ANALISIS DE PRECIO UNITARIO

ANÁLISIS DE PRECIOS UNITARIOS


Item Nº6:HORMIGÓN ARMADO PARA VIGAS Unidad: m3

PROYECTO: CONSTRUCCIÓN SISTEMA DE AGUA POTABLE EN LA COMUNIDAD DE LAS PERAS Cantidad: 2.55
Módulo: (M02) - SANITARIO Tipo de cambio: 6.96 Bs/$us

Nº P. Insumo/Parámetro Und. Cant. Unit. (Bs) Parcial (Bs)


A MATERIAL
1 - Cemento Kg 324.00 56.00 18,144.00
2 - Arena m3 0.46 120.00 55.20
3 - Grava m3 0.69 380.00 262.20
Agua lt 180.00 0.00 0.00
Hierro Kg 65.28 8.07 526.81
Madera pie2 59.30 8.00 474.40
Alambre Kg 0.70 15.00 10.50
Clavos Kg 0.70 15.00 10.50

D TOTAL MATERIALES (A) = 19,483.61


B MANO DE OBRA
1 - ALBAÑIL hr 10.00 18.75 187.50
2 - AYUDANTE hr 18.00 12.50 225.00
Encofrador 18.00 18.75 337.50
Armador 10.00 18.75 187.50

E SUB TOTAL TOTAL MANO DE OBRA (B) = 937.50


F Beneficios Sociales o Cargas Sociales (% Subtotal de la M.O. 55% al 71%) 55.00% (B) = 515.63
G Impuestos IVA M.O. (% Subtotal de la M.O.+ Cargas Sociales 14.94%) 14.94% (B) = 217.10
H TOTAL MANO DE OBRA B=(E+F+H) = 1,670.22
C EQUIPO Y MAQUINARIA
Mezcladora hr 1.00 20.00 20.00
Vibradora hr 0.80 15.00 12.00

I SUB TOTAL TOTAL EQUIPO Y MAQUINARIA (C) = 32.00


J HERRAMIENTAS MENORES 5.00% (B) = 83.51
K TOTAL HERRAMIENTAS - EQUIPO Y MAQUINARIA (I+J) = 115.51
L SUB TOTAL COSTOS (D+H+K) = 21,269.34

M Gastos Generales 8.00% (L) = 1,701.55


N Utilidad 6.00% (L+M) = 1,378.25
O COSTO PARCIAL DEL ÍTEM (L+M+N) = 24,349.14
P IMPUESTOS IT (COSTO PARCIAL 3.09%) 3.09% (N) = 752.39
> Q TOTAL ITEM (O+P) = 25,101.53
> PRECIO ADOPTADO (Bs): 25,101.53
Son: Doce con 12/100 Bolivianos
> PRECIO ADOPTADO ($us): 3,606.54
Son: Uno con 76/100 Dólares
CÓMPUTOS MÉTRICOS
CÓMPUTOS MÉTRICOS
PROYECTO: ESTUDIO A DISEÑO FINAL PROYECTO: CONSTRUCCIÓN NUEVO BLOQUE PARA LA FACULTAD DE GRAN
CHACO – YACUIBA UAJMS”

DIMENSIONES
ITEM UNIDAD N° DE PARTES CANTIDAD CANTIDAD
LARGO ANCHO ALTO PARCIAL TOTAL
Zapatas de HºAº m3 3.06
Volumen de Base 2.7 2.7 0.25 1 1.82
Area Base m2 2.7 2.7 1 7.29
Area superior m2 0.6 0.6 1 0.36
Volumen tronco conm3 0.4 1.24
Viga de HºAº m3 2.55
m3 4.2 0.2 0.65 3 1.64
m3 4.2 0.18 0.6 2 0.91
Tendido de tubería ml
PVC DE 6" ml 500 1 500.00 500.00
Fierro galvanizado dml 485.7 3 1,457.10 1,457.10
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
PRESUPUESTO GENERAL
PRESUPUESTO GENERAL

ESTUDIO A DISEÑO FINAL PROYECTO: CONSTRUCCIÓN NUEVO BLOQUE PARA LA FACULTAD


DE GRAN CHACO – YACUIBA UAJMS”

N° ÍTEM UNIDAD CANTIDAD P.UNIT. (Bs) COSTO TOTAL (Bs)


4352 234 1,018,368.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL (BS) 1,018,368.00
PRESUPUESTO GENERAL
SON: #NAME?