■Case 1: Development for use at 250°C and 2.5 MPa
- Evaluation by actual equipment: September 2019
- Commercialization: September 2020
■Case 2: Development for use at 500°C and 10 MPa
- Development start: September 2021

Financials
Necessary development expense will be covered
(Details to be discussed).

REQUEST FOR PROPOSAL DESCRIPTION A: Gas–liquid two-phase flow rate:


NineSigma, representing a leading electrical Can measure the flow rate of the mixed fluid of
equipment manufacturer, seeks monitoring gas (vapor) and liquid (geothermal water)
technologies for geothermal power plant discharged from the steam well.
facilities. Specifically, the client seeks a two- • Target facility: Steam well piping
phase flowmeter, a silica concentration ○ Size (diameter): 8B to 32B
measurement device, and a steam wetness ○ Flow rate (total of the two-phase flow)
measurement device, which can be used under ▪ 100 to 1000 ton/hour
high temperature and high pressure in such as *Gas/water ratio; 10% to 90%
a steam turbine or a steam well. Potential • Measurement accuracy: about 1%
technologies that have not been applied to
geothermal power plants at present are also B: Silica concentration in geothermal fluid:
welcome. Can measure high silica concentration in
geothermal fluid (two-phase flow) piping.
Requirements for the monitoring technology • Target facility: Geothermal fluid piping
The client seeks sensors and monitoring ○ Size (diameter): 8B to 40 B
technologies that can measure any of A, B and C ▪ Steam flow rate: 100 to 1000 ton/hour
below. ○ Silica concentration: 100 to 500 ppm
• The measurement value can be monitored
Common conditions for A, B and C: remotely once a day
• Shall be usable for one year or more under
high-temperature and high-pressure C: Steam wetness:
conditions as in Case 1 below (the Can measure steam wetness (dryness) in steam
measurement accuracy should be turbine piping.
guaranteed). • Target facility: Steam turbine piping
• Preferably can be used under the condition ○ Size (diameter): 8B to 40B
for Case 2 requiring higher temperature and ○ Steam flow rate: 100 to 1000 ton/hour
pressure. ○ Steam wetness: 0.01%–0.5% mass
• The measurement value can be monitored
Temperature Pressure remotely once a day
Case 1 250°C 2.5 MPa
Case 2 500°C 10 MPa

NineSigma Asia Pacific, NineSigma Europe, NineSigma North America


RFP format and graphics© Copyright 2018 NineSigma Holdings, Inc
NineSigma Request # 9372571 Monitoring technology for geothermal power plant facility Page 2
POSSIBLE APPROACHES The client will review submitted proposals and
Regarding the sensors and monitoring possibly ask clarifying questions before selecting
technologies of A–C as described above, possible the most suitable candidates for collaboration. The
approaches might include, but are not limited to: client will select the best candidate(s) through
• Gas–liquid Two-phase flowmeter evaluations. During the selection process, the
○ Probe method client may execute non-disclosure agreements
○ Coriolis type mass flowmeter (NDA) with selected respondent(s), seek further
• Silica concentration measurement information disclosure, and discuss specific
○ Optical method development targets or potential opportunities.
○ Mass analysis The client will execute necessary agreement(s)
with the selected respondent(s) and move to the
• Steam wetness (dryness) measurement
advanced development phase. Specifics of any
○ Method using a vortex flowmeter
collaboration will be determined through
○ Method using near-infrared rays
consultation with the concerned parties.

ITEMS TO BE INCLUDED IN THE PROPOSAL


APPROACHES NOT OF INTEREST
Responses will use the Proposal Template which
The following approaches are not of interest:
is linked to the “attachments” shown at the bottom
• Technology at concept level
of the link <REQ#9372571> and include the
following items:
BACKGROUND
• Overview of the technology (principle,
To achieve a high-efficiency operation and a configuration, etc.)
reduction in maintenance costs of power plant, the • Characteristics and uniqueness of the
monitoring technology of related facilities and the technology
data analysis thereof are important. However, since • Development stage (prototype already
the geothermal power plants handles the high- developed / under development for practical
temperature and high-pressure water and steam use /commercialized)
including corrosive gas and impurities, sensors
• Current performance
require a higher heat resistance and pressure
○ Available temperature and pressure
resistance performance, which leads to the limited
conditions
monitoring technique utilized. While the client
○ Measurable physical properties (two-
develops technologies to solve these problems, the
phase flow rate/ silica concentration/
development of various sensors on the premise of
steam wetness)
application to IoT technology is widely performed all
○ Measurable range of physical properties
over the world. Therefore, the client has issued this
described above.
open request in order to further accelerate its own
○ Measurement time
research and development.
○ Measurement accuracy
In this project, the client focuses on the following
○ Device size
three monitoring technologies;
○ Case Study
• Flow rate measurement of gas–liquid two- ○ Achievements with collaborators
phase flow for diagnosis of soundness and
• Current issues and future plans (particularly,
prediction of life of the production (steam)
applicability to conditions for Case 2)
well
• Sample test conditions (quantity to be
• Measurement of steam wetness (dryness)
provided, cost, period, and terms of
for quality monitoring of steam for steam
agreement, etc.)
turbine
• Measurement of the silica concentration for SUBMITTING A RESPONSE
quality monitoring of the steam well and
prevention of scale adhesions in piping All proposals should be submitted online at
NineSights, the NineSigma open innovation
community, according to the instructions in the
ANTICIPATED PROJECT PHASES OR PROJECT PLAN Proposal Template. Supplemental files may be
submitted in addition to the proposal document.
Respondents should submit proposals using the
attached Response Template. For assistance, please contact the Solution
Provider Help Desk (PHD2@ninesigma.com).

NineSigma Holdings, Inc. NineSights.com


Request format and graphics© Copyright 2018 NineSigma Holdings, Inc
NineSigma Request # 9372571 Monitoring technology for geothermal power plant facility Page 3

REQUEST GUIDELINES

Non-Confidential Disclosure
By submitting a response you represent that the response
does not and will not be deemed to contain any
confidential information of any kind whatsoever.

Response Evaluation
NineSigma’s client will evaluate the response using the
following criteria:
• Overall scientific and technical merit of the proposed
approach
• Approach to proof of concept or performance
• Potential for proprietary position (i.e., is the
technology novel or protectable)
• Economic potential of concept
• Respondent’s capabilities and related experience
• Realism of the proposed plan and cost estimates

Response Selection
By submitting a response, you acknowledge that
NineSigma’s client reserves the sole and absolute right
and discretion to select for award all, some, or none of the
responses received for this announcement. NineSigma’s
client also may choose to select only specific tasks within a
proposal for award. NineSigma's client has the sole and
absolute discretion to determine all award amounts.
NineSigma will contact respondents with highly responsive
proposals for next steps, or the client may contact
respondents directly.

NineSigma Holdings, Inc. NineSights.com


Request format and graphics© Copyright 2018 NineSigma Holdings, Inc

Vous aimerez peut-être aussi