Layer Frigg trip margin 0.

5
kick margi 0.5
top reservo 1721 mtvdss 5644.88 ft tvdss
bot reservo 2113 mtvdss 6930.64 ft tvdss Densitas s 8.5

water dept 100 m 328 ft tvdss gas gradien 0.13


sg gas 0.136
GOC 1737 Mtvdss 5697.36 ft tvdss gas density 1.13288
WOC 1758 Mtvdss 5766.24 ft tvdss
4644.48 6460 avg pore p 2585
drilling until 5756 ft tvdss or 6184 ftrkb tinggi rig 100ft asumsi jara 100
riser lengt 428 ft 328
pore press 0.468
drilling 5707 - 5756 ft tvdss EMW pore 9
6135 - 6184 ft tvdrkb
Hubbert Willys
Depth, ft r Pf, psi Gprf min, pGprf max, pPrf, psi/ft EMW Pf, pEMW Pf Ma
EMW Prf, EMW Prf-m
0
100
200
300
400
Seabed 428 189.176 0.645333 0.734 314.152 8.50 9.00 14.12 13.62
500 222.872 0.645333 0.734 367 8.57 9.07 14.12 13.62
600 269.672 0.645333 0.734 440.4 8.64 9.14 14.12 13.62
700 316.472 0.645333 0.734 513.8 8.69 9.19 14.12 13.62
Conductor 728 329.576 0.645333 0.734 534.35 8.71 9.21 14.12 0 500 1000 15
013.62
761 345.02 0.645333 0.734 558.57 8.72 9.22 14.12 13.62
800 363.272 0.645333 0.734 587.2 8.73 9.23 14.12 13.62
900 410.072 0.645333 0.734 660.6 8.76 9.26 14.12 100013.62
1000 456.872 0.645333 0.734 734 8.79 9.29 14.12 13.62
1100 503.672 0.645333 0.734 807.4 8.81 9.31 14.12 13.62
1200 550.472 0.645333 0.734 880.8 8.82 9.32 14.12 2000 13.62
1300 597.272 0.645333 0.734 954.2 8.84 9.34 14.12 13.62
1398 643.136 0.645333 0.734 1026.132 8.85 9.35 14.12 13.62
3000
Depth, f

1400 644.072 0.645333 0.734 1027.6 8.85 9.35 14.12 13.62


surface 1428 657.176 0.645333 0.734 1048.152 8.85 9.35 14.12 13.62
1500 690.872 0.645333 0.734 1101 8.86 9.36 14.12 400013.62
1600 737.672 0.645333 0.734 1174.4 8.87 9.37 14.12 13.62
1700 784.472 0.645333 0.734 1247.8 8.87 9.37 14.12 13.62
1800 831.272 0.645333 0.734 1321.2 8.88 9.38 14.12 5000 13.62
1900 878.072 0.645333 0.734 1394.6 8.89 9.39 14.12 13.62
2000 924.872 0.645333 0.734 1468 8.89 9.39 14.12 13.62
2100 971.672 0.645333 0.734 1541.4 8.90 9.40 14.12 6000 13.62
2200 1018.472 0.645333 0.734 1614.8 8.90 9.40 14.12 13.62
2284 1057.784 0.645333 0.734 1676.456 8.91 9.41 14.12 13.62
7000
2300 1065.272 0.645333 0.734 1688.2 8.91 9.41 14.12 13.62
6000

7000

2400 1112.072 0.645333 0.734 1761.6 8.91 9.41 14.12 13.62


2500 1158.872 0.645333 0.734 1835 8.91 9.41 14.12 13.62
2600 1205.672 0.645333 0.734 1908.4 8.92 9.42 14.12 13.62
2700 1252.472 0.645333 0.734 1981.8 8.92 9.42 14.12 13.62
2800 1299.272 0.645333 0.734 2055.2 8.92 9.42 14.12 13.62
2900 1346.072 0.645333 0.734 2128.6 8.93 9.43 14.12 13.62
3000 1392.872 0.645333 0.734 2202 8.93 9.43 14.12 13.62
3100 1439.672 0.645333 0.734 2275.4 8.93 9.43 14.12 13.62
3200 1486.472 0.645333 0.734 2348.8 8.93 9.43 14.12 13.62
3300 1533.272 0.645333 0.734 2422.2 8.94 9.44 14.12 13.62
3400 1580.072 0.645333 0.734 2495.6 8.94 9.44 14.12 13.62
3500 1626.872 0.645333 0.734 2569 8.94 9.44 14.12 13.62
3600 1673.672 0.645333 0.734 2642.4 8.94 9.44 14.12 13.62
3700 1720.472 0.645333 0.734 2715.8 8.94 9.44 14.12 13.62
3756 1746.68 0.645333 0.734 2756.904 8.94 9.44 14.12 13.62
3800 1767.272 0.645333 0.734 2789.2 8.94 9.44 14.12 13.62
3900 1814.072 0.645333 0.734 2862.6 8.95 9.45 14.12 13.62
4000 1860.872 0.645333 0.734 2936 8.95 9.45 14.12 13.62
4026 1873.04 0.645333 0.734 2955.084 8.95 9.45 14.12 13.62
Intermedia 4056 1887.08 0.645333 0.734 2977.104 8.95 9.45 14.12 13.62
4100 1907.672 0.645333 0.734 3009.4 8.95 9.45 14.12 13.62
4200 1954.472 0.645333 0.734 3082.8 8.95 9.45 14.12 13.62
4300 2001.272 0.645333 0.734 3156.2 8.95 9.45 14.12 13.62
4400 2048.072 0.645333 0.734 3229.6 8.95 9.45 14.12 13.62
4500 2094.872 0.645333 0.734 3303 8.95 9.45 14.12 13.62
4549 2117.804 0.645333 0.734 3338.966 8.95 9.45 14.12 13.62
4600 2141.672 0.645333 0.734 3376.4 8.95 9.45 14.12 13.62
4700 2188.472 0.645333 0.734 3449.8 8.95 9.45 14.12 13.62
4800 2235.272 0.645333 0.734 3523.2 8.96 9.46 14.12 13.62
4900 2282.072 0.645333 0.734 3596.6 8.96 9.46 14.12 13.62
5000 2328.872 0.645333 0.734 3670 8.96 9.46 14.12 13.62
5100 2375.672 0.645333 0.734 3743.4 8.96 9.46 14.12 13.62
5200 2422.472 0.645333 0.734 3816.8 8.96 9.46 14.12 13.62
5300 2469.272 0.645333 0.734 3890.2 8.96 9.46 14.12 13.62
5400 2516.072 0.645333 0.734 3963.6 8.96 9.46 14.12 13.62
5500 2562.872 0.645333 0.734 4037 8.96 9.46 14.12 13.62
5600 2609.672 0.645333 0.734 4110.4 8.96 9.46 14.12 13.62
5700 2656.472 0.645333 0.734 4183.8 8.96 9.46 14.12 13.62
5800 2703.272 0.645333 0.734 4257.2 8.96 9.46 14.12 13.62
5900 2750.072 0.645333 0.734 4330.6 8.96 9.46 14.12 13.62
6000 2796.872 0.645333 0.734 4404 8.96 9.46 14.12 13.62
6035 2813.252 0.645333 0.734 4429.69 8.96 9.46 14.12 13.62
6100 2843.672 0.645333 0.734 4477.4 8.96 9.46 14.12 13.62
Prouction 6135 2860.052 0.645333 0.734 4503.09 8.97 9.47 14.12 13.62
Liner comp 6184 2882.984 0.645333 0.734 4539.056 8.97 9.47 14.12 13.62
inject 6460 3012.152 0.645333 0.734 4741.64 8.97 9.47 14.12 13.62
ppg Bourg, p. 330 porosity decreation c 0.000085 ft-1
ppg densitas grain avg 2.6 gr/cc
surface porosity 0.41
ppg Bourg, p.249 normal pore fluid den 1.074 fgr/cc bourg, p.249

bar/10m Neal adam p. 117


Drive pipe 100 - 300 ft
ppg Structural 600-1000 ft
intermediasampek sebelum production
psi depth= 5608.8 ft liner 300-500 ft di atas prod shoe
m sea bead de 5280.8 ft prod dari intermediate sampek production zone
ft
psi/ft memakai tieback dari atas hingga bawah
ppg

