigation Project Manager
Philippines – Construction of
canals, service road and McConnell Dowell
bridge and approaches – bored
bridges. +61401 464 363
piling works, cast-in-place PSC
9. ALLACAPAN – ARITAO +9714 880 1083
Boxed girders and Portland
ROAD REHABILITATION 6. Michael Mutimer
cement concrete pavement.
PROJECT, Cagayan Province, Deputy Project Manager
3. ROYAL NORTHWOODS SNC-Lavalin -
Philippines – Demolition of
GOLF AND COUNTRY McConnell Dowell JV
existing and construction of 9
CLUB, Bulacan, Philippines – +61427 533 344
Ringo Aquino CV

RINGO D. AQUINO
Applicant

Vous aimerez peut-être aussi