Vous êtes sur la page 1sur 11

Curriculum vitae

PERSONAL INFORMATION Rauf Aliyev


H.Aliyev 30, Khirdalan, Baku (Azerbaijan)
+99450 538 3189 +99455 525 6702
raufaliyev1988@gmail.com

JOB APPLIED FOR Coating, Painting and Insulation Inspector


WORK EXPERIENCE

09/11/2011–28/09/2013 QC Technician
Company name: Van Oord, Baku (Azerbaijan)
Project name: New Baku International Trade Sea Port Complex in Alat settlement
Client name: The Ministry of Transport of Azerbaijan Republic
▪ Support daily, weekly and monthly quality testing, inspections and procedures;
▪ Initiate corrective actions to have final products with required specifications;
▪ Support Quality Control Manager to train associates on safety program to protect employees
against harm;
▪ Update and maintain all documentation for auditing purposes and collect samples for shelf life and
laboratory analysis;
▪ Conduct quality calibrations, internal audits and project assignments in timely, safe and professional
manner;
▪ Report results, issues and roadblocks to Quality Supervisor or Quality Manager;
▪ Convey any instrumentation issues to QC Supervisor for review and resolution;
▪ Report QC Supervisor or QC Manager of unusual product observations and analytical results while
analysing or sample handling;
▪ Comply with established quality, safety, and environmental procedures and policies;
▪ Review shop drawings with affected personnel to ensure proper fabrication of product;
▪ Interact regularly with management, production and outside agencies in all plant operations;
▪ Maintain oversight of concrete production and testing;

09/10/2013–12/11/2014 QA/QC Coating/Painting Inspector


Company name: ECAP Engineering and Consultancy Inc, Baku (Azerbaijan)
Project name: New Baku International Trade Sea Port Complex in Alat settlement
Client name: The Ministry of Transport of Azerbaijan Republic
▪ Supervision of ongoing coating and painting activities at the construction site in line with
specification of the Employer, and TDS & AG of manufacture;
▪ Preparation of final inspection reports, Adhesion Pull-off test, Soluble Salt test reports;
▪ Preparation of weekly registers in accordance with completed weekly reports;
▪ Supervision and checking pre-surface condition, surface preparation, blasting and coating
application activities;

Page 1 / 11
▪ Make inspection with DFT gauge in line with Project Coating Systems stipulated in Specification;
▪ Daily check and records of ambient condition that includes Relative Humidity, Surface Temperature,
Ambient Temperature, Dew Point;
▪ Make inspection of surface preparation and coating application in accordance with international
codes, such as NACE, SSPC, ASTM, ISO;
▪ Visual inspection of coated surfaces;
▪ Visual inspection of coated concrete surfaces;
▪ Supervision of fully cured concrete, its surface preparation, ambient condition, pouring condition,
finishing operation;