Pf margin, Prf margin, psi Tubing 6035 ft

200.30 303.02
235.87 354.00
285.27 424.80 P vs Depth
334.67 495.60
0 500348.50
1000 1500
515.422000 2500 3000 3500 4000 4500 5000
0
364.81 538.79
384.07 566.40 Sea Bed 328 ft
1000 433.47 637.20
482.87 708.00
532.27 778.80
2000 581.67 849.60
631.07 920.40
679.48 989.78 Pf vs Depth
3000 Prf vs Depth
680.47 991.20
Pf Margin vs Depth
694.30 1011.02
Prf Margin vs Depth
4000 729.87 1062.00
779.27 1132.80
828.67 1203.60
5000 878.07 1274.40
927.47 1345.20
976.87 1416.00
6000 1026.27 1486.80
1075.67 1557.60
1117.17 1617.07
7000
1125.07 1628.40
P, psi
6000

7000

1174.47 1699.20 P, psi


1223.87 1770.00
1273.27 1840.80
1322.67 1911.60
1372.07 1982.40
1421.47 2053.20
1470.87 2124.00
1520.27 2194.80
1569.67 2265.60
1619.07 2336.40
1668.47 2407.20
1717.87 2478.00
1767.27 2548.80
1816.67 2619.60
1844.34 2659.25
1866.07 2690.40
1915.47 2761.20
1964.87 2832.00
1977.72 2850.41
1992.54 2871.65
2014.27 2902.80
2063.67 2973.60
2113.07 3044.40
2162.47 3115.20
2211.87 3186.00
2236.08 3220.69
2261.27 3256.80
2310.67 3327.60
2360.07 3398.40
2409.47 3469.20
2458.87 3540.00
2508.27 3610.80
2557.67 3681.60
2607.07 3752.40
2656.47 3823.20
2705.87 3894.00
2755.27 3964.80
2804.67 4035.60
2854.07 4106.40
2903.47 4177.20
2952.87 4248.00
2970.16 4272.78
3002.27 4318.80
3019.56 4343.58
3043.77 4378.27
3180.11 4573.68
k production zone
Trayek Depth, ft TVD EMW, ppg
Conductor 428 - 728 -
Surface 428 - 1428 9.35
Intermediate 428 - 4056 9.45
Production liner 428 - 6135 9.47
Screen Liner 6135 6184 9.47

Trayek Conductor Surface IntermediaProductionscreen liner


Bit Size hammered 17 1/2 12 1/4 8 1/2 6 1/8
OD casing, inch 20 13 5/8 9 5/8 7 5
ID casing, inch 19.124 12.715 8.921 6.456 4.494

Volume. Bbl - 710.72 877.84 645.64 332.10

Trayek OD,inch Grade NW,ppf ID,inch Depth, tvdLength, ft


Conductor 20 H-40 94 19.124 428 - 728 300
Surface 13.375 H-40 48 12.715 428 - 1400 972
13.375 J-55 54.5 12.615 1400 - 142 28
Intermediate 9.625 H40 40 8.921 428 - 3989 3561
9.625 WC-50 40 8.835 3989 - 40 67
Production 7 J-55 20 6.456 428 - 6034 5606
7 L-80 23 6.366 6034 - 613 101
Liner 5 J-55 13 4.494 6135 - 618 49
Salt water base mud
Conductor Surface IntermediateProductionscreen liner
Mud Density (ppHammered 9.35 9.45 9.47 9.47
Plastic Viscosity Hammered 4.7 - 13.19 4.9 - 13.53 4.92 - 13.64.92 - 13.6
Yield Point (lb/1 Hammered 3.68 - 28.6 3.72 - 28.2 3.73 - 28.13.73 - 28.12
Solid Content (%Hammered 13.1 13.4 13.45 13.45
Additives Hammered barite, PAC-L, caubarite, PAC-Lbarite, PACbarite, PAC-L, caustic soda
function Hammered weighting agentsweighting agweighting weighting agents, FLCA, and p

Alternative A Alternative B
Removal and Onshore Leave in Place
Disposal

Predicted
number of
fatalities 0.01% 0%
(Potential Loss
of Life)

Probability of a <1% 0%
Fatality

Predicted
number of
major injuries 0.30% 0%
(Potential
Major Injuries)

Probability of a 26% 0%
Major Injury

Alternative A Remove and Alternative B Leave in Place


Energy Consumpt 65 0
Energy Balance 65 0
CO2 Emissions ( 4.5 0
Discharges to sesmall negative small negative
Physical impact none/insignificant none/insignificant
Aestethic Impacnone/insignificant none/insignificant
Material Managsmall negative none/insignificant
Littering none/insignificant none/insignificant
Impacts on fishenone/insignificant none/insignificant
Impacts on free none/insignificant none/insignificant
screen liner

4.92 - 13.6
3.73 - 28.12

barite, PAC-L, caustic soda


weighting agents, FLCA, and pH and rehology control
Trayek Depth, ft TVD EMW, ppg
Conductor 428 - 728 -
Surface 428 - 1428 9.35
Intermediate 428 - 4056 9.45
Production liner 428 - 6135 9.47
Screen Liner 6135 6184 9.47

Diameter Casing 20 inch


Depth 728 ft TVD
Lc 300 ft
Gas gradient 0.13 bar/10m 1 bar/10m 0.442 psi/ft
0.05746 psi/ft

Trayek Conductor
Bit Size, inch hammered Depth, ft EMW Pf, pPb, psi Pb design,
Casing Size, inch 20 428 189.176 273.936 364.3349
Depth, ft 728 500 222.872 264.576 351.8861
Length 300 600 269.672 251.576 334.5961
EMW - 700 316.472 238.576 317.3061
delta P - 728 329.576 234.936 312.4649
terjadi differential p -
Gpf at shoe 0.452714 psi/ft
Pc, psi -
Pb, psi 287.75
Grade H-40 Conductor Casing
NW, ppf 94 200 400 600 800 1000 1200 1
0
Drift diameter, inch 18.936
ID, inch 19.124 100
IYP, psi 1530 200
300
Depth, f

MCR, psi 520


JS, STC, lbs 581000 400
Tension Load, psi 28200 500
SFc >1 - 600
SFb >1,33 5.32 700
SFt >2 20.60 800
P, psi
SF
Collapse 1.125
Burst 1.33
Axial 2

Pb Gf.D - (Gs . D)
Pc Phmud
Tension BTC

IYP H40 94ppf


1530
1530
1530
1530
1530

Conductor Casing Selection


00 600 800 1000 1200 1400 1600

Pb design
IYP H40 94ppf

P, psi
Trayek Depth, ft TVD EMW, ppg
Conductor 428 - 728 -
Surface 428 - 1428 9.35
Intermediate 428 - 4056 9.45
Production liner 428 - 6135 9.47
Screen Liner 6135 6184 9.47

Diameter Casing 13 3/8 inch


Depth 1428 ft TVD
Lc 1000 ft TVD
Gas gradient 0.13 bar/10m 1 bar/10m = 0.442
0.05746 psi/ft
Gf 0.4862 psi/ft

Burst Load Collapse Load


Pb@surface 657.176 psi Pc@surface 0
Pb@shoe 575.1231 psi Pc@shoe 694.30

Pb@surface design 874.0441 psi Pc@surface design 0


Pb@shoe design 764.9137 psi Pc@shoe design 781.092

Depth, ft Mud EMW,EMW Pf, pPb, psi Pb design, psi Pc, psi
428 9.35 8.5 632.58 841.34 208.09
500 9.35 8.57 628.45 835.83 243.10
600 9.35 8.64 622.70 828.19 291.72
700 9.35 8.69 616.95 820.55 340.34
728 9.35 8.71 615.35 818.41 353.95
800 9.35 8.73 611.21 812.91 388.96
900 9.35 8.76 605.46 805.26 437.58
1000 9.35 8.79 599.72 797.62 486.20
1100 9.35 8.81 593.97 789.98 534.82
1200 9.35 8.82 588.22 782.34 583.44
1300 9.35 8.84 582.48 774.70 632.06
1400 9.35 8.85 576.73 767.05 680.68
1428 9.35 8.85 575.12 764.91 694.29

Casing Grade
grade H40 until 1400f C point
length 972 ft
IYP 1730 psi
SF Designed 1.33
Nominal Weight, ppf 48 ppf
Tension Load 46656 lbs
JS STC, lbs 322000 lbs
SF Real 6.90
SF Designed 2
OD 13 3/8 inch
ID 12.715 inch

grade J55 until 1428f


length 28 ft
MCR 1130 psi
SF Designed 1.125
Nominal Weight, ppf 54.5 ppf
Tension Load 1526 lbs
JS BTC, lbs 514000 lbs
SF Tension Real 336.8283
SF Tension Designed 2
OD 13 3/8 inch
ID 12.615 inch
SF Burst Load
Collapse 1.125 at surface Gf x D psi
Burst 1.33 at shoe Gf x D - ga psi
Axial 2
burst design
Pb Gf.D - (Gs . D) at surface Load x SF psi
Pc Phmud at shoe Load x SF psi
Tension BTC

psi/ft

psi
psi

psi
psi

Pc design, IYP H40 48IYP J55 54 IYP K55 54PC H40 48 PC J55 54. PC K55 54.5 ppf
234.11 1730 2730 2730
273.49 1730 2730 2730
328.19 1730 2730 2730
382.88 1730 2730 2730
398.20 1730 2730 2730
437.58 1730 2730 2730
492.28 1730 2730 2730
546.98 1730 2730 2730
601.67 1730 2730 2730
656.37 1730 2730 2730
711.07 1730 2730 2730
765.77 1730 2730 2730 740 1130 1130
781.08 1730 2730 2730 740 1130 1130

