Académique Documents
Professionnel Documents
Culture Documents
As explained in the submitted
NCR email, the only part of the
fire pipe that was visible before
completing the floor tiling
installation wasn’t painted primer
paint (for rust protection
purposes),
The contractor should provide an
1.
It was responded by the official response to the sent NCR
contractor that it was the only
part of the pipe that wasn’t
painted,
It should be noted that the only
exposed pipe elbow fitting
(shown picture) isn’t painted,
The fresh air fan was not Commissioning the fan should be
2.
operational
‐‐‐‐‐ done ASAP
The diffuser in the first floor store
room is connected to the fresh air The diffuser should be connected to
3.
instead of the exhaust air
‐‐‐‐‐ the exhaust air network
network
The portable fire extinguishers
The extinguishers shall be installed
4. are still stored in the fire hose ‐‐‐‐‐ in their locations
cabinet
The installation of the condensate
The pipes shall terminate in the
pipes running in the shafts that
5.
serve the branch’s indoor units
‐‐‐‐‐ sump pit located in the basement
parking
are not complete
The sound generated from the
The diffuser connection should be
6. linear bar grille of the unit serving ‐‐‐‐‐ checked if installed properly
the first floor lobby is high
The diffuser box connected to the
flexible duct serving the storage The box should be placed on the
7.
room is not supported at all and diffuser and fixed to it
is not connected to the diffuser
The fire hose reel cabinet does A sign/sticker should be placed on
8. not have an indicator sign/sticker, the cabinet doors indicating it is a
and the manufacturer is not clear fire hose reel cabinet
The louver installed is not a sand
A sand trap louver shall be installed
trap louver as required,
Adequate spacing between the fan
9. The filters unit is not fixed
and the VRF outdoor unit should be
properly, and is fixed by a steel
provided, and the fan should be
piece to the VRF outdoor unit
fixed properly
base
The fan isn’t fixed properly to the
base, and the anti‐vibration pads The fan should be fixed properly to
for both fans are installed the base, and the anti‐vibration pads
between the base and the roof should be installed between the fan
10. floor, and the base
It also should be noted that the any damages to the roof floor
fan’s base is fixed to the roof insulation shall be under the
floor through rods screwed in the contractor’s responsibility
floor
The wall penetration should be
The wall penetration for the cable shown to the client, and the client
tray and exhaust air duct above shall approve that no security risks
11. the safe room is too large and not exist with the current condition
sealed or protected by the safe Even if the client approves the
room metal grid opening, it should be constructed
properly
No access panels were provided Access panels should be provided for
12.
for the duct fire dampers the fire dampers
No duct access doors nor ceiling
access panels were installed for
Duct access doors and ceiling access
the AC indoor units that have a
panels should be installed and
return plenum box (the units
provided for all the units that have
located in the kitchenette and the
13. meeting room) return plenum boxes
The opening in the plenum box of
The opening in the plenum box of
the unit located in the meeting room
the unit located in the meeting
shall be closed
room is not acceptable as an
access door for the filters
The return duct of the AC indoor
unit located in the kitchenette is
The return duct should be installed
14. not installed as per the tender
as per the approved shop drawings
design and approved shop
drawings
The air filters of the indoor unit
serving the ground floor lounge The system supplier shall approve
15.
are not accessible from the unit’s that all the access panels locations
access panel
The air filters of the unit serving The system supplier shall approve
16. the tellers are obstructed by the that all the filters are accessible and
cable tray the installation is approved
The lifting pump does not have an electrical isolator should be
17.
an electrical isolator installed for the lifting pump
Unutilized duct hangers are still
All unutilized objects located above
18. installed above false ceiling, and
the false ceiling should be removed
the space in general isn’t tidy
The roof water tanks are vented
The roof water tanks should vented
from the feeding line, no water
from the top the tank, a water level
level indicators are installed, the
indicator should be installed, proper
19. pipes are supported using a piece
supports should be installed for the
of wood, and the isolating valves
pipework, and the vent pipe on the
are obstructed by the vent pipe
feeding line should be removed
and do not fully open
The wall penetrations of the
The wall penetrations should be
20. mechanical services are not
treated and sealed properly
closed properly
The duct flexible connections The duct flexible connections
21. (canvas) ends are not sealed (canvas) ends should be properly
properly or stitched sealed and stitched
The rainwater canopies should be
installed for the fans
The rainwater canopies are not
22. The exhaust air fan should have a
installed for the fans,
wire mesh installed on its discharge
outlet
Fresh and exhaust ductwork
should be double checked if duct
23. ‐‐‐‐‐
sealant is applied to all ductwork
joints
The return air ductwork isn’t The return air ductwork should be
24.
thermally insulated thermally insulated
The main water pipe feeding the
first floor running under tile is
cPVC, it was asked to be replaced
The main water supply pipes should
25. with a PEX pipe as per the tender
be pressure tested at 6 bar
design and approved shop
drawing in the project’s early
stages
The finishing of the false ceiling
around the sprinkler head serving The false ceiling opening should be
26.
the server room is not properly properly finished
done
Although check valves are installed
The filling lines of the transfer
on both lines, it was agreed that
27. pump and the water municipality
each line would connect to the roof
join together on the roof floor
tanks separately
A level indicator for the basement A level indicator for the basement
28.
floor water tank isn’t installed floor water tank should be installed
No anti‐vibration pads were
Anti‐vibration pads should be
29. installed for the VRF outdoor
installed for the VRF outdoor units
units
General Notes and Recommendations:
1) Tagging and labeling for all the mechanical services shall be done
2) Operation manuals and the requested spare parts for the equipment shall be provided
3) Any training required to the client for dealing with the equipment shall be provided
4) The commissioning report from MALKY, attached with their check list approval of the installation shall be provided