Mar-18
OBRA:
PROPIETARIO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE 13 CALLES EN LA LOCALIDAD DE CONSUELO, DISTRITO DE SAN PABLO-
CONTRATISTA: CONSORCIO CONSUELO
RESIDENTE ING. WALTER BARRENECHEA SOTO
SUPERVISOR: AYBARSA CONSULTORES EIRL
MONTO CONTRAC.: : 3'363,645.62 SIN IGV
FECHA P. BASE: October-17
FECHA ADELANTO: January-18
FORMULA: D = A x ((Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)
ADELANTO OTORGADO Coeficiente Adelanto Utilizado
VAL Nº Mes Monto Vo Incidencia en valor. (A) Imr Ima
(1) (2) (3) (4)=(2)x(3) (5) (6)
ADELANTO Nº : 1 ASFALTO
1 Jan-18 303,250.57 223,808.13 0.135 30,214.10 1,461.65 1,461.65
2 Feb-18 303,250.57 567,174.00 0.135 76,568.49 1,461.65 1,461.65
3 Mar-18 303,250.57 239,599.75 0.135 32,345.97 1,461.65 1,461.65
4 Apr-18 303,250.57 0.00 0.135 0.00
5 May-18 303,250.57 0.00 0.135 0.00
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA M
Mar-18
OBRA:
PROPIETARIO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE 13 CALLES EN LA LOCALIDAD DE CONSUELO, DISTRITO DE SAN PABLO-
CONTRATISTA: CONSORCIO CONSUELO
RESIDENTE ING. WALTER BARRENECHEA SOTO
SUPERVISOR: AYBARSA CONSULTORES EIRL
MONTO CONTRAC.: : 3'363,645.62 SIN IGV
FECHA P. BASE: October-17
FECHA ADELANTO: January-18
6 Jun-18 303,250.57 0.00 0.135 0.00
1 HORMIGON
Jan-18 257,709.10 223,808.13 0.3590 80,347.12 425.85 425.85
Feb-18 257,709.10 567,174.00 0.3590 203,615.47 426.92 425.85
Mar-18 257,709.10 239,599.75 0.3590 86,016.31 426.92 425.85
Apr-18 257,709.10 0.00 0.3590 0.00 426.92 425.85
May-18 257,709.10 0.00 0.3590 0.00 426.92 425.85
Jun-18 257,709.10 0.00 0.3590 0.00 426.92 425.85
672,729.12 0.65
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA M
Mar-18
OBRA:
PROPIETARIO: MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DE 13 CALLES EN LA LOCALIDAD DE CONSUELO, DISTRITO DE SAN PABLO-
CONTRATISTA: CONSORCIO CONSUELO
RESIDENTE ING. WALTER BARRENECHEA SOTO
SUPERVISOR: AYBARSA CONSULTORES EIRL
MONTO CONTRAC.: : 3'363,645.62 SIN IGV
FECHA P. BASE: October-17
FECHA ADELANTO: January-18
RESUMEN DE DEDUCCIONES
MESES DEDUCCIONES
OCTUBRE 0.00
NOVIEMBRE 1,855.54
DICIEMBRE 783.86
ENERO 0.00
FEBRERO 0.00
MARZO
total S/. 2,639.40
ANTO ESPECIFICO PARA MATERIALES Nº 01
I.U. 72
469.92 41,164.55 28,407.48 0.00
469.92 41,164.55 8,835.63 1,819.67
469.92 41,164.55 27,507.36 768.71
I.U. 45
1,270.34 263,559.22 233,345.12 0.00
1,270.34 263,559.22 186,990.73 0.00
1,270.34 263,559.22 231,213.25 0.00
1,270.34
1,270.34
ANTO ESPECIFICO PARA MATERIALES Nº 01
1,270.34
I.U. 2
465.71 68,607.56 47,345.79 0.00
465.71 68,607.56 14,726.03 35.87
465.71 68,607.56 45,845.59 15.15
465.71 68,607.56 68,607.56 0.00
465.71 68,607.56 68,607.56 0.00
465.71 0.00 0.00 0.00
I.U. 2
428.42 259,264.37 178,917.25 0.00
428.42 259,264.37 55,648.91 508.54
428.42 259,264.37 173,248.06 214.83
428.42 259,264.37 259,264.37 0.00
428.42 259,264.37 259,264.37 0.00
428.42 0.00 0.00 0.00
632,595.70
ANTO ESPECIFICO PARA MATERIALES Nº 01