C point in1400ft depth


1400 ft
Surface Casing Selection
0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00
0

0
20

0
40 depth vs Pb design
Depth vs Pc design
IYP H40 48ppf
0
60 IYP K55 54.5ppf
D, Depth

IYP J55 54.5 ppf


MCR H40 48ppf
0
80 MCR K55 54.5ppf
MCR J55 54.5 ppf

00
10

00
12

00
14 C

P,psi
Collapse Load
at surface 0 psi
at shoe Ph mud psi

Depth, ft Tension LoaTension LoJS J55 54.5JS K55 54.5ppf


1428 0 0 514000 547000
1400 42728 85456 514000 547000

0 200000 400000 600000


1385
1390
1395
1400
Tension Load K55 and J55
1405 Surface Casing
1410 JS LTC J55 54.5ppf
JS LTC K55 54.5 ppf
1415
1420
1425
1430
1435
depth vs Pb design
Depth vs Pc design
IYP H40 48ppf
IYP K55 54.5ppf
IYP J55 54.5 ppf
MCR H40 48ppf
MCR K55 54.5ppf
MCR J55 54.5 ppf
Trayek Depth, ft TVD EMW, ppg
Conductor 428 - 728 -
Surface 428 - 1428 9.35
Intermedia 428 - 4056 9.45
Production 428 - 6135 9.47
Screen Lin 6135 6184 9.47

Diameter C 9 5/8 inch


Depth 4056 ft TVD
Lc 3628 ft TVD
Gas gradie 0.13 bar/10m 1 bar/10m 0.442 psi/ft
0.05746 psi/ft
Gf 0.491256 psi/ft

Burst Load Collapse Load


Pb@surface 1887.08 psi Pc@surface 0 psi
Pb@shoe 1654.022 psi Pc@shoe 1992.536 psi

Pb@surface2509.816
design psi Pc@surface design 0 psi
Pb@shoe design
2199.85 psi Pc@shoe design
2241.603 psi

Depth, ft Mud EMW,EMW Pf, pPb, psi Pb design, Pc, psi Pc design, IYP H40 36IYP J55 36
428 9.45 8.50 1862.49 2477.11 210.26 236.54 2560 3520
500 9.45 8.57 1858.35 2471.61 245.63 276.33 2560 3520
600 9.45 8.64 1852.60 2463.96 294.75 331.60 2560 3520
700 9.45 8.69 1846.86 2456.32 343.88 386.86 2560 3520
728 9.45 8.71 1845.25 2454.18 357.63 402.34 2560 3520
800 9.45 8.73 1841.11 2448.68 393.01 442.13 2560 3520
900 9.45 8.76 1835.37 2441.04 442.13 497.40 2560 3520
1000 9.45 8.79 1829.62 2433.39 491.26 552.66 2560 3520
1100 9.45 8.81 1823.87 2425.75 540.38 607.93 2560 3520
1200 9.45 8.82 1818.13 2418.11 589.51 663.20 2560 3520
1300 9.45 8.84 1812.38 2410.47 638.63 718.46 2560 3520
1400 9.45 8.85 1806.64 2402.83 687.76 773.73 2560 3520
1428 9.45 8.85 1805.03 2400.69 701.51 789.20 2560 3520
1500 9.45 8.86 1800.89 2395.18 736.88 829.00 2560 3520
1600 9.45 8.87 1795.14 2387.54 786.01 884.26 2560 3520
1700 9.45 8.87 1789.40 2379.90 835.14 939.53 2560 3520
1800 9.45 8.88 1783.65 2372.26 884.26 994.79 2560 3520
1900 9.45 8.89 1777.91 2364.61 933.39 1050.06 2560 3520
2000 9.45 8.89 1772.16 2356.97 982.51 1105.33 2560 3520
2100 9.45 8.90 1766.41 2349.33 1031.64 1160.59 2560 3520
2200 9.45 8.90 1760.67 2341.69 1080.76 1215.86 2560 3520
2300 9.45 8.91 1754.92 2334.05 1129.89 1271.13 2560 3520
2400 9.45 8.91 1749.18 2326.40 1179.02 1326.39 2560 3520
2500 9.45 8.91 1743.43 2318.76 1228.14 1381.66 2560 3520
2600 9.45 8.92 1737.68 2311.12 1277.27 1436.93 2560 3520
2700 9.45 8.92 1731.94 2303.48 1326.39 1492.19 2560 3520
2800 9.45 8.92 1726.19 2295.84 1375.52 1547.46 2560 3520
2900 9.45 8.93 1720.45 2288.19 1424.64 1602.72 2560 3520
3000 9.45 8.93 1714.70 2280.55 1473.77 1657.99 2560 3520
3100 9.45 8.93 1708.95 2272.91 1522.89 1713.26 2560 3520
3200 9.45 8.93 1703.21 2265.27 1572.02 1768.52 2560 3520
3300 9.45 8.94 1697.46 2257.62 1621.15 1823.79 2560 3520
3400 9.45 8.94 1691.72 2249.98 1670.27 1879.06 2560 3520
3500 9.45 8.94 1685.97 2242.34 1719.40 1934.32 2560 3520
3600 9.45 8.94 1680.22 2234.70 1768.52 1989.59 2560 3520
3700 9.45 8.94 1674.48 2227.06 1817.65 2044.85 2560 3520
3756 9.45 8.94 1671.26 2222.78 1845.16 2075.80 2560 3520
3800 9.45 8.94 1668.73 2219.41 1866.77 2100.12 2560 3520
3900 9.45 8.95 1662.99 2211.77 1915.90 2155.39 2560 3520
3989 9.45 8.95 1657.87 2204.97 1959.62 2204.57 2560 3520
4000 9.45 8.95 1657.24 2204.13 1965.03 2210.65
4056 9.45 8.95 1654.02 2199.85 1992.54 2241.60

Casing Grade
Grade H40 until 3989 f
length 3561 ft
IYP 2560 psi
SF Designe 1.33
NW 40 ppf
Tension lo 142440 lbs
JS STC,lbs 294000 lbs
SF Tension 2.06
SF Tension 2
OD 9 5/8 inch
ID 8.921 inch

Grade WC50 3989 f - 4056


length 67
MCR 2480
SF Pc desi 1.125
SF Pc real 1.245
NW 40 ppf
Tension lo 2680 lbs
JS STC 414000 lbs
SF Tension 154.4776
SF Tension 2
OD 9 5/8 inch
ID 8.835 inch
SF Burst Load
Collapse 1.125 at surface Gf x D psi
Burst 1.33 at shoe Gf x D - ga psi
Axial 2
burst design
Pb Gf.D - (Gs . D) at surface Load x SF psi
Pc Phmud at shoe Load x SF psi
Tension BTC

Critical Poi 3989 ft

MCR J55 4MCR WC50 40ppf

Intermediate Casing Selection


0.00 1000.00 2000.00 3000.00 4000.00
0
500
Pb Design
1000
Pc Design
1500
IYP H40 36ppf
Depth, f

2000
IYP J55 36ppf
2500 MCR J55 40 ppf
3000 MCR 2C50 40ppf
3500
4000
4500 C

P, psi
2570 2480
2570 2480
Collapse Load
at surface 0 psi
at shoe Ph mud psi
Trayek Depth, ft TVD EMW, ppg
Conductor 428 - 728 -
Surface 428 - 1428 9.36
Intermedia 428 - 4056 9.45
Production 428 - 6135 9.47
Screen Lin 6135 6184 9.47

Diameter C 7 inch
Depth 6135 ft TVD
Lc 5707 ft TVD
Gas gradie 0.13 bar/10m 1 bar/10m 0.442 psi/ft
0.05746 psi/ft
Gf 0.49244 psi/ft

Burst Load Collapse Load


Pb@surface2860.052 psi Pc@surface 0 psi
Pb@shoe 2507.535 psi Pc@shoe 3014.039 psi

Pb@surface3803.869
design psi Pc@surface design 0 psi
Pb@shoe design
3335.021 psi Pc@shoe design
3390.794 psi

