GRAND SUMMARY
PREAMBLES
BILL 1 - GENERAL REQUIREMENT
BILL 2 - MAIN HOTEL
BILL 3 - VILLAS & CHALETS
BILL 4 - SEAFOOD RESTAURANT
BILL 5 - MECHANICAL/ELECTRICAL & PLUMBING
BILL 6 - LANDSCAPING
BILL 7 - PROVISIONAL SUMS
BILL 8 - DAY WORKS
GRAND SUMMARY
Amount AED
BILL NO
EMPLOYER'S REQUIREMENTS
Site accommodation
Site accommodation
B Charges ITEM
D Cleaning ITEM
K Charges ITEM
L Cleaning ITEM
Q Consumables ITEM
Intercontinental Resort Hotel
Mina Al Arab, Ras Al Khaimah
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
To Collection
EMPLOYER'S REQUIREMENTS
Site records
Site records
Handover requirements
To Collection
To Collection
Staff travel
To Collection
Site establishment
Site accommodation
To Collection
Site establishment
Site accommodation
To Collection
Site establishment
IT systems
L Stationery. ITEM
N Postage. ITEM
To Collection
Site establishment
Brought in services
G Catering. ITEM
Sundries
To Collection
Site establishment
Sundries
A Shelters. ITEM
Intercontinental Resort Hotel
Mina Al Arab, Ras Al Khaimah
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
K Charges. ITEM
To Collection
Site establishment
A Attendance. ITEM
Temporary drainage
To Collection
Site establishment
Temporary drainage
Security
Security staff
Security equipment
To Collection
Security
Safety programme
Q Nurse ITEM
Intercontinental Resort Hotel
Mina Al Arab, Ras Al Khaimah
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
R Traffic marshals. ITEM
To Collection
Safety programme
To Collection
G Surveys. ITEM
Setting out
To Collection
Setting out
Protection of works
Samples
To Collection
Samples
Mechanical plant
Intercontinental Resort Hotel
Mina Al Arab, Ras Al Khaimah
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
Tower cranes
M Ties ITEM
To Collection
Mechanical plant
Tower cranes
Mobile cranes
F Attendance. ITEM
Hoists
To Collection
Mechanical plant
Hoists
Access plant
Concrete plant
To Collection
Mechanical plant
Intercontinental Resort Hotel
Mina Al Arab, Ras Al Khaimah
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
Other plant
Temporary works
Access scaffolding
Temporary works
MC Site records
Site records
K Photography ITEM
To Collection
Intercontinental Resort Hotel
Mina Al Arab, Ras Al Khaimah
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
Handover
Post-completion services
J Handyman. ITEM
L Insurances. ITEM
Cleaning
Site tidy
To Collection
Cleaning
Site tidy
Building clean
Fees
To Collection
Charges
Site services
Temporary works
Multi-service gang
E Ganger. ITEM
F Labour. ITEM
Works insurances
To Collection
Works insurances
Other insurances
Intercontinental Resort Hotel
Mina Al Arab, Ras Al Khaimah
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
To Collection
Other insurances
Bonds
Guarantees
Warranties
To Collection
COLLECTION
TO GENERAL SUMMARY
Bill No. 1 - Page 25
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Rev.01
20 Sep. 2017
AMOUNT AED
Bill No. 2 MAIN HOTEL
MAIN CONTRACT
INTERCONTINENTAL RESORT HOTEL
RAK PROPERTIES
To Collection
Bill No. 2 - Page 1
EARTHWORK
A Generally 6474 m3
FILLING
B Generally 86320 m3
SURFACE PREPARATION
Anti-termite treatment
C Generally 21580 m2
To Collection
Collection
Blinding
A 75 thick 21580 m2
Pile caps
C 450 thick 6 m3
D 900 thick 27 m3
Raft Foundation
Blinding
J 50 thick 21580 m2
POURED CONCRETE: SUPERSTRUCTURE
To Collection
A Slabs 11919 m3
B Beams 7656 m3
D Columns 2815 m3
E Walls 5434 m3
REINFORCEMENT: SUBSTRUCTURE
REINFORCEMENT: SUPERSTRUCTURE
J Columns 546097 kg
K Walls 596600 kg
L Slabs 1382022 kg
M Beams 1623119 kg
To Collection
REINFORCEMENT: SUPERSTRUCTURE
SHUTTERING: SUBSTRUCTURE
SHUTTERING: SUPERSTRUCTURE
To Collection
SUNDRIES
Generally
Walls
External Walls
Slabs
Floors
To Collection
SUNDRIES
A Item deleted
Collection
To Collection
Walls
C generally 333 m2
To Collection
Collection
STRUCTURAL METALWORK
A Item deleted
Canopy
Canopy
Walls
E W3 352 m2
To Collection
Generally
E Item deleted
Metal mesh;
Ceilings
F C9 74 m2
Generally
To Collection
Generally
Generally
G Item Deleted
