Vous êtes sur la page 1sur 12

May_-_July

Period May ( 5th - 31st May 2018)


Awal Bulan (5th May Akhir Bulan (31st May Selisih (Akhir –
No Panel Kwh
2018 2018) Awal)
A. Listrik
1 SDB – AHU.N 81,025 103,280 22,255
2 DB – Compressor 27,324 30,508 3,184
3 SDB – Machine. N 11,174 13,937 2,763
4 SDB – VAC.N 51,084 58,036 6,952
5 Spare 16,428 16,428
6 DB – Tetrapak 747.070 943.26 196.19
7 SDB – Chiller 415,340 512,770 97,430
8 SDB – EL (Umum) 84,643 91,629 6,986
9 SDB – Pump 16,329 17,926 1,597
10 SDB – Lift 1,160.9 1,264.70 103.80
11 SDB – Machine E 12,087 16,618 4,531
12 SDB – AHU E 97,230 118,440 21,210
13 SDB – VAC. E 30,453 34,960 4,507
14 SDB – UPS 21,319 27,064 5,745
15 SDB – Mechanical E 7,083 9,419.70 2,336.70
18 LVMDB Incoming Trafo 876,240 1,059,500 183,260.00
19 LVMDB Incoming Genset - -
Meter Listrik kWh 894,770 1,084,279 189,509.00
20 Cikarang
Listrindo kWARH 273,635 3,422,976 3,149,341.00

Period June ( 3rd - 30th June 2018)

Awal Bulan (3rd Akhir Bulan (30 June Selisih (Akhir –


No Panel Kwh
June 2018) 2018) Awal)

A. Listrik
1 SDB – AHU.N 106,800 129,460 22,660
2 DB – Compressor 30,839 33,032 2,193
3 SDB – Machine. N 14,286 18,534 4,248
4 SDB – VAC.N 58,775 67,300 8,525
5 Spare 16,428 16,428 -
6 DB – Tetrapak 972 1,212.5 241
7 SDB – Chiller 525,081 624,430 99,349
8 SDB – EL (Umum) 9,235 10,176 941
9 SDB – Pump 18,153 20,161 2,008
10 SDB – Lift 1,282 1,412 130
11 SDB – Machine E 17,067 21,252 4,185
12 SDB – AHU E 121,160 151,300 30,140
13 SDB – VAC. E 35,623 41,598 5,975
14 SDB – UPS 27,825 36,068 8,243
15 SDB – Mechanical E 9,937 13,197 3,260
18 LVMDB Incoming Trafo 10,843 12,884 2,041
19 LVMDB Incoming Genset - -

Page 1
May_-_July

Meter Listrik kWh 1,110,024 1,324,542 214,518


20 Cikarang
Listrindo kWARH 352,743 428,428 75,685

Period July ( 1st - 31st July 2018)


Awal Bulan (1st July Akhir Bulan (31st July Selisih (Akhir –
No Panel Kwh
2018) 2018) Awal)
A. Listrik
1 SDB – AHU.N 130,360 161,690 31,330
2 DB – Compressor 34,161 37,820 3,659
3 SDB – Machine. N 18,702 23,611 4,909
4 SDB – VAC.N 67,492 78,303 10,811
5 Spare 16,428 16,428 -
6 DB – Tetrapak 1,223 1,496.1 273.40
7 SDB – Chiller 628,200 737,860 109,660
8 SDB – EL (Umum) 10,203 11,701 1,498
9 SDB – Pump 20,264 22,712 2,448
10 SDB – Lift 1,415 1,529 114
11 SDB – Machine E 21,338 25,573 4,235
12 SDB – AHU E 152,548 184,130 31,582
13 SDB – VAC. E 41,765 48,432 6,667
14 SDB – UPS 36,371 44,617 8,246
15 SDB – Mechanical E 13,241 15,601 2,360
18 LVMDB Incoming Trafo 12,950 15,260 2,310
19 LVMDB Incoming Genset - -
Meter Listrik kWh 1,326,365 1,557,511 231,146
20 Cikarang
Listrindo kWARH 423,298 511,276 87,978

Page 2
May_-_July

179,797

192,097

Page 3
May_-_July

Page 4
August-_October

Bulan Agustus
Akhir Bulan (31 Agustus
No Panel Kwh Awal Bulan (1 Agustus 2018)
2018)
A. Listrik
1 SDB – AHU.N 162,590 190,340
2 DB – Compressor 37,940 42,464
3 SDB – Machine. N 23,755 29,044
4 SDB – VAC.N 78,508 87,115
5 Spare 16,428 16,428
6 DB – Tetrapak 1,503 1,780
7 SDB – Chiller 740,920 847,040
8 SDB – EL (Umum) 11,750 13,553
9 SDB – Pump 22,769 24,917
10 SDB – Lift 1,531.60 1,662.10
11 SDB – Machine E 25,702 31,856
12 SDB – AHU E 185,020 219,150
13 SDB – VAC. E 48,548 53,661
14 SDB – UPS 44,838 53,563
15 SDB – Mechanical E 15,669 17,405
18 LVMDB Incoming Trafo 1,532,300 1,756,200
19 LVMDB Incoming Genset - -
Meter Listrik kWh 1,571,863 1,795,298
20 Cikarang
Listrindo kWARH 516,778 581,125