J-55 and K-55 Production Casing


Depth, ft Mud EMW,EMW Pf, pPb, psi Pb design,
0 Pc, psi
100000 Pc design,300000
200000 IYP J55 20 IYP K55 20
3500
3756 9.47 8.94 2644.23 3516.829 1849.605 2080.805 3740 3740
3800 9.47 8.94 2641.70 3513.466 1871.272 2105.181
4000 3740 3740
3900 9.47 8.95 2635.96 4500
3505.824 1920.516 2160.581 3740 Tension
3740 Load J55 and K55
Production Casing
Depth, f

4000 9.47 8.95 2630.21 3498.182 1969.76 2215.98 3740 3740


5000 JS LTC J55 20ppf
4056 9.47 8.95 2626.99 3493.902 1997.337 2247.004 3740 3740
JS LTC K55 20lppf
4100 9.47 8.95 2624.47 5500
3490.54 2019.004 2271.38 3740 3740
4200 9.47 8.95 2618.72 3482.898 2068.248 2326.779 3740 3740
6000
4300 9.47 8.95 2612.97 3475.255 2117.492 2382.179 3740 3740
4400 9.47 6500
8.95 2607.23 3467.613 2166.736 2437.578 3740 3740
4500 9.47 8.95 2601.48 3459.971 Tension
2215.98 2492.978
Load, lbs 3740 3740
4600 9.47 8.95 2595.74 3452.329 2265.224 2548.377 3740 3740
4700 9.47 8.95 2589.99 3444.687 2314.468 2603.777 3740 3740
4800 9.47 8.96 2584.24 3437.045 2363.712 2659.176 3740 3740
4900 9.47 8.96 2578.50 3429.402 2412.956 2714.576 3740 3740
5000 9.47 8.96 2572.75 3421.76 2462.2 2769.975 3740 3740
5100 9.47 8.96 2567.01 3414.118 2511.444 2825.375 3740 3740
5200 9.47 8.96 2561.26 3406.476 2560.688 2880.774 3740 3740
5300 9.47 8.96 2555.51 3398.834 2609.932 2936.174 3740 3740
5400 9.47 8.96 2549.77 3391.191 2659.176 2991.573 3740 3740
5500 9.47 8.96 2544.02 3383.549 2708.42 3046.973 3740 3740
5600 9.47 8.96 2538.28 3375.907 2757.664 3102.372 3740 3740
5700 9.47 8.96 2532.53 3368.265 2806.908 3157.772 3740 3740
5800 9.47 8.96 2526.78 3360.623 2856.152 3213.171 3740 3740
5900 9.47 8.96 2521.04 3352.981 2905.396 3268.571 3740 3740
6000 9.47 8.96 2515.29 3345.338 2954.64 3323.97 3740 3740
6034 9.47 8.96 2513.34 3342.74 2971.383 3342.806 3740 3740
6035 9.47 8.96 2513.28 3342.664 2971.875 3343.36
6100 9.47 8.96 2509.55 3337.696 3003.884 3379.37
6135 9.47 8.97 2507.53 3335.021 3021.119 3398.759

Casing Grade Grade L80 6034 - 6135


Grade J55 until 6034 f length 101
length 5606 ft MCR 3830
IYP 3740 psi SF Pc desi 1.125
SF Designe 1.33 SF Pc real 1.127
NW 20 ppf NW 23 ppf
Tension lo 112120 lbs Tension lo 2323 lbs
JS LTC,lbs 257000 lbs JS, LTC 435000 lbs
SF Tension 2.29 SF Tension 187.2579
SF Tension 2 SF Tension 2
OD 7 inch OD 7 inch
ID 6.456 inch ID 6.366 inch
SF Burst Load Collapse Load
Collapse 1.125 at surface Gf x D psi at surface
Burst 1.33 at shoe Gf x D - ga psi at shoe
Axial 2
burst design
Pb Gf.D - (Gs . D) at surface Load x SF psi
Pc Phmud at shoe Load x SF psi
Tension BTC

Critical Poi 6034 ft


Production Casing Selection
2000 2500 3000 3500 4000
3700

4200
Pb Design
4700 Pc Design
tion Casing
Depth, f

IYP J55 20ppf


5200
IYP K55 20ppf
MCR L80 23ppf
5700 MCR L80 23ppf

6200 C
Tension Load J55 and K55
6700
Production Casing
JS LTC J55 20ppf P, psi
JS LTC K55 20lppf

Depth Tension LoaTension LoaJS LTC J55 JS LTC K55 20 ppf, lbs
6135 0 0 257000 281000
6100 805 1610 257000 281000
6035 2300 4600 257000 281000
6034 2320 4640 257000 281000
6000 3000 6000 257000 281000
5900 5000 10000 257000 281000
5800 7000 14000 257000 281000
5700 9000 18000 257000 281000
5600 11000 22000 257000 281000
5500 13000 26000 257000 281000
5400 15000 30000 257000 281000
5300 17000 34000 257000 281000
5200 19000 38000 257000 281000
5100 21000 42000 257000 281000
5000 23000 46000 257000 281000
4900 25000 50000 257000 281000
4800 27000 54000 257000 281000
4700 29000 58000 257000 281000
3830 4600 31000 62000 257000 281000
3830 4500 33000 66000 257000 281000
3830 4400 35000 70000 257000 281000
4300 37000 74000 257000 281000
4200 39000 78000 257000 281000
4100 41000 82000 257000 281000
4056 41880 83760 257000 281000
4000 43000 86000 257000 281000
3900 45000 90000 257000 281000
3800 47000 94000 257000 281000
3756 47880 95760 257000 281000
Collapse Load
0 psi
Ph mud psi

Design
Design
P J55 20ppf
P K55 20ppf
CR L80 23ppf
Trayek Depth, ft TVD EMW, ppg
Conductor 428 - 728 -
Surface 428 - 1428 9.36
Intermedia 428 - 4056 9.45
Production 3756 - 6135 9.47
Screen Lin 6135 6184 9.47

Diameter C 5 inch
Depth 6184 ft TVD
Lc 49 ft TVD
Gas gradie 0.13 bar/10m 1 bar/10m 0.442 psi/ft
0.05746 psi/ft
Gf 0.49244 psi/ft

Burst Load Collapse Load


Pb@surface2882.984 psi Pc@surface 0 psi
Pb@shoe 2527.651 psi Pc@shoe 3045.249 psi

Pb@surface3834.369
design psi Pc@surface design 0 psi
Pb@shoe design
3361.776 psi Pc@shoe design
3425.905 psi

Depth, ft Mud EMW,EMW Pf, pPb, psi Pb design, Pc, psi Pc design, IYP J55 13 MCR J55 13ppf
6135 9.47 8.97 2530.467 3365.521 3021.119 3398.759 4870 4140
6184 9.47 8.97 2527.651 3361.776 3045.249 3425.905 4870 4140

Grade J55 13ppf


Nw 13 ppf
MCR 4140 psi
IYP 4870 psi
JS, LTC 182000 lbs
Casing Len 49
SF Pb actua1.924546
SF Pc actua1.359495
SF Burst Load Collapse Load
Collapse 1.125 at surface Gf x D psi at surface
Burst 1.33 at shoe Gf x D - ga psi at shoe
Axial 2
burst design
Pb Gf.D - (Gs . D) at surface Load x SF psi
Pc Phmud at shoe Load x SF psi
Tension BTC

Critical Point ft

Liner Selection
3300 3800 4300 4800 5300
6110
6120
6130 Pb design
MCR J55 13ppf
6140 Pc Design
Depth, f

