Vous êtes sur la page 1sur 1

Technical Bulletin #461

Transmission: 4L30-E
Subject: Delays forward
Application: Isuzu
Issue Date: April, 1998

4L30-E
Delays Forward
A delayed forward engagement condition can be caused by Band Control Solenoid (323). It is not uncommon
for the solenoid feed screen (324) to break apart, clogging the solenoid. If the screen is broken, replace both the
screen and the solenoid.

309

320
319
306 318 310

323
321
317 317
325
324
322
305
309
304 326
303 305
308 317
307 312 301
311
310

302

302

301 Body, Valve Main Case 312 Valve Low Pressure Control
302 Pin, Spring 317 Ball, Check
303 Solenoid Assembly, ON/OFF N.C. 318 Valve, 1-2 Accumulator Control
304 Valve, 1-2 & 3-4 Shift 319 Spring, 1-2 Accumulator Control (Optional)
305 Spring 1-2 & 3-4 (2-3) Shift 320 Valve, 1-2 Accumulator
306 Retainer, Valve 321 Washer, Waved PWM Solenoid
307 Solenoid Assembly, ON/OFF N.O. 322 Pin, Solenoid PWM
308 Valve 2-3 Shift 323 Solenoid Assembly, Band Control PWM
309 Pin, Spring 324 Screen Assembly, PWM Solenoid
310 Plug, Valve Bore 325 Plug Screen
311 Spring, Valve Low Pressure Control 326 Valve, Manual

Copyright © 2003 ATRA. All Rights Reserved. DM! Page 1 of 1

Vous aimerez peut-être aussi