estimation of plastering.
2. From the given figure below calculate the detailed estimate for the
single roomed building (Load bearing type structure) by Longwall-
short wall method.
3.
4. .c
From the given figure calculate the details and abstract estimate for the
single Storied residential building by centre line method.
(i) Calculate the quantity of brickwork in a semi-circular arch of 2.2m span,
ul
50cm rise and 30cm thick. The breadth of the wall is 40cm.
(ii) An arch of 2.5m span subtens an angle of 80 ͦ at the centre. The thickness
pa
of arch is 40cm. Calculate the quantity of arch masonry work.
5. (i) Calculate the quantity of brickwork in a 60 ͦ arch over a door of 1.2m
wide. The thickness of arch is 20cm & that of wall is 30cm.
(ii) Calculate the quantity of brickwork in a semi-circular arch of 2m span,
in
(ii) Explain the methods used to find the approximate cost of the building.
R
Download Important Question from rejinpaul.com & also refer your friends!!
1:3 mortar mixed with standard water proofing compound. Upper &
lower portion of soak pit shall be of second class brickwork in 1:6
cement mortar& middle portion shall be of dry brickwork. Roof
covering slabs & baffle wall shall be of preacst RCC. The length of the
connecting pipe from latrine seat may be taken as 3m.
9. Prepare a detailed estimate of a septic tank with soak pit for 50 users
together with sanitary fittings of one seat of latrine from the given
drawing. Septic tank shall be of first-class brick masonry 1:4 cement
om
mortar over cement concrete 1:3:6 foundation & base, with RB
partition wall & RCC slab cover. Inside of tank including floor shall be
12mm cement plastered 1:2 mortar mixed with water proofing material.
Soak pit shall be of second-class brick masonry with 1:6 cement
mortar. Estimate for water arrangements should also be made with a
.c
250l GI overhead tank connecting flusting cistern of WC & a water tap,
assuming that there is a pipe water supply within 10m of the latrine.
ul
10 A road is to be constructed in a side long ground partly in cutting &
. partly in banning. The formation width of road is 10m, cross slope of
ground is 6:1, side slope in banking 2:1 & in cutting 1.5:1, depth of
pa
. estimating.
12 Prepare a detailed estimate of box culvert-
. • Earthwork excavation
ej
• PCC 1:5:10
DIAGRAMS
Download Important Question from rejinpaul.com & also refer your friends!!
1..
om
.c
ul
pa
in
ej
R
Download Important Question from rejinpaul.com & also refer your friends!!
om
.c
ul
pa
in
ej
R
Download Important Question from rejinpaul.com & also refer your friends!!
om
.c
ul
pa
in
ej
R
Download Important Question from rejinpaul.com & also refer your friends!!
om
.c
ul
.
pa
in
ej
R
Download Important Question from rejinpaul.com & also refer your friends!!
UNIT III, IV & V
1. Prepare a detailed estimate of a masonry well of 2m dia and 14m deep exclusive
the curb, the soil water level being 3.8m below G.L. The steining of well is of 30cm
thick of first class brick masonry in 1:6 CM. The inside and exposed surfaces shall
be pointed with 1:2 CM. The well should be raised 60cm above GL and an apron
of 4cm C.C over 7.5cm L.C. 1 meter wide shall be provided all around the well.
om
The curb shall be of RCC with 75x75x6mm angle iron cutting edge.
2. Prepare a detailed estimate of slab culvert of 1.5m span & 4m roadway from the
given drawing. The general specification are as follows:
Foundation concrete shall be of cement concrete 1:3:6 with stone ballast & coarse
sand. Masonry shall be of first class brick work in 1:4 cement coarse sand
.c
mortars. Slab shall be of RCC 1:2:4 with reinforcement. Exposed surface of brick
masonry shall be cement pointed 1:2. Road shall be provided with cm thick
wearing coat of 1:2:4 cement concrete.
ul
3. Prepare an estimate of 50mm dia tube well 100m deep with deep well pump from
the given drawing. The strainer will consist of 3 pieces of 1.5 m each. The housing
pa
Download Important Question from rejinpaul.com & also refer your friends!!
DIAGRAMS
1.
om
.c
ul
pa
in
ej
R
Download Important Question from rejinpaul.com & also refer your friends!!
2.
om
.c
ul
pa
in
ej
R
3.
Download Important Question from rejinpaul.com & also refer your friends!!
om
.c
ul
pa
in
ej
R
4.
Download Important Question from rejinpaul.com & also refer your friends!!
om
10.
.c
ul
pa
in
13. Explain in detail how you will work out standard rent of a Government
ej
building.
14. Write a report to accompanying an Estimate for a village water supply
R
scheme.
15. (i) Explain different forms of value.(ii) Discuss about a Freehold property
16. (i)An owner occupied property is required to be valued for the wealth tax
purpose on land and building. The following particulars are available. Find the
present value of the property.
Value of the land = Rs. 400000
Cost of the building to put up such
Download Important Question from rejinpaul.com & also refer your friends!!
A building at present = Rs. 1000000
Estimate cost of repairs = Rs. 500000
Depreciation to be allowed for the building = 0.75% per annum
(ii)Explain different forms of value.
17. Calculate the standard rent of a government residential building newly
constructed from the following data.
om
(i) Cost of land- Rs.10,000
(ii) Cost of construction of the building – Rs.40,000
(iii) Cost of road within the compound and fencing – Rs.20000
(iv)
(v)
.c
Cost of electrical installation including fans 8% of cost of building
Municipal house tax-Rs.400 per annum
ul
(vi) Water tax – Rs.250 per annum
(vii) Property tax- Rs.140 per annum
pa
18. What are the methods of determining the depreciations? Explain with an
example Depreciation based method of valuation of a property.
19. Write a model report on estimate of residential buildings.
in
24. (i)An old building has been purchased by a person at a cost of Rs.30000
excluding the cost of land. Calculate the amount of annual sinking fund at 4%
interest assuming the future life of the building as 20 years and the scrap value
of the building as 10 % of the cost of purchase.
(ii)Calculate the standard rent of a government residential building newly
constructed from the following data: cost of land-Rs.10000. cost of
construction of the building-Rs. 40000. Cost of roads within the compound and
fencing Rs.20000. Cost of electric installation including fans 8% of the cost of
Download Important Question from rejinpaul.com & also refer your friends!!
the building. Municipal house tax-Rs. 400 per annum. Water tax-Rs.250 per
annum. Property tax- Rs.140 per annum.
25. Discuss the importance of valuation.
26. Factors to be considered in water supply and sanitation installations.
om
.c
ul
pa