H Item Deleted
To Collection
F 50 dia 591 m
To Collection
Collection
To Summary
STRUCTURAL TIMBERS
Timber Cladding
Timber Cladding
C D5 - 4000 high 27 no
Feature wall
To Summary
WATERPROOFING
Pile Caps
C Horizontally 23148 m2
D Vertically 6415 m2
E Horizontally 10649 m2
Balcony waterproofing
F Horizontally 2197 m2
G Horizontally 330 m2
H Vertically 443 m2
J Horizontally 2156 m2
K Horizontally 2465 m2
L Vertically 5409 m2
To Collection
WATERPROOFING
A Horizontally 203 m2
B Vertically 424 m2
Service rooms
C Horizontally 655 m2
D Vertically 374 m2
E Horizontally 10649 m2
F Horizontally 2197 m2
G Horizontally 415 m2
H Horizontally 655 m2
Cementitious waterproofing
J Horizontally 220 m2
K Vertically 291 m2
J Horizontally 688 m2
K Vertically 1832 m2
To Collection
WATERPROOFING
Roof waterproofing
A Horizontally 2862 m
Balcony waterproofing
B Horizontally 3250 m
Polythene Sheet
Coverings to insulation
C Flat 12642 m2
Roof waterproofing
D Horizontal 10649 m2
Balcony waterproofing
E Horizontal 2197 m2
Overlaid Coverings
F Flat 1457 m2
GRP lining
G Horizontally 763 m2
H Vertically 1940 m2
To Collection
Bill No. 2 - Page 21
INSULATION
Roof waterproofing
A Horizontal 10649 m2
Balcony waterproofing
B Horizontal 2197 m2
Floor
C Horizontal 10305 m2
Ceiling
D Horizontal 10305 m2
Aluminium Flashing
Roofs
E Generally 3301 m2
To Collection
Bill No. 2 - Page 22
Collection
DOORS
Internal Doors
S 900 x 2200 2 no
T 950 x 2200 4 no
U 1000 x 2200 1 no
V 1100 x 2200 1 no
W 1450 x 2197 1 no
X 1525 x 2200 1 no
Y 1950 x 2200 1 no
To Collection
DOORS
Internal Doors
Doors
N 650 x 2200 2 no
P 750 x 2200 3 no
Q 750 x 2155 3 no
R 850 x 2155 1 no
S 850 x 2200 24 no
T 850 x 2825 1 no
To Collection
DOORS
Internal Doors
Doors
A 850 x 2725 1 no
B 900 x 2200 11 no
C 900 x 2611 2 no
D 950 x 2200 21 no
E 1150 x 2155 1 no
F 1525 x 2200 1 no
G 1600 x 2200 1 no
H 1850 x 2200 1 no
J 1950 x 2925 3 no
K D-C02/042-01 1 no
L D-A02/090-01 1 no
Sliding Doors
DOORS
Internal Doors
R 1050 x 2200 2 no
To Collection
DOORS
Internal Doors
Doors
To Collection
DOORS
Internal Doors
Doors
J 1050 x 2200 19 no
Doors
P 1050 x 2200 2 no
Sliding Doors
Q D-16 1 no
To Collection
DOORS
Internal Doors
Doors
Sliding Doors
K D-15 3 no
DOORS
A D-17 1 no
Doors
C D-17 3 no
WINDOWS
As Engineer details
Appropriate details
Windows
To Collection
WINDOWS
Windows
J Type W-30k 12 no
WINDOWS
C Type W-20b 1 no
D Type W-21 1 no
To Collection
WINDOWS
K Type W-140 1 no
To Collection
WINDOWS
G Type W-19 1 no
H Type W-20 1 no
J Type W-20a 1 no
To Collection
WINDOWS
U Type W-212 5 no
To Collection
WINDOWS
B Type W-10a 1 no
To Collection
WINDOWS
A Item Deleted
B Item Deleted
Aluminium framed fixed glazed panel with two equal
fixed panels on top and bottom panel and top hung
window in the middle including framing to opening,
all necessary accessories, finishes and
ironmongeries
To Collection
WINDOWS
To Collection
WINDOWS
A Item Deleted
B Item Deleted
To Collection
WINDOWS
To Collection
WINDOWS
E Item Deleted
To Collection
WINDOWS
B Type W-163 1 no
Louvred Panels
To Collection
WINDOWS
Louvred Panels
To Collection
WINDOWS
Louvred Panels
Louvred Panels
Louvred Panels
To Collection
WINDOWS
Louvred Panels
Louvred Panels
Louvred Panels
Louvred Panels
To Collection
Collection
To Summary
BACKGROUNDS (INTERNALLY)
Walls
A W07 32904 m2
BACKGROUNDS (EXTERNALLY)
40 mm thick
Walls
A Roof 1609 m2
Soffit
D on ceilings 6662 m2
FINISHINGS (INTERNALLY)
Dividing Strips
E Generally 479 m
F F1 741 m2
To Collection
FINISHINGS (INTERNALLY)
Floors
A F2 505 m2
Walls
C W10 39 m2
Skirting
Floors
E F5 529 m2
Walls
F W02 1956 m2
Skirting
Walls
H W05 4105 m2
To Collection
FINISHINGS (INTERNALLY)
A F15 239 m2
Skirting
Floors
C F3 1903 m2
Skirting
Skirting
E S3 1563 m
Walls
F W03 2450 m2
Floors
G F4 6638 m2
To Collection
FINISHINGS (INTERNALLY)
A F6 924 m2
Walls
B W08 10094 m2
Skirting
C S7 3565 m
D S8 2424 m
S6
E horizontal 137 m
Concrete sealer;
Floors
F F10 1602 m2
Skirting
Floors
H F8 12135 m2
To Collection
FINISHINGS (INTERNALLY)
Paint; Acrylic emulsion paint finish, including 1 no.