6150 IYP J55 13 ppf


6160 MCR J55 13 ppf
6170
6180
6190
P, psi
Collapse Load
0
Ph mud
Traject OD,inch Grade NW,ppf ID,inch Depth, tvdrkb Length, ft
Conductor 20 H-40 94 19.124 428 - 728 300
Surface 13 3/8 H-40 48 12.715 428 - 1400 972
13 3/8 J-55 54.5 12.615 1400 - 1428 28
Intermedia 9 5/8 H40 40 8.921 428 - 3989 3561
9 5/8 WC-50 40 8.835 3989 - 4056 67
Production 7 J-55 20 6.456 428 - 6034 5606
7 L-80 23 6.366 6034 - 6135 101
Liner 5 J-55 13 4.494 6135 - 6184 49
Depth, ft r Pf, psi Gprf min, pGprf max, pPrf, psi/ft EMW Pf, pEMW Pf Ma
EMW Prf,
Seabed 428 189.176 0.645333 0.734 314.152 8.5 9 14.11538
500.00 222.87 0.65 0.73 367.00 8.57 9.07 14.12
600.00 269.67 0.65 0.73 440.40 8.64 9.14 14.12
700.00 316.47 0.65 0.73 513.80 8.69 9.19 14.12
Conductor 728.00 329.58 0.65 0.73 534.35 8.71 9.21 14.12
761.00 345.02 0.65 0.73 558.57 8.72 9.22 14.12
800.00 363.27 0.65 0.73 587.20 8.73 9.23 14.12
900.00 410.07 0.65 0.73 660.60 8.76 9.26 14.12
1000.00 456.87 0.65 0.73 734.00 8.79 9.29 14.12
1100.00 503.67 0.65 0.73 807.40 8.81 9.31 14.12
1200.00 550.47 0.65 0.73 880.80 8.82 9.32 14.12
1300.00 597.27 0.65 0.73 954.20 8.84 9.34 14.12
1398.00 643.14 0.65 0.73 1026.13 8.85 9.35 14.12
1400.00 644.07 0.65 0.73 1027.60 8.85 9.35 14.12
surface 1428.00 657.18 0.65 0.73 1048.15 8.85 9.35 14.12
1500.00 690.87 0.65 0.73 1101.00 8.86 9.36 14.12
1600.00 737.67 0.65 0.73 1174.40 8.87 9.37 14.12
1700.00 784.47 0.65 0.73 1247.80 8.87 9.37 14.12
1800.00 831.27 0.65 0.73 1321.20 8.88 9.38 14.12
1900.00 878.07 0.65 0.73 1394.60 8.89 9.39 14.12
2000.00 924.87 0.65 0.73 1468.00 8.89 9.39 14.12
2100.00 971.67 0.65 0.73 1541.40 8.90 9.40 14.12
2200.00 1018.47 0.65 0.73 1614.80 8.90 9.40 14.12
2284.00 1057.78 0.65 0.73 1676.46 8.91 9.41 14.12
2300.00 1065.27 0.65 0.73 1688.20 8.91 9.41 14.12
2400.00 1112.07 0.65 0.73 1761.60 8.91 9.41 14.12
2500.00 1158.87 0.65 0.73 1835.00 8.91 9.41 14.12
2600.00 1205.67 0.65 0.73 1908.40 8.92 9.42 14.12
2700.00 1252.47 0.65 0.73 1981.80 8.92 9.42 14.12
2800.00 1299.27 0.65 0.73 2055.20 8.92 9.42 14.12
2900.00 1346.07 0.65 0.73 2128.60 8.93 9.43 14.12
3000.00 1392.87 0.65 0.73 2202.00 8.93 9.43 14.12
3100.00 1439.67 0.65 0.73 2275.40 8.93 9.43 14.12
3200.00 1486.47 0.65 0.73 2348.80 8.93 9.43 14.12
3300.00 1533.27 0.65 0.73 2422.20 8.94 9.44 14.12
3400.00 1580.07 0.65 0.73 2495.60 8.94 9.44 14.12
3500.00 1626.87 0.65 0.73 2569.00 8.94 9.44 14.12
3600.00 1673.67 0.65 0.73 2642.40 8.94 9.44 14.12
3700.00 1720.47 0.65 0.73 2715.80 8.94 9.44 14.12
3756.00 1746.68 0.65 0.73 2756.90 8.94 9.44 14.12
3800.00 1767.27 0.65 0.73 2789.20 8.94 9.44 14.12
3900.00 1814.07 0.65 0.73 2862.60 8.95 9.45 14.12
4000.00 1860.87 0.65 0.73 2936.00 8.95 9.45 14.12
4026.00 1873.04 0.65 0.73 2955.08 8.95 9.45 14.12
Intermedia 4056.00 1887.08 0.65 0.73 2977.10 8.95 9.45 14.12
4100.00 1907.67 0.65 0.73 3009.40 8.95 9.45 14.12
4200.00 1954.47 0.65 0.73 3082.80 8.95 9.45 14.12
4300.00 2001.27 0.65 0.73 3156.20 8.95 9.45 14.12
4400.00 2048.07 0.65 0.73 3229.60 8.95 9.45 14.12
4500.00 2094.87 0.65 0.73 3303.00 8.95 9.45 14.12
4549.00 2117.80 0.65 0.73 3338.97 8.95 9.45 14.12
4600.00 2141.67 0.65 0.73 3376.40 8.95 9.45 14.12
4700.00 2188.47 0.65 0.73 3449.80 8.95 9.45 14.12
4800.00 2235.27 0.65 0.73 3523.20 8.96 9.46 14.12
4900.00 2282.07 0.65 0.73 3596.60 8.96 9.46 14.12
5000.00 2328.87 0.65 0.73 3670.00 8.96 9.46 14.12
5100.00 2375.67 0.65 0.73 3743.40 8.96 9.46 14.12
5200.00 2422.47 0.65 0.73 3816.80 8.96 9.46 14.12
5300.00 2469.27 0.65 0.73 3890.20 8.96 9.46 14.12
5400.00 2516.07 0.65 0.73 3963.60 8.96 9.46 14.12
5500.00 2562.87 0.65 0.73 4037.00 8.96 9.46 14.12
5600.00 2609.67 0.65 0.73 4110.40 8.96 9.46 14.12
5700.00 2656.47 0.65 0.73 4183.80 8.96 9.46 14.12
5800.00 2703.27 0.65 0.73 4257.20 8.96 9.46 14.12
5900.00 2750.07 0.65 0.73 4330.60 8.96 9.46 14.12
6000.00 2796.87 0.65 0.73 4404.00 8.96 9.46 14.12
6035 2813.252 0.645333 0.734 4429.69 8.96454 9.46454 14.11538
6100 2843.672 0.645333 0.734 4477.4 8.964918 9.464918 14.11538
Prouction 6135 2860.052 0.645333 0.734 4503.09 8.965118 9.465118 14.11538
Liner comp 6184 2882.984 0.645333 0.734 4539.056 8.965395 9.465395 14.11538
EMW Prf-mPf margin, Prf margin, psi
13.61538 200.304 303.024
13.62 235.87 354.00 Trayek Depth, ft TVD EMW, ppg
13.62 285.27 424.80 Conductor 428 - 728 -
13.62 334.67 495.60 Surface 428 - 1428 9.36
13.62 348.50 515.42 Intermediate 428 - 4056 9.45
13.62 364.81 538.79 Production liner 428 - 6135 9.47
13.62 384.07 566.40 Screen Liner 6135 6184 9.47
13.62 433.47 637.20
13.62 482.87 708.00
13.62 532.27 778.80 SEMEN
13.62 581.67 849.60 Casing Section ConductorSurface
13.62 631.07 920.40 Bit Size Hammered 17 1/2
13.62 679.48 989.78 OD casing, inch 20.00 13 3/8
13.62 680.47 991.20 ID casing, inch 19.124 12.715
13.62 694.30 1011.02 1 Casing Length, ft 300 972
13.62 729.87 1062.00 OD casing, inch - 13 3/8
13.62 779.27 1132.80 ID casing, inch - 12.615
13.62 828.67 1203.60 2 Casing Length, ft - 28
13.62 878.07 1274.40 Cement Class - G
13.62 927.47 1345.20 Cemeng Column Heigh - 1000
13.62 976.87 1416.00 Open Hole Height, ft- 700
13.62 1026.27 1486.80 Casing to Casing Heig- 300
13.62 1075.67 1557.60 Lead Height, ft - 333.33
13.62 1117.17 1617.07 Tail height, ft - 666.67
13.62 1125.07 1628.40 Spacer Height, ft - 42
13.62 1174.47 1699.20 Mud Height, ft - 386
13.62 1223.87 1770.00 Prf at shoe, psi 538.79 991.20
13.62 1273.27 1840.80 Column Volume, bbl- 400.18
13.62 1322.67 1911.60 Lead Volume, bbl - 133.39
13.62 1372.07 1982.40 Tail Volume, bbl - 266.79
13.62 1421.47 2053.20 Lead Density, ppg - 14.55
13.62 1470.87 2124.00 Tail Density, ppg - 16.05
13.62 1520.27 2194.80 Spacer Density, ppg - 10
13.62 1569.67 2265.60 Mud Density, ppg - 9.36
13.62 1619.07 2336.40
13.62 1668.47 2407.20
13.62 1717.87 2478.00
13.62 1767.27 2548.80
13.62 1816.67 2619.60
13.62 1844.34 2659.25
13.62 1866.07 2690.40
13.62 1915.47 2761.20
13.62 1964.87 2832.00
13.62 1977.72 2850.41
13.62 1992.54 2871.65
13.62 2014.27 2902.80
13.62 2063.67 2973.60
13.62 2113.07 3044.40
13.62 2162.47 3115.20
13.62 2211.87 3186.00
13.62 2236.08 3220.69
13.62 2261.27 3256.80
13.62 2310.67 3327.60
13.62 2360.07 3398.40
13.62 2409.47 3469.20
13.62 2458.87 3540.00
13.62 2508.27 3610.80
13.62 2557.67 3681.60
13.62 2607.07 3752.40
13.62 2656.47 3823.20
13.62 2705.87 3894.00
13.62 2755.27 3964.80
13.62 2804.67 4035.60
13.62 2854.07 4106.40
13.62 2903.47 4177.20
13.62 2952.87 4248.00
13.61538 2970.162 4272.78
13.61538 3002.272 4318.8
13.61538 3019.562 4343.58
13.61538 3043.768 4378.272
Trayek OD,inch ID,inch Length, ft
Conductor 20 19.124 300
EMW, ppg Surface 13 3/8 12.715 972
13 3/8 12.615 28
Intermedia 9 5/8 8.921 3561
9 5/8 8.835 67
Production 7 6.456 2278
7 6.366 101
Liner 5 4.494 49