17/12/2014–03/04/2017 QA/QC Coating, Painting and Insulation Inspector


Company name: Azfen-Tekfen Alliance, Baku (Azerbaijan)
Project name: Shah Deniz 2 Onshore Gas Terminal Facility Construction Works Project
Client: BP Exploration (Caspian Sea Ltd.)
▪ Day to day supervision of ongoing mechanical/coating activities at the construction site and see to it
that the work is in accordance with the engineering design and specification and within the scope of
work;
▪ Preparation and compilation of quality reports/records and other quality related documents;
▪ Responsible for updating daily activities such as RFI, Blotter Test, Blast Abrasive Visual Inspection,
test reports etc.;
▪ Co-ordinate with project supervisor on quality deficiencies and non-conformances to prepare
corrective and preventive action plan;
▪ Checking Surface preparation, Coating Quality, Holiday, WFT, DFT, and Weather Condition,
Application & Final inspection of international codes and standards;
▪ Following specific duties such as recording weather conditions &substrate temperature by using
whirling hygrometer, dew point & RH % slide calculator and steel temperature gauge;
▪ Conversant with inspection techniques such as surface cleanliness/profile check, chloride test,
WFT& DFT Checks, adhesion test, Holiday detection etc. as per the industry standards;
▪ Perform in-process and final inspection of coating and painting activities that includes verification of
blasting materials to be used. Inspection and testing of coating/ painting equipment, visual
inspection and verify surface profile of metal surface prior to metal surface prior to coating/ painting
after blasting/cleaning;
▪ Conduct visual inspection on coated/painted surface and verify the wet and dry film thickness.
Pressure record and/or report of complete works among other;
▪ Coordinate with the client and sub-contractors representative on daily basis to resolve any quality
problems or issued;
▪ Conduct visual inspection of all painting/coating materials to insure its compliance with the required
project standard and specification;
▪ Conduct visual inspection on all equipment to use to ensure equipment is calibrated and in good
operating condition;
▪ Conduct in process and final inspection of painted/coated pipe surface prior to delivery and
installation at site;
▪ Preparation and compilation of quality reports/records and other quality related documents for
activity acceptance and final project handover;
▪ Carry out inspection for PUF (polyurethane foam insulation) insulation and also
thickness for insulation product
▪ Inspection for hot (thermal) insulation of pipe and spools
▪ Review the P&ID drawing piping for temperature in insulation of hot and cold insulation
▪ Carry out of inspection in the equipment for insulation (boiler, HRSG - heat recovery of steam
generators and reactor vessel & column vessel, exchanger equipment, drum & tank, cold box)
▪ Checking the material for insulation and the equipment using to the thermal hot and cold
insulation
Page 2 / 11
11/04/2017 – 31/08/2017 QA/QC Coating and Painting Inspector
Company name: Azfen JV, Baku (Azerbaijan)
Project name: Provision of Dimensional Survey, Fabrication and Installation Services for
Brownfield Onshore/Offshore for the DBXO (SD1 Debottlenecking and Crossover
Project) during Execute Stage
Client: WorleyParsons
▪ Day to day supervision of ongoing mechanical/coating activities at the construction site and see to it
that the work is in accordance with the engineering design and specification and within the scope of
work;
▪ Preparation and compilation of quality reports/records and other quality related documents;
▪ Checking Surface preparation, Coating Quality, WFT, DFT, and Weather Condition, Application &
Final inspection of international codes and standards;
▪ Following specific duties such as recording weather conditions &substrate temperature by using
whirling hygrometer, dew point & RH % slide calculator and steel temperature gauge;
▪ Perform in-process and final inspection of coating and painting activities that includes verification of
blasting materials to be used. Inspection and testing of coating/ painting equipment, visual
inspection and verify surface profile of metal surface prior to metal surface prior to coating/ painting
after blasting/cleaning;
▪ Conduct visual inspection on coated/painted surface and verify the wet and dry film thickness.
Pressure record and/or report of complete works among other;
▪ Coordinate with sub-contractor representative on daily basis to resolve any quality problems or
issued;
▪ Conduct visual inspection on all equipment to use to ensure equipment is calibrated and in good
operating condition;
▪ Conduct visual inspection of all painting/coating materials to insure its compliance with the required
project standard and specification;
▪ Preparation and compilation of quality reports/records and other quality related documents for
activity acceptance and final project handover.
▪ Monitoring the constructions of the work and surveillance the materials for insulation
▪ Perform Peel test for hot applied insulation
▪ Control surface preparation under insulation
▪ Control use of correct insulation materials, their proper application and alignment
▪ Inspection for flange and valve (hot and cold insulation)
▪ Perform visual inspection for cold insulation (cold-applied tapes): ensure the tape conforms to
the pipe surface, ensure the tape overlaps and spirals as required, ensure there are no fish
mouths defects or a kink in the tape, and ensure there are no cracks or holes in the tape
▪ Perform physical inspection for cold insulation (cold-applied tapes): feel the wrapped tape to
ensure it is totally adhered to the pipe’s surface and do holiday detection

▪ Perform visual inspection for hot-applied tapes for: adhesive bleed-out along the entire length
of the taped area, air pockets trapped under the entire length of the taped area, holidays
(pinholes), wait for the hot applied coating tape to cool to ambient temperature

Page 3 / 11
14/09/2017 – 02/02/2018 QA/QC Coating and Painting Inspector
Company name: AEGION Coating Services (CRTS) - SAUDI ARABIA
Project name: Hasbah Offshore Gas Facilities – Increment II Project

