Vous êtes sur la page 1sur 1

Aras Pelarasan (m)

Aras terlaras: 57.976 m


60 60
BH 5 Aras terlaras: 55.998 m Aras terlaras: 56.363 m
Dalam (m) Litologi SPT
0
0.5 BH 2 BH 4
1.0 LEMPUNG Dalam (m) Litologi
Dalam (m) Litologi SPT PETUNJUK
1.5 SPT
berpasir 0
0
2.0 6
0.5
LEMPUNG 0.5 LEMPUNG
2.5
3.0 1.0 berkelikir 1.0 Major / Minor
3.5 9 1.5
1.5 LODAK
4.0 LODAK 2.0 9 LODAK 2.0 8
berpasir
2.5
4.5
berpasir 2.5 berpasir 3.0 Lempung
5.0 13 3.0 18
5.5 3.5 LEMPUNG
3.5 LEMPUNG
4.0
4.0
6.0 LODAK 4.5
4.5
PASIR
6.5 5.0
7.0 berkelikir 5.0 20 5.5 berlodak Pasir
50 7.5
8.0
8.5
14 LODAK
5.5
6.0
6.5 29 LODAK
6.0
6.5
7.0
50 LEMPUNG 50
9.0 7.0 7.5
Lodak
9.5 15 7.5
8.0 50
LODAK
10.0 LEMPUNG 8.0 50 8.5 berpasir
8.5
10.5 berpasir 9.0
9.0
Kelikir
11.0 12 9.5 50
11.5 9.5 50 LODAK 10.0
12.0
LODAK
10.0
berpasir 10.5 LEMPUNG
12.5 10.5 50 11.0 50 berpasir
13.0 berpasir 11.0 RQD = 0% BATU PASIR 11.5 Batu Pasir
13.5 11.5 12.0 50
14.0 26 12.0 LODAK
12.5 50
14.5
13.0
berkelikir
15.0
15.5 50 13.69 50 LODAK
16.0
16.5
17.0 50 PASIR
40
17.5
18.0
18.5 50
berlodak 40
19.0
19.5
20.0 50
20.5
21.21 50

Vous aimerez peut-être aussi