IntermediaProductionLiner Unit Conductor


12 1/4 8 1/2 Depth Casing 1 728
9 5/8 7 5 Depth Casing 2
8.921 6.456 4.494
3561 2278 49
9 5/8 7- ConductorSurface
8.835 6.366 - TOC - 428
67 101 - Kedalaman Lead - 761.33
G G - Kedalaman Tail - 1428.00
2658 2109 wont be cemmented
2628 2079 -
30 3628 -
886.00 703 -
1772 1406 -
42 42 -
1356.00 3984.00 -
2761.20 4177.20 -
148.45 203.68 -
49.48 67.89 -
98.97 135.79 -
13 15.09 -
14.5 18.09 -
10.5 10.6 10.8
9.45 9.47 9.47
Surface IntermediaProd Liner Liner
1400 3989 2706 6184
1428 4017 2807

IntermediaProd Liner Liner


1398 4026 -
2284.00 4729.00 -
4056.00 6135.00 -
Depth, ft r Pf, psi Pf margin, Ph Lead, psPh Tail, PsiPrf, psi
Seabed 428 189.176 200.304 209.66 303.024 Casing
500 222.87 235.87 254.59 354.00
600 269.67 285.27 316.99 424.80 1
700 316.47 334.67 379.39 495.60
Conductor 728 329.58 348.50 396.86 515.42
761 345.02 364.81 417.45 417.45 538.79 2
800 363.27 384.07 444.83 566.40
900 410.07 433.47 515.03 637.20
1000 456.87 482.87 585.23 708.00
1100 503.67 532.27 655.43 778.80
1200 550.47 581.67 725.63 849.60
1300 597.27 631.07 795.83 920.40
1398 643.14 679.48 864.63 989.78
1400 644.07 680.47 866.03 991.20
surface 1428 657.18 694.30 689.12 885.69 1011.02
1500 690.87 729.87 737.79 1062.00
1600 737.67 779.27 805.39 1132.80
1700 784.47 828.67 872.99 1203.60
1800 831.27 878.07 940.59 1274.40
1900 878.07 927.47 1008.19 1345.20
2000 924.87 976.87 1075.79 1416.00
2100 971.67 1026.27 1143.39 1486.80
2200 1018.47 1075.67 1210.99 1557.60
2284 1057.78 1117.17 1267.77 1267.77 1617.07
2300 1065.27 1125.07 1279.84 1628.40
2400 1112.07 1174.47 1355.24 1699.20
2500 1158.87 1223.87 1430.64 1770.00
2600 1205.67 1273.27 1506.04 1840.80
2700 1252.47 1322.67 1581.44 1911.60
2800 1299.27 1372.07 1656.84 1982.40
2900 1346.07 1421.47 1732.24 2053.20
3000 1392.87 1470.87 1807.64 2124.00
3100 1439.67 1520.27 1883.04 2194.80
3200 1486.47 1569.67 1958.44 2265.60
3300 1533.27 1619.07 2033.84 2336.40
3400 1580.07 1668.47 2109.24 2407.20
3500 1626.87 1717.87 2184.64 2478.00
3600 1673.67 1767.27 2260.04 2548.80
3700 1720.47 1816.67 2335.44 2619.60
3756 1746.68 1844.34 2377.66 2659.25
3800 1767.27 1866.07 2410.84 2690.40
3900 1814.07 1915.47 2486.24 2761.20
4000 1860.87 1964.87 2561.64 2832.00
4026 1873.04 1977.72 2581.24 2850.41
Intermedia 4056 1887.08 1992.54 1985.03 2603.86 2871.65
4100 1907.67 2014.27 2022.99 2902.80
4200 1954.47 2063.67 2109.26 2973.60
4300 2001.27 2113.07 2195.53 3044.40
4400 2048.07 2162.47 2281.79 3115.20
4500 2094.87 2211.87 2368.06 3186.00
4549 2117.80 2236.08 2410.33 2410.33 3220.69
4600 2141.67 2261.27 2458.31 3256.80
4700 2188.47 2310.67 2552.38 3327.60
4800 2235.27 2360.07 2646.44 3398.40
4900 2282.07 2409.47 2740.51 3469.20
5000 2328.87 2458.87 2834.58 3540.00
5100 2375.67 2508.27 2928.65 3610.80
5200 2422.47 2557.67 3022.72 3681.60
5300 2469.27 2607.07 3116.78 3752.40
5400 2516.07 2656.47 3210.85 3823.20
5500 2562.87 2705.87 3304.92 3894.00
5600 2609.67 2755.27 3398.99 3964.80
5700 2656.47 2804.67 3493.06 4035.60
5800 2703.27 2854.07 3587.12 4106.40
5900 2750.07 2903.47 3681.19 4177.20
6000 2796.87 2952.87 3775.26 4248.00
6035 2813.252 2970.162 3808.18 4272.78
6100 2843.672 3002.272 3869.33 4318.8
Prouction 6135 2860.052 3019.562 3902.25 4343.58
Liner comp 6184 2882.984 3043.768 4378.272
SEMEN
Trayek ConductorSurface IntermediaProductionLiner
Bit Size Hammered 17 1/2 12 1/4 8 1/2
OD casing, inch 20.00 13 3/8 9 5/8 7 5
ID casing, inch 19.124 12.715 8.921 6.456 4.494
Casing Length, ft 300 972 3561 2278 49
OD casing, inch - 13 3/8 9 5/8 7-
ID casing, inch - 12.615 8.835 6.366 -
Casing Length, ft - 28 67 101 -
Kelas Semen - G G G -
Tinggi Kolom semen, ft 0 1000 2658 2109 wont be cemmented
Tinggi Open Hole, ft 0 700 2628 2079 -
Tinggi Casing-Casing, ft 0 300 30 3628 -
Tinggi Lead, ft 0 333.33 886.00 703 -
Tinggi Tail, ft 0 666.67 1772 1406 -
Tinggi Spacer, Ft 0 42 42 42 -
Tinggi Mud, Ft 0 386 1356.00 3984.00 -
Prf at shoe 538.79 991.20 2761.20 4177.20 -
Volume Kolom, bbl 0 400.18 148.45 203.68 -
Volume Lead, bbl 0 133.39 49.48 67.89 -
Volume Tail, bll 0 266.79 98.97 135.79 -
Densitas Lead, ppg 0 12 13 16.59 -
Densitas Tail, ppg 0 13.5 14.5 18.09 -
Densitas Spacer, ppg 0 10 10.5 10.6 10.8
Densitas mud, ppg 0 9.36 9.45 9.47 9.47

ConductorSurface IntermediaProd Liner Liner


TOC - 428 1398 4026 -
Kedalaman Lead - 761.3333 2284 4729 -
Kedalaman Tail - 1428 4056 6135 -

Pvs D
0 1000 2000 3000 4000 5000
0 Pf vs D
1000 Ph Mud vs D
Ph Lead Surface vs D
2000 Ph Tail Surface vs D
Depth, f

