Académique Documents
Professionnel Documents
Culture Documents
60
m
4.27
m
7.55
m
m
FCU -CS
2.27
5.0TR
m
3.92
09
UNIT 309
IT 3
ACCU
5.0TR
UN
m
5.70
3. CONTRACTOR MUST SUBMIT SHOP DRAWINGS INDICATING ACTUAL EQUIPMENT DIMENSION AND OPERATING WEIGHTS. SUFFICIENT CLEARANCES TO FACILITATE NORMAL SERVICES
AND MAINTENANCE WORKS ARE PROVIDED IN THIS DESIGN PLANS. HOWEVER, SHOULD ACTUAL EQUIPMENT PHYSICAL SIZES DIFFER CONSIDERABLY FROM THOSE SHOWN IN THE PLANS,
THE CONTRACTOR SHOULD NOTIFY THE ARCHIPTECT OR DESIGN ENGINEER IMMEDIATELY IN WRITING,
m
0.98
4. ALL EQUIPMENT SHALL SET ON 150MM THICK, LEVEL REINFORCED STEEL BASE, UNLESS OTHERWISE SPECIFIED. (FOR FLOOR MOUNTED EQUIPMENT).
PROJECT TITLE
5. ALL EQUIPMENT SHALL BE MOUNTED ON OR SUPPORTED BY VIBRATION ISOLATOR OR ASSEMBLIES.
6. ALL AC UNIT CEILING CONCEALED SHALL HAVE SERVICE ACCESS TO BE PROVIDED BY THE CIVIL CONTRACTOR.
7. ALL PIPING SHALL BE LEAK TESTED WITH A PRESSURE OF AT LESAT 1 1/2 TIMES THE DESIGN WORKING PRESSURE (24 HOUSE).
9. DEVIATIONS AND REVISIONS FROM THE PLANS SHALL BE PREFFERED TO THE ARCHITECTS FOR REVIEW AND APPROVAL. Mandaluyong City
10. ALL NECESSARY GOVERNMENT PERMITS SHALL BE SECURED AND BORNE BY THIS CONTRACTOR.
11.ALL WORKS SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE. CLIENT
12. THE AIR CONDITIONING AND VENTILLATION SYSTEM SHOULD BE PROPERLY BALANCE BY A SEPARATE CONTRACTOR AND TO SUBMIT BALANCING REPORT FOR EVALUATION (BY
TENANT'S CONTRACTOR).
C
SIGNAGE 13. THIS CONTRACTOR SHOULD COORDINATE HIS WORKS CLOSELY WITH THE WORKS OF OTHER TRADES.PROVISION FOT THE PIPE PASSAGES THRU WALLS SHALL BE COORDINATED IN
3.90 m 1.55 m 6.15 m
ADVANCE WITH THE BUILDING CONTRACTOR. FAILURE ON THE PART OF THIS PROVIDING THEM LATER AT HIS OWN EXPENSE.
11.60 m 14. ALL PIPING PASSING ABOVE THE CEILING LEVEL SHOULD BE PROPERLY BRACKETED. SANDREALEE SALON
15. P-TRAP IS NEEDED FOR CONDENSATE DRAIN PIPE.
REVISIONS
DOCUMENT TYPE
SHEET NUMBER
DRAWN BY: BRB
SCALE: AS SHOWN
M-001
CHECKED BY: BRB