09/11/2011–28/09/2013 QC Technician
Company name: Van Oord, Baku (Azerbaijan)
Project name: New Baku International Trade Sea Port Complex in Alat settlement
Client name: The Ministry of Transport of Azerbaijan Republic
▪ Support daily, weekly and monthly quality testing, inspections and procedures;
▪ Initiate corrective actions to have final products with required specifications;
▪ Support Quality Control Manager to train associates on safety program to protect employees
against harm;
▪ Update and maintain all documentation for auditing purposes and collect samples for shelf life and
laboratory analysis;
▪ Conduct quality calibrations, internal audits and project assignments in timely, safe and professional
manner;
▪ Report results, issues and roadblocks to Quality Supervisor or Quality Manager;
▪ Convey any instrumentation issues to QC Supervisor for review and resolution;
▪ Report QC Supervisor or QC Manager of unusual product observations and analytical results while
analysing or sample handling;
▪ Comply with established quality, safety, and environmental procedures and policies;
▪ Review shop drawings with affected personnel to ensure proper fabrication of product;
▪ Interact regularly with management, production and outside agencies in all plant operations;
▪ Maintain oversight of concrete production and testing;
Page 1 / 11
▪ Make inspection with DFT gauge in line with Project Coating Systems stipulated in Specification;
▪ Daily check and records of ambient condition that includes Relative Humidity, Surface Temperature,
Ambient Temperature, Dew Point;
▪ Make inspection of surface preparation and coating application in accordance with international
codes, such as NACE, SSPC, ASTM, ISO;
▪ Visual inspection of coated surfaces;
▪ Visual inspection of coated concrete surfaces;
▪ Supervision of fully cured concrete, its surface preparation, ambient condition, pouring condition,
finishing operation;
▪ Perform visual inspection for hot-applied tapes for: adhesive bleed-out along the entire length
of the taped area, air pockets trapped under the entire length of the taped area, holidays
(pinholes), wait for the hot applied coating tape to cool to ambient temperature
Page 3 / 11
14/09/2017 – 02/02/2018 QA/QC Coating and Painting Inspector
Company name: AEGION Coating Services (CRTS) - SAUDI ARABIA
Project name: Hasbah Offshore Gas Facilities – Increment II Project
Page 4 / 11
10/02/2018 – 31/04/2018 QC Specialist
Company name: BETEKO Group LLC - Azerbaijan
Project name: Installation of Telecommunication Towers
Client: Azerconnect LLC
▪ Preparation of Quality Manual of Company;
▪ Preparation of Procedures, ITPs and Method Statement;
▪ Preparation of KPIs;
▪ Hold PQT;
Page 5 / 11
01/05/2018 – Present QA/QC Painting and Insulation Inspector
Company name: TechnipFMC - Azerbaijan
Project name: Azerikimya’s Ethylene-Polyethylene Plant Modernization Project
Client: SOCAR KBR
Page 6 / 11
EDUCATION AND TRAINING
15/09/2006–20/07/2010 Translator
Baku EuroAsia University, Baku (Azerbaijan)
PERSONAL SKILLS
English C1 C1 C1 C1 C1
Russian B2 B2 B2 B2 B2
Turkish C1 C1 C1 C1 C1
Levels: A1 and A2: Basic user - B1 and B2: Independent user - C1 and C2: Proficient user
Common European Framework of Reference for Languages
HANDS ON PRACTICE:
Various painting/coating, visual inspection of abrasive, grit, shot, garnet, blasting/painting/coating by
using the following measuring instruments: Whirling and Electronic Hygrometer, Infrared
Thermometer, Magnetic Surface Contact Thermometer, Centrifugal Blasting, Testex Tape, Surface
Profile Gauge with Micrometer, Orifice Gauge, Holiday Detector, Wet Sponge Pin Hole Detector (High
Voltage and Low Voltage Holiday Testing Instrumentation), Chloride Detector SCM 400 salt tester,
Bresle Patch salt test, Adhesion Pull-off Test, Peel Strength Gauge, Hardness gauge & Impact Test
etc.
ANNEXES
▪ NACE CERTIFICATES
Page 7 / 11
Page 8 / 11
Page 9 / 11
Page 10 / 11
Page 11 / 11