Client: Saudi Aramco


▪ Visual Inspection of the Field Joint Area;
▪ Visual inspection on all equipment to use to ensure equipment is calibrated and in good
operating condition;
▪ Visual inspection of all painting/coating materials to insure its compliance with the required
project standard and specification;
▪ Measurement of ambient temperature, relative humidity and dew point;
▪ Measurement of steel surface temperature;
▪ Surface roughness testing and visual inspection of metal surface after dry abrasive blasting;
▪ Salt contamination and dust testing;
▪ Internal tracking number of joint no;
▪ Measurement of ambient temperature, relative humidity, dew point before coating
application;
▪ Ratio Check of Component Base and Hardener;
▪ Inspection of surface preparation and prior to application of paint;
▪ WFT check;
▪ Dry Film Thickness measurement after curing;
▪ Holiday Inspection;
▪ Adhesion Test (Pull-off);
▪ Cure Test (MEK-rub test);
▪ Preparation of quality reports and other quality related documents;

Page 4 / 11
10/02/2018 – 31/04/2018 QC Specialist
Company name: BETEKO Group LLC - Azerbaijan
Project name: Installation of Telecommunication Towers
Client: Azerconnect LLC
▪ Preparation of Quality Manual of Company;
▪ Preparation of Procedures, ITPs and Method Statement;

▪ Development of new report forms;


▪ Preparation of Quality Policy of Company;
▪ Preparation of Site Inspection Reports;

▪ Preparation Corrective Action Reports;


▪ Raise Non Conformance Reports;

▪ Visual inspection of Civil Works;


▪ Visual inspection of galvanized items and painted materials;
▪ Obtain all necessary docs such as certificates, calibration reports;

▪ Development of all Quality Forms;

▪ Perform Internal Audits;

▪ Preparation of KPIs;

▪ Development of Risk Assessment;

▪ Make SWOT Analysis;

▪ Hold PQT;

▪ Inspection of all sites routinely and make reports

Page 5 / 11
01/05/2018 – Present QA/QC Painting and Insulation Inspector
Company name: TechnipFMC - Azerbaijan
Project name: Azerikimya’s Ethylene-Polyethylene Plant Modernization Project
Client: SOCAR KBR

Page 6 / 11
EDUCATION AND TRAINING

15/09/2006–20/07/2010 Translator
Baku EuroAsia University, Baku (Azerbaijan)

PERSONAL SKILLS

Mother tongue(s) Azerbaijani

Other language(s) UNDERSTANDING SPEAKING WRITING

Listening Reading Spoken interaction Spoken production

English C1 C1 C1 C1 C1
Russian B2 B2 B2 B2 B2
Turkish C1 C1 C1 C1 C1
Levels: A1 and A2: Basic user - B1 and B2: Independent user - C1 and C2: Proficient user
Common European Framework of Reference for Languages

Job-related skills SUMMARY OF EXPERIENCE:


Conversant with Painting/Coating procedures, paint manufacturer data sheets like Jotun. Coating
systems like polyamine cured phenolic/novolac epoxy coating, oxidatively drying alkyd, Epoxy coating,
Inorganic and organic zinc primer, Polyurethane, solvent based acrylic thin film intumescent coating,
glass flake epoxy coating, solvent free amine cured epoxy intumescent coating and FBE Liquid
coating for buried service piping, pipelines and heat shrink sleeves, tape wrapping etc.

HANDS ON PRACTICE:
Various painting/coating, visual inspection of abrasive, grit, shot, garnet, blasting/painting/coating by
using the following measuring instruments: Whirling and Electronic Hygrometer, Infrared
Thermometer, Magnetic Surface Contact Thermometer, Centrifugal Blasting, Testex Tape, Surface
Profile Gauge with Micrometer, Orifice Gauge, Holiday Detector, Wet Sponge Pin Hole Detector (High
Voltage and Low Voltage Holiday Testing Instrumentation), Chloride Detector SCM 400 salt tester,
Bresle Patch salt test, Adhesion Pull-off Test, Peel Strength Gauge, Hardness gauge & Impact Test
etc.

ANNEXES
▪ NACE CERTIFICATES

Page 7 / 11
Page 8 / 11
Page 9 / 11
Page 10 / 11
Page 11 / 11

Vous aimerez peut-être aussi