Bulan September

Akhir Bulan (30


No Panel Kwh Awal Bulan (1 September 2018)
September 2018)

A. Listrik
1 SDB – AHU.N 191,220 219,280
2 DB – Compressor 42,608 50,357
3 SDB – Machine. N 29,226 34,448
4 SDB – VAC.N 87,498 96,918
5 Spare 16,428 16,428
6 DB – Tetrapak 1,788.10 2,017.70
7 SDB – Chiller 850,780 956,830
8 SDB – EL (Umum) 13,627 16,437
9 SDB – Pump 24,998 27,176
10 SDB – Lift 1,664.80 1,794.40
11 SDB – Machine E 32,229 40,621
12 SDB – AHU E 220,310 251,680
13 SDB – VAC. E 53,836 59,432
14 SDB – UPS 53,879 63,382
15 SDB – Mechanical E 17,446 19,732
18 LVMDB Incoming Trafo 1,764,100 1,994,100
19 LVMDB Incoming Genset - -
Meter Listrik kWh 1,803,652 2,037,525
20 Cikarang
Listrindo
Page 5
August-_October
Meter Listrik
20 Cikarang
Listrindo kWARH 583,547 652,964

Bulan Oktober
Akhir Bulan (31 Oktober
No Panel Kwh Awal Bulan (1Oktober 2018)
2018)
A. Listrik
1 SDB – AHU.N 220,650 246,720
2 DB – Compressor 50,736 60,064
3 SDB – Machine. N 34,699 40,779
4 SDB – VAC.N 97,277 109,590
5 Spare 16,428 16,428
6 DB – Tetrapak 2,028.50 2,296.20
7 SDB – Chiller 962,150 1,083,300
8 SDB – EL (Umum) 16,561 19,165
9 SDB – Pump 27,269 30,055
10 SDB – Lift 1,800 1,925.60
11 SDB – Machine E 40,844 49,786
12 SDB – AHU E 253,470 280,160
13 SDB – VAC. E 59,573 66,142
14 SDB – UPS 63,826 74,208
15 SDB – Mechanical E 19,883 23,922
18 LVMDB Incoming Trafo 2,005,300 2,255,200
19 LVMDB Incoming Genset - -
Meter Listrik kWh 2,047,355 2,302,705
20 Cikarang
Listrindo kWARH 655,883 736,727

Bulan November
Akhir Bulan (16
No Panel Kwh Awal Bulan (1 November 2018)
November 2018)
A. Listrik
1 SDB – AHU.N 247,590 258,580
2 DB – Compressor 60,375 65,282
3 SDB – Machine. N 40,970 43,840
4 SDB – VAC.N 109,990 114,870
5 Spare 16,428 16,428
6 DB – Tetrapak 2,305.50 2,438.80
7 SDB – Chiller 1,087,400 1,143,020
8 SDB – EL (Umum) 19,253 20,367
9 SDB – Pump 30,171 31,437
10 SDB – Lift 1,929.90 1,988.20
11 SDB – Machine E 50,157 55,420
12 SDB – AHU E 280,960 292,010
13 SDB – VAC. E 66,346 68,961
14 SDB – UPS 74,550 79,787
15 SDB – Mechanical E 24,075 26,061
16 Spare 545.43 545.43
18 LVMDB Incoming Trafo 2,263,600 2,378,000
19 LVMDB Incoming Genset - -

Page 6
August-_October

Meter Listrik kWh 2,312,216 2,428,877


20 Cikarang
Listrindo kWARH 739,524 775,951

Nov-18
No Power Meter Equipments 1st November 2018

1 Chiller Chiller 1 and 2 1,087,400


AHU RC 2, AHU RC 3, AHU FA 2
2 AHU N 247,590

3 Exhaust fan (SDB- VAC.N) Non production and lab exhaust 109,990
AHU RC 1, AHU FA 1, AHU RC4, AHU FARC 1,
4 AHU E* 280,960
AHU cRABS, LAF

