Rev. No. : 1
PT. INDO TEHNIK INDUSTRI Date : 4/2/2018
GRATI CCPP EXTENSION PROJECT 450 MW (단위 : USD)
1) Piping Welding & Erection Pipe,B36.10M,BE,A53-B,STD D-IN 2,600 N/A 18 48,048 34 89,232 53 137,280
2) Removal of Temporary pipe Pipe,B36.10M,BE,A53-B,STD ton 32 N/A 315 10,080 585 18,720 900 28,800
1) HP Bypass Valve(200A) Hydro Blind remove and Blowing Kit installation (#31,#32) set 2 N/A 26 52 48 96 74 148
2) HRH Bypass Valve(400A) Hydro Blind remove and Blowing Kit installation (#31,#32) set 2 N/A 52 103 96 192 148 296
Blowing Kit remove actuator installation set 2 N/A 52 103 96 192 148 296
3) LP Bypass Valve(300A) Hydro Blind remove and Blowing Kit installation (#31,#32) set 2 N/A 39 78 72 144 111 222
Blowing Kit remove actuator installation set 2 N/A 39 78 72 144 111 222
4) HP Main Stop Valve(350A) Hydro Blind remove and Blowing Kit installation set 1 N/A 45 45 84 84 129 129
Blowing Kit remove and Hydraulic Oil Cylinder reinstate set 1 N/A 45 45 84 84 129 129
5) HRH(IP) Stop Valve(650A) Hydro Blind remove and Blowing Kit installation set 1 N/A 84 84 156 156 240 240
Blowing Kit remove and Hydraulic Oil Cylinder reinstate set 1 N/A 84 84 156 156 240 240
6) CRH Quick Stop Valve(500A) Hydro Blind remove and Blowing Kit installation set 1 N/A 65 65 120 120 185 185
Blowing Kit remove and Hydraulic Oil Cylinder reinstate set 1 N/A 65 65 120 120 185 185
7) LP Strainer(300A) Hydro Blind remove and Blowing Kit installation set 1 N/A 39 39 72 72 111 111
Blowing Kit remove and Hydraulic Oil Cylinder reinstate set 1 N/A 39 39 72 72 111 111
1) Target Device (HP Steam) Installation and reinstate (Compressed Air Line connection) set 1 N/A 280 280 390 390 670 670
2) Target Device (HRH-IP Steam) Installation and reinstate (Compressed Air Line connection) set 1 N/A 280 280 390 390 670 670
3) Target Device (LP Steam) Installation and reinstate (Compressed Air Line connection) set 1 N/A 280 280 390 390 670 670
4 Silencer Install and remove (with base concrete) set 2 N/A* 3,080 6,160 4,290 8,580 7,370 14,740
6 Insulation Work
▣ Bill of Quantity Steam Blowing Temporary Piping Works
Rev. No. : 1
PT. INDO TEHNIK INDUSTRI Date : 4/2/2018
GRATI CCPP EXTENSION PROJECT 450 MW (단위 : USD)
1) Insulation 650*P150 (MINERAL WOOL - Wired Blanket) M 30 N/A* 28 836 52 1,552 80 2,388
2) Insulation 650*P115 (MINERAL WOOL - Wired Blanket) M 15 N/A* 26 387 48 719 74 1,106
3) Insulation 450*P140 (MINERAL WOOL - Wired Blanket) M 55 N/A* 21 1,177 40 2,186 61 3,364
4) Insulation 350*P100 (MINERAL WOOL - Wired Blanket) M 50 N/A* 16 806 30 1,497 46 2,304
5) Insulation 300*P80 (MINERAL WOOL - Wired Blanket) M 20 N/A* 13 270 25 501 39 771
6) Insulation 450*P65 (MINERAL WOOL - Wired Blanket) M 20 N/A* 17 340 32 632 49 972
1) SUPPORT Fabrication Installation for SILENCER Structure (Attached dwg) SET 2 N/A 840 1,680 1,560 3,120 2,400 4,800
2) SUPPORT PIPE GENERAL SUPPORT (H-BEAM 150*150) TON 3 N/A 420 1,260 780 2,340 1,200 3,600
3) SUPPORT PIPE CLAMP SHOE(SUPPLY BY LEC 26",18",14") PCS 30 N/A 126 3,780 234 7,020 360 10,800
8 Scaffolding Work Ls 1 18,915 18,915 2,317 2,317 4,303 4,303 25,536 25,536