3000 Ph Lead Int vs D


4000 Ph Tail Int vs D
Ph Lead Prod vs D
5000
Ph Tail Prod vs D
6000 Prf vs D
7000
P, psi
Ph Lead Prod vs D
5000
Ph Tail Prod vs D
6000 Prf vs D
7000
P, psi
no Potensi Bahaya Pencegahan dan Penanggulangan
1 partial loss selama pemboran a. menggunakan lumpur yang mendekati Pf agar tidak terjadi diff
b. Menggunakan lumpur dengan margin yang sesuai dengan Pf a
c. Menambah excess volume semen sebesar 50%
d. Menggunakan LCM seperti nut shell
2 Swelling Clay a. Penambahan FLCA agar filtrat tidak berlebih dan bereaksi deng
b menggunakan lignosulfonate mud ataupun polymer mud
3 Ketidak stabilan lubang bor daa. menjaga filtrat loss pada lumpur
b. menggunakan lumpur yang mendekati Pf agar tidak terjadi diff
c. Back off opertaion: fishing (jika masih gagal, melakukan sidetra
4 total loss selama cementing j a. menggunakan SG semen rendah (SG 1,26)
b. Jaga dan selalu perhatikan parameter pemboran
c. Melakukan cement plug
5 kick a. mengontrol dan memperhatikan sifat fisik fluida pemboran ter
b. Segera menanggulangi loss dengan menambahkan lcm pada lu
c. Kegiatan menanggulangi kick, seperti:
1) menghentikan pemboran, angkat drillstring hingga di atas kelly
2) matikan pompa dan tutup BOP
3) catat SIDP dan SICP
4) cek kenaikan volume lumpur pada kolam lumpur
5) menyiapkan lumpur berat untuk dipompakan untuk penanggu
6 Cementing problem (Micro annu a. controlling free water in when designing cement so the free w
7 casing problem (Collapse, burst
b. Designing the proper casing to be used based on the pressure
8 surface problem a. broken pump
1) designing the mud system or cement system properly (especia
b. Overheat
Pf agar tidak terjadi differential pressure yang besar
yang sesuai dengan Pf agar tidak merekahkan formasi

lebih dan bereaksi dengan clay


pun polymer mud

Pf agar tidak terjadi differential pressure yang besar


agal, melakukan sidetrack)

fisik fluida pemboran terutama densitas agar tidak berada di bawah tekanan formasi
nambahkan lcm pada lumpur ataupun cement plug

tring hingga di atas kelly

mpakan untuk penanggulangan kick


g cement so the free water wont break the free water limit (3.5 ml free water in 250ml cement suspension)
based on the pressure and load that the casing hold

ystem properly (especially in density and rheology), so the mud or cement system wont overload the pump capacity
Bit Program
Size, inch IADC Bit Type Additional Information
20 - - Hammered
17 1/2 1,2,1 Roller Cone (mill steel tooth) Drilled, Cemented
12 1/4 1,2,5 Roller Cone (mill steel tooth) Drilled, Cemented
8 1/2 2,1,1 Roller Cone (mill steel tooth) Drilled, Cemented
6 1/8 2,1,1 Roller Cone (mill steel tooth) Drilled

Trayek BHA Design


20" Hammered

17 1/2"
17 1/2" Roller Cone Bit+ 9 1/2" X-treme c/w 1.0 AKO c/w Float Valve + 9 1/2" Stop Sub-Bottom + 9 1/2
OnTrak II + 14 7/8" Modular Stabilizer + 9 1/2" BCPM + 9 1/2" CoPilot + 9 1/2" Stop Sub-Top + 9 1/2" Filte
Sub c/w Filter Screen+ 9 1/2" X/O Sub+ 2 x 5 1/2 " HWDP + 7 Jars + 21 X 5 1/2" HWDP + 5 1/2" DP

12 1/4"
12 1/4" Roller Cone Bit +8" X-treme c/w 1.0 AKO c/w Float Valve + 8 1/4" OnTrak + 11 1/8" Modular
Stabilizer + 8 1/4" BCPM + 8 1/4 Stop Sub-Top + 8 1/4" Filter Sub c/w Filter Screen + 8" X/O Sub + 2 X 5
1/2" HWDP +7" Jars +21 x 5 1/2" HWDP+ 5 1/2 DP

8 1/2" 8 1/2" Roller Cone Bit + 8 3/8" Modular Stabilizer + 6 3/4 Zone Trak R+ 8 1/8" modular Stabilizer + 6 3/4
Stop Sub-Top + 8 1/8 String Stabilizer +6 3/4" Filter Screen + 6 3/4" Float Sub c/w Non-Ported Floa Valve
6 3/4 X/O Sub +3X 5" HWDP (TSS-105) + 6 1/2" Jars + 26X5" HWDP (TSS-105) + 5" DP (TSS-105)
6.125" 6 1/8" Roller Cone Bit + String Stabilizer + Fload Sub + Jars
1/2" Stop Sub-Bottom + 9 1/2
1/2" Stop Sub-Top + 9 1/2" Filter
X 5 1/2" HWDP + 5 1/2" DP

4" OnTrak + 11 1/8" Modular


er Screen + 8" X/O Sub + 2 X 5
2 DP

1/8" modular Stabilizer + 6 3/4


Sub c/w Non-Ported Floa Valve +
TSS-105) + 5" DP (TSS-105)
ub + Jars
A-B
B-C
C-D
D-E
E-F
F-G
G-H
H-I
I-J
J-K
K-L
Operations
preparation
rig move, rig up, mud pump, BOP, move up BHA
Instalation and hammering 20"
Installing Riser System
Drilling 17 1/2" OH, Circulation, Trip, POOH & L/D BHA
RIH & Cement Casing 13 3/8", WOC, N/U WellHead, N/U & Tes BOP
Drilling 12 1/4" OH, Circulation, Trip, POOH & L/D BHA
RIH & Cement Casing 9 5/8", WOC, N/U WellHead, N/U & Tes BOP
Drilling 8 1/2" OH, Circulation, Trip, POOH & L/D BHA
RIH & Cement Casing 7", WOC, N/U WellHead, N/U & Tes BOP
Drilling 6 1/8" OH, Circulation, Trip, POOH & L/D BHA
Completion Well (Setting 5" liner and gravel pack, tubing completion and wellhead completion)
rig down, and rig move
Total Operational Days

Trayek
Conductor
Surface
Intermediate
Production liner
Screen Liner
Day(s) Rig Day(s) Depth, ft TVD RKB
0 0 0
2.5 2.5 0 Depth vs Time
1.8 4.3 728
1.4 5.7 728 0 5 10 15 20 25 30 35 40
0
3.5 9.2 1428
1000
1.8 11 1428

Depth, f TVDRKB
2000
7.2 18.2 4056
3 21.2 4056 3000 Depth vs Time
4.4 25.6 6135 4000
4 29.6 6135 5000
0.6 30.2 6184 6000
1 31.2 6184
7000
2.5 33.7 6184
33.7 Day(s)

Depth, ft TVD
428 - 728
428 - 1428
428 - 4056
428 - 6135
6135 6184
e
5 40

Depth vs Time
DETAILED DRILLING ESTIMATE
Operation, Services or Equipment # No. Of Units Unit Type Cost Per Unit, $
Predill and Planning
Lease Acquisition 5 Hectares 8800
Licenses Fee 2 Each 4750
Surveying 7 Days 6403
Planning and Programs 640 Hours 1800

Construction
Location 18 Days 21000
Lease Maintenance 28 Days 3250
Lease Cleanup 0 Days 1430
Bridges/Culverts/Catle Guards 9 Each 13500
Standby Equipment 7 Days 1350
Supervision 21 Days 2670
Lease Reclamation 21 Days 18450
Lease Reclamation Supervision 21 Days 1760

Rig Contract
Rig Contract 33.7 Days 285000

Rentals
Sump Pump(s) 3 33.7 Days 1000
Surface Equipment 4 33.7 Days 3430
Solids Control Equipment 6 33.7 Days 3275
High Speed Mixer(s) 2 33.7 Days 2280
Helicopter & Aviation Charges 1 33.7 Days 13500
Downhole Tool Rentals 7 33.7 Days 4800
Drill string 206 33.7 Days 54

Service and Supplies


Blow Out Preventer 1 Each 215000
Hammer - Conductor Hole 1 Each 12500
Bits - Surface Hole 2 Each 39800
Bits - Intermediate Hole 4 Each 23200
Bits - Production 5 Each 17450
Bits - Liner 2 Each 19400
Surface Mud and Chemicals 710.72 Bbl 105
Intermediate Mud and Chemicals 877.84 Bbl 650
Production Mud and Chemicals 645.64 Bbl 985
Liner Mud 332.10 Bbl 865
Mud Logging 30.2 Days 945
Drill Stem Tests 1 Each 22500
Cores Cut 8 Each 26500
Electric Logging 1754.88 m MD 49
Environmental Services 6 Each 1580
Drilling Waste Management 9 Each 2620
Safety 33.7 Days 2040
Vertical Drilling Services 31.2 Days 13800
Trucking and Shipping 33.7 Days 3310
Fluid and/ or Cutting Hauling 33.7 Days 2280
Fluid and/or Cutting Disposal 877.84 Bbl 830
Welding 6 Each 5400
Inspection and Repair 6 Each 7800

Casing and Cementing


Riser 131 Metres 315

Conductor Casing 12.79 Ton 1150


Attachment and Accessories 30 Each 1870
Tongs 91.46 Metres 14.6

Surface Casing 21.16 Ton 950


Surface Casing 0.69 Ton 980
Attachment and Accessories 30 Each 1870
Tongs 304.88 Metres 18.6
Cement and Service 304.88 Metres 103