5 El (General) Lighting Power Socket 19,253

22 October 2018 - 21 November 2018


No Panel Kwh 22 October 2018 21 November 2018
A. Listrik
1 SDB – AHU.N 239,420 261,340
2 DB – Compressor 57,194 66,830
3 SDB – Machine. N 39,019 44,830
4 SDB – VAC.N 106,040 116,240
5 Spare 16,428 16,428
6 DB – Tetrapak 2,213.8 2,486.8
7 SDB – Chiller 1,047,400 1,159,200
8 SDB – EL (Umum) 18,325 20,510
9 SDB – Pump 29,079 31,812
10 SDB – Lift 1,887.7000 2,005.8000
11 SDB – Machine E 46,641 56,125
12 SDB – AHU E 273,030 295,290
13 SDB – VAC. E 64,027 69,805
14 SDB – UPS 70,989 81,448
15 SDB – Mechanical E 22,664 26,664
16 Spare - -
18 LVMDB Incoming Trafo 2,181,300 2,411,000
19 LVMDB Incoming Genset
Meter Listrik kWh 2,228,091 2,462,012
20 Cikarang
Listrindo kWARH 711,864.00 785,205.00

No Power Meter Equipments 22-Oct-18


1 Chiller Chiller 1 and 2 1,047,400
AHU RC 2, AHU RC 3, AHU FA 2
2 AHU N 239,420
3 Exhaust fan (SDB- VAC.N) Non production and lab exhaust 106,040
AHU RC 1, AHU FA 1, AHU RC4, AHU FARC 1,
4 AHU E* 273,030
AHU cRABS, LAF

Page 7
August-_October

5 El (General) Lighting Power Socket 18,325

21 November - 29 November 2018


No Panel Kwh 21-Nov-18 29-Nov-18
A. Listrik
1 SDB – AHU.N 261,340 267,360
2 DB – Compressor 66,830 69,411
3 SDB – Machine. N 44,830 46,416
4 SDB – VAC.N 116,240 119,000
5 Spare 16,428 16,428
6 DB – Tetrapak 2,486.8 2,561.6
7 SDB – Chiller 1,159,200 1,188,000
8 SDB – EL (Umum) 20,510 20,718
9 SDB – Pump 31,812 32,392
10 SDB – Lift 2,005.80 2,038.20
11 SDB – Machine E 56,125 57,577.7
12 SDB – AHU E 295,290 301,430
13 SDB – VAC. E 69,805 71,371
14 SDB – UPS 81,448 84,162
15 SDB – Mechanical E 26,664 27,689
16 Spare - -
18 LVMDB Incoming Trafo 2,411,000 2,470,100
19 LVMDB Incoming Genset - -
Meter Listrik kWh 2,462,012 2,522,541
20 Cikarang
Listrindo kWARH 785,205 802,337

No Power Meter Equipments 21-Nov-18


1 Chiller Chiller 1 and 2 1,159,200
AHU RC 2, AHU RC 3, AHU FA 2
2 AHU N 261,340
3 Exhaust fan (SDB- VAC.N) Non production and lab exhaust 116,240
AHU RC 1, AHU FA 1, AHU RC4, AHU FARC 1,
4 AHU E* 295,290
AHU cRABS, LAF
5 El (General) Lighting Power Socket 20,510

Page 8
August-_October

Selisih (Akhir – Awal)

27,750
4,524
5,289
8,607
-
277
106,120
1,803
2,148
130.5 212,507
6,154
34,130
5,113
8,725
1,736
223,900
-
223,435
64,347

Selisih (Akhir – Awal)

28,060
7,749
5,222
9,420
-
229.60
106,050
2,810
2,178 218,995
129.60
8,392
31,370
5,596
9,503
2,286
230,000
-
233,873

Page 9
August-_October

69,417

Selisih (Akhir – Awal)

26,070
9,328
6,080
12,313
-
267.70
121,150
2,604
2,786 237,346
125.60
8,942
26,690
6,569
10,382
4,039
249,900
-
255,350
80,844

Selisih (Akhir – Awal)

10,990
4,907
2,870
4,880
-
133.30
55,620
1,114
1,266
58.30
5,263
11,050
2,615
5,237 107,989.6
1,986
-
114,400
-

Page 10
August-_October

116,661

36,427

16th November 2018 Difference

1,143,020 55,620

258,580 10,990

114,870 4,880

292,010 11,050

20,367 1,114

83,654

Selisih

21,920
9,636
5,811
10,200
-
273.00
111,800
2,185
2,733
118.10
9,484
22,260
5,778
10,459 216,657.1
4,000
-
229,700
-
233,921
73,341

21-Nov-18 Difference
1,159,200 111,800
261,340 21,920
116,240 10,200
295,290 22,260

Page 11
August-_October

20,510 2,185
168,365

Selisih

6,020
2,581
1,586
2,760
-
74.80
28,800
208
580
32.40
1,452.70
6,140
1,566
2,714 55,539.9
1,025
-
59,100
-
60,529
17,132

29-Nov-18 Difference
1,188,000 28,800
267,360 6,020
119,000 2,760
301,430 6,140
20,718 208
43,928

Page 12