Areas Covered:
GRP
Excitation System
Equipment testing
Excitation system:
• DAVR transducers Calibration.
• DAVR redundant network for DPU checking.
• DAVR DPU Backup taken.
• Excitation system DAVR cleaning, tightness, cards settings checking,
• Addresses checking, voltage and current injection and light load test.
• DAVR load limiters checking.
• DAVR Alarm and SOE checking.
Venkatesw Digitally signed by
Venkateswara Rao B
GRP:
• Testing & Calibration of GRP relays.
• CT/ PT Tightness testing at GRP.
• CT Resistance measurement and IR measurement of Generator CTs.
• IR Value checking of field cables.
• GRP logic, SOE & Alarm checking.
• SCC and OCC Testing.
• PT Primary injection.
• Offline stability checking before barring gear.
• 400KV Main and Tie breaker closing and tripping from UCB.
• C&I Load transducers and Load shedding relay calibration and testing.
• Auto synchroniser calibration and testing done.
HT and LV Switchgear:
10
11
12
13
14
15
16
17
18
19
Page 1 of 7
UNIT # 4 GENERATOR SCC OCC DATE:05/10/2014
page:2 / 7
BRIDGE-1
1 2 3 4 5 6
BRIDGE-2
1 2 3 4 5 6
Current Common
1 2 3 4 5 6
BRIDGE-1
1 2 3 4 5 6
BRIDGE-2
1 2 3 4 5 6
Digitally signed by
Venkatesw Venkateswara
B
Rao
Page 2 of 7
UNIT # 4 GENERATOR SCC OCC DATE:05/10/2014
page:3 / 7
Page 3 of 7
UNIT # 4 GENERATOR SCC OCC DATE:05/10/2014
page:4 / 7
DATE: 16.09.2018
GEN SCC
16000
14000
12000
Panel KA Gen
10000
8000
6000
4000
2000
0
0 10 20 30 40 50 60
If%
Ig & Q-AXIS
2500
2000
Rotor fld current
1500
1000
500
0
0 2000 4000 6000 8000 10000 12000 14000 1600
Ig (Panel KA)
Digitally signed by
Venkatesw Venkateswara Rao B
ara Rao B Date: 2019.01.29
10:38:02 +05'30'
Page 4 of 7
UNIT # 4 GENERATOR SCC OCC DATE:05/10/2014
page:6 / 7
GEN OCC
35
30
25
20
Ug%
15
10
0
0 20 40 60 80 100 120
If%
Page 6 of 7