Intermediate Casing 64.61 Ton 960


Intermediate Casing 21 ton 920
Attachment and Accessories 111 Each 1870
Tongs 1106.10 Metres 22.4
Cement and Service 810.37 Metres 108

Production Casing 50.86 Ton 850


Production Casing 1.1 Ton 790
Attachment and Accessories 173.9939 Each 1980
Tongs 1739.94 Metres 23.3
Cement and Service 642.99 Metres 114

Liner 0.29 Ton 780


Abandonment Cement 2 Plugs 46450
Cement Plug Loggin 2 Plugs 43300

Supervision and Administration


Drilling Supervisor 1 33.7 Days 7800
Well Site Geologist 1 33.7 Days 6600
Geological Rentals 33.7 Days 960
Insurance 33.7 Each 830
Communication 33.7 Days 430

0.05
0.02

DETAILED COMPLETION ESTIMATE


Operations, Services or Equipment # No. Of Units Unit Type Cost Per Unit, $
Wellhead 1 Each 124000
Tubing 201 Each 240
Packers, Plugs, Retainers 1 Each 7440
Service Rig 9.1 Day 71500
Boiler 0 Day 1500
CSA 9.1 Day 1845
Crew Transportation 9.1 Day 750
Hauling and Trucking 9.1 Day 6780
Vacuum Truck 9.1 Day 5600
Water and Trucking 9.1 Day 1300
Completion Fluids and Chemicals 160 Cubic Metre 240
Surface Equipment Rentals 1 Each 18800
Downhole Equipment Rentals 1 Each 12500
Cased Hole Logs 1 Each 24000
Perforating and Logging 3 Each 38000
Wireline 4 Runs 9500
Remedial Cementing 0 Each 16500
Stimulation 1 Each 86032
Completion Supervisor 9.1 Day 3300
Inspection/ Safety 10 Each 2200
Environmental 2 Each 2100
Lease and Road Maintenance 10 Day 1240
Production Test 6 Day 8860
Fluids Analysis 4 Each 860
Snubbing 0 Day 8800
Nitrogen 0 Cubic Metre 4

0.05
0.02
TOTAL DRILL, CASE,
Comments and Detail Drilled and Cased, $

Surface Lease Entry 8800


Per Well Fee 500
Site and Plan 44821
Engineering and Programming 1152000
1206121

Engineering and Construction 378000


Labour and Equipment 91000
Labour and Equipment 0
Labour and Equipment 121500
Grader, hoe, Cat 0
Daily Rater Incl. Sub and Exp 56070
Labour and Equipment 387450
Daily Rater Incl. Sub and Exp 36960
1070980

Rig Contract 9604500


9604500

Pump 101100
Garbage bin, pumps, pason, Invert Acc, etc 462364
Centrifuge(s), BOS tank, etc 662205
High speed mixer, pill tank, line 153672
Helicopter 454950
Perf Motors, subs jars, stabilizes, etc 1132320
HWDP, small inch drillpipe, etc 375121.44
3341732.44

Hammer 12500
Roller Cone Mill Steel Bit, 17 1/2" 79600
Roller Cone Mill Steel Bit, 12 1/4" 92800
Roller Cone Mill Steel Bit, 8 1/2" 87250
Roller Cone Mill Steel Bit, 6 1/8" 38800
Cost per Bbl 74626.01
Cost per Bbl 570594.417687961
Cost per Bbl 635957.21
Cost per Bbl 287265.253956583
Daily Rate - Crew Plus Costs 28539
Unit, Crew, Anaysis, Samples 22500
Equipment, Crew, Analysis 212000
Cost per m logged all in 85989.0243902439
Spray Field Samplin, Reporting, etc 9480
Cost per fluid Sample and Analysis 23580
Daily Rate Crew and Equipment 68748
Daily rate all in crews and tools 430560
Equipment and tool trucking 111547
Fluid hauling other than water 76836
Drilling fluid hauled for disposal per Bbl 728605.18
Cost per well 32400
Cost per well 46800
3756977.09

21" Riser OD x 0.625" wall, with 2 choke and kill lines, 5" OD x 3.75" ID41418.66

20", H-40 94 ppf BTC 14709.99


Scratchers, Centralisers, Float equip 55415.8536585366
Crew and Equipment 1335.3658536585

13 3/8", H-40 48 ppf BTC 20104.6489344


13 3/8", J-55 54.5 ppf BTC 678.33776416
Scratchers, Centralisers, Float equip 57012.1951219512
Crew and Equipment 5670.7317073171
Pumping, Tonnage, Additives 31402.4390243902

9 5/8", H-40 40 ppf BTC 62025.2587008


9 5/8", WC-50 40 ppf BTC 19320
Scratchers, Centralisers, Float equip 206840.243902439
Crew and Equipment 24776.5853658537
Pumping, Tonnage, Additives 87519.512195122

7", J-55 20ppf BTC 43228.224784


7", L-80 23 ppf BTC 832.41843064
Scratchers, Centralisers, Float equip 344507.926829268
Crew and Equipment 40540.5792682927
Pumping, Tonnage, Additives 73300.61

5", J-55 13ppf BTC 225.37


Pumping, Tonnage, Additives 92900
Run plug log, all in 86600
1310364.95

Drilling consultant rate all in 262860


Geological Consultant rate all in 222420
Gas Detector etc 32352
Drilling Insurance 27971
14491
560094

SUBTOTAL, $ 20850769.48
CONTINGENCY 5%, $ 1042538.47390876
MISCELLANEOUS 2%, $ 417015.389563504
OVERHEAD ON SUBTOTAL, $ 1203762

TOTAL COST ESTIMATE, $ 23514085.34

Comments and Detail Drilled and Completed, $


Type and accessories 124000
48280
Anchors, Packer, Profiles, nipples etc 7440
Daily rig rate all in 650650
Basic Day rate fuel in 0
Subsitence and accomodation 16789.5
Mileage, bus or air 6825
Tubing and other equipment 61698
Rig days plus prod test days 50960
Water access and supply 11830
Reformate, KCl, MeOH 38400
Rotating heads, frac heads etc 18800
mud motors, packers, frac strings 12500
CBL etc 24000
TCP/Csg guns 114000
Gauge ring, run and pull recorders 38000
Includes perforating, D/H tools etc 0
Acid 86032
Daily rate all in 30030
Environmental, operational, government 22000
Technician 4200
Crew and Equipment 12400
Includes Equipment, crews and analysis 53160
Oil, gas and Water 3440
Unit and Crews 0
0
SUBTOTAL COMPLETION, $ 1435434.5

CONTINGENCY 5%, $ 71771.725


MISCELLANEOUS 2%, $ 28708.69

TOTAL COMPLETION ESTIMATE 1535914.915


TOTAL DRILL, CASE, AND COMPLETION ESTIMATE 25050000
25050000
-0.26
Tangible: 18138644.03
Intanginble: 6911356.23

Trayek Conductor Surface Intermediate


Production liner
screen liner
Bit Size hammered 17.5 12.25 8.5 6.125
OD casing, inch 20 13.625 9.625 7 5
ID casing, inch 19.124 12.715 8.921 6.456 4.494
Volume. Bbl - 710.72387 877.83757 645.64183 332.09856

Bit Program
Size, inch IADC Type Bit Keterangan
20 - - Hammered
17 1/2 Roller
1,2,1 Cone (mill steel
bor,
tooth)
semen
12 1/4 Roller
1,2,5 Cone (mill steel
bor,
tooth)
semen
8 1/2 Roller
2,1,1 Cone (mill steel
bor,
tooth)
semen
6 1/8 Roller
2,1,1 Cone (mill steel tooth)
bor
1 lbs = 0.000453592

Trayek OD,inch Grade NW,ppf ID,inch Depth, tvdrkbLength, ft Pieces


Conductor 20 H-40 94 19.124 428 - 728 300 10
Surface 13.375 H-40 48 12.715 428 - 1400 972 32
13.375 J-55 54.5 12.615 1400 - 1428 28 1
Intermediate 9.625 H40 40 8.921 428 - 3989 3561 119
9.625 WC-50 40 8.835 3989 - 4056 67 2
Production 7 J-55 20 6.456 428 - 6034 5606 187
7 L-80 23 6.366 6034 - 6135 101 3
Liner 5 J-55 13 4.494 6135 - 6184 49 2

Conductor Surface IntermediateProd Liner Liner Liner


TOC - 428 1398 4026 - 6184
Kedalaman Lead - 761.33333 2284 4729 -
Kedalaman Tail - 1428 4056 6135 -

2658
810.3658536585