Vous êtes sur la page 1sur 4

College of Engineering, University of the Philippines Diliman

ICE Building corner Pardo de Tavera St. and F. Maramag St. , Diliman, Quezon City 1101
Tel.: +632-9818500 loc. 3116, 3122

Date: __________________

Name of interviewee: _____________________________________________________________

Company/Employer: ______________________________________________________________

Position: Architect Engineer Foreman Other:______________


Location: Quezon City Manila City Caloocan City Makati City Taguig City
Pasig City Paranaque City Pasay City Mandaluyong City
Malabon City San Juan City Valenzuela City Las Pinas City
Marikina City Navotas City Muntinlupa City Pateros
Roof-to-Wall Connection Roof-to-Column Connection
Construction Material of Roof: Construction Material of Roof:
Galvanized Iron with Wooden Truss Galvanized Iron with Wooden Truss
Galvanized Iron with Metal/Steel Truss Galvanized Iron with Metal/Steel Truss
Construction Material of Wall: Construction Material of Column:
Precast /Cast-in-Place Concrete Precast /Cast-in-Place Concrete
Concrete Hollow Blocks Concrete Hollow Blocks
Materials used in connecting: Materials used in connecting:
Nails Nails
Anchor bolts Anchor bolts
Rebars Rebars
Angle bars/Brackets Angle bars/Brackets
Top plate Top plate
Ties Ties
Welds Welds
Others: __________________________________ Others: ____________________________________
________________________________________ __________________________________________
Quick Sketch of the Connection: Quick Sketch of the Connection:
College of Engineering, University of the Philippines Diliman
ICE Building corner Pardo de Tavera St. and F. Maramag St. , Diliman, Quezon City 1101
Tel.: +632-9818500 loc. 3116, 3122

For architect/engineer: Do you give plans/instructions on how to do the connections for roof to wall and
roof to column? Yes No

For foreman: Do you get plans/instructions from architects/engineers on how to do the connections for
roof to wall and roof to column? Yes No
If no, how do you decide what to do with these connections?
Based on past experiences
Based on current materials or situation that you can work with
Others/Comments: ______________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

Thank you for answering the survey. Your participation is highly appreciated.

Prepared by: Noted by:

Edlyn Julianne C. Hokia Engineer Timothy John S. Acosta


BS Civil Engineering Assistant Professor
University of the Philippines Diliman Institute of Civil Engineering
University of the Philippines Diliman
College of Engineering, University of the Philippines Diliman
ICE Building corner Pardo de Tavera St. and F. Maramag St. , Diliman, Quezon City 1101
Tel.: +632-9818500 loc. 3116, 3122

Date: October 11, 2018

Name of interviewee: Juan Dela Cruz_______________

Company/Employer: High Construction Inc. _____________

Position: Architect Engineer Foreman Other:______________


Location: Quezon City Manila City Caloocan City Makati City Taguig City
Pasig City Paranaque City Pasay City Mandaluyong City
Malabon City San Juan City Valenzuela City Las Pinas City
Marikina City Navotas City Muntinlupa City Pateros
Roof-to-Wall Connection Roof-to-Column Connection
Construction Material of Roof: Construction Material of Roof:
Galvanized Iron with Wooden Truss Galvanized Iron with Wooden Truss
Galvanized Iron with Metal/Steel Truss Galvanized Iron with Metal/Steel Truss
Construction Material of Wall: Construction Material of Column:
Precast /Cast-in-Place Concrete Precast /Cast-in-Place Concrete
Concrete Hollow Blocks Concrete Hollow Blocks
Materials used in connecting: Materials used in connecting:
Nails Nails
Anchor bolts Anchor bolts
Rebars Rebars
Angle bars/Brackets Angle bars/Brackets
Top plate Top plate
Ties Ties
Welds Welds
Others: __________________________________ Others: Anchor/Toenail and Nuts______________
________________________________________ __________________________________________
Quick Sketch of the Connection: Quick Sketch of the Connection:
College of Engineering, University of the Philippines Diliman
ICE Building corner Pardo de Tavera St. and F. Maramag St. , Diliman, Quezon City 1101
Tel.: +632-9818500 loc. 3116, 3122

For architect/engineer: Do you give plans/instructions on how to do the connections for roof to wall and
roof to column? Yes No

For foreman: Do you get plans/instructions from architects/engineers on how to do the connections for
roof to wall and roof to column? Yes No
If no, how do you decide what to do with these connections?
Based on past experiences
Based on current materials or situation that you can work with
Others/Comments: ______________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

Thank you for answering the survey. Your participation is highly appreciated.

Prepared by: Noted by:

Edlyn Julianne C. Hokia Engineer Timothy John S. Acosta


BS Civil Engineering Assistant Professor
University of the Philippines Diliman Institute of Civil Engineering
University of the Philippines Diliman

Vous aimerez peut-être aussi