coat primer and 2 no. coat finish
Walls
A W01 19566 m2
Ceilings
C C1 2332 m2
D C8 41 m2
Walls
E W06 3086 m2
Ceilings
F C11 11109 m2
Floors
G F9 688 m2
Walls
H W09 1575 m2
Ceilings
J C10 687 m2
To Collection
FINISHINGS (INTERNALLY)
Tiles; Mineral fibre acoustic tiles, with revealed edge
Ceilings
A C4 45 m2
Ceilings
B C6 5678 m2
Ceilings
C C5 597 m2
Exposed structure
Ceilings
D C12 4670 m2
Walls
E generally 1481 m
Floors
F generally 300 m2
G Floors 216 m2
H Walls 1348 m2
J Skirtings 269 m
K Ceilings 216 m2
To Collection
A MS3 1448 m
FINISHINGS (EXTERNALLY)
Terrace tile;
Floors
Walls
C W1 23301 m2
Walls
D W2 531 m2
Walls
To Collection
FINISHINGS (EXTERNALLY)
Walls
Roofs
Walls
Walls
To Collection
FINISHINGS (EXTERNALLY)
Walls
Walls
Roofs
C F17 3170 m2
Concrete pavers
Roofs
Walls
E generally 36 m2
Walls
To Collection
A Item Deleted
To Collection
Collection
To Summary
Bill No. 2 - Page 59
GENERALLY
A Item Deleted
Wheel Stoppers
Type A (Straight)
Type D (Straight/Right)
Type E (Straight/Left)
Type F (Left/Right)
To Collection
Bill No. 2 - Page 60
GENERALLY
Speed Hump
A 6000 length 1 no
Carpark Lines
Carpark Lines
B 75 wide 3791 no
Bollard
K 1200 high 12 no
L 4000 long 3 no
To Collection
GENERALLY
A 3000 long 1 no
B 800 long 6 no
E 3000 long 1 no
PARTITIONS
F Item Deleted
Partitioning
G generally 15 no
Bathroom Accessories
Supply and install all Sanitary Ware as shown on the
drawings and specified required for a complete
installation as indicated.
J Clothing hook 68 no
K Bathroom mirror Item
To Collection
Collection
Specialist equipment
Anchor system
Collection
GENERALLY
Furniture
Generally
LIFT INSTALLATION
Public Lift
A PL-01 1 no
Public Lift
B PL-02 1 no
C PL-03 1 no
D PL-04 1 no
E PL-07 1 no
F PL-08 1 no
Public/Firemans Lift
G PL-09 1 no
Public Lift
H PL-05 1 no
J PL-06 1 no
To Collection
LIFT INSTALLATION
Service Lift
A SL-01 1 no
B SL-02 1 no
Service Lift
C SL-03 1 no
Service/Firemans Lift
D SL-04 1 no
E SL-05 1 no
Service Lift
F SL-06 1 no
To Collection
LIFT INSTALLATION
Service/Firemans Lift
A SL-08 1 no
B SL-09 1 no
Sundries
Generally
Generally
To Collection
LIFT INSTALLATION
Generally
Collection
To Summary
RAINWATER INSTALLATION
To Summary
Summary
To General Summary
EARTHWORK
A Generally 1159 m3
FILLING
B Generally 2704 m3
SURFACE PREPARATION
Anti-termite treatment
C Generally 3863 m2
To Summary
Bill No. 3 - Page 1
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
Blinding
A 75 thick 3863 m2
Raft Foundation
Raft Thickening
D Generally 86 m3
Blinding
E 50 thick 3861 m2
G Walls 43 m3
H Slabs 641 m3
J Beams 382 m3
To Collection
Bill No. 3 - Page 2
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
POURED CONCRETE: SUPERSTRUCTURE
B Columns 239 m3
REINFORCEMENT: SUBSTRUCTURE
REINFORCEMENT: SUPERSTRUCTURE
E Columns 45658 kg
F Walls 3810 kg
G Slabs 60675 kg
H Beams 56885 kg
SHUTTERING: SUBSTRUCTURE
To Collection
Bill No. 3 - Page 3
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SHUTTERING: SUBSTRUCTURE
SHUTTERING: SUPERSTRUCTURE
To Collection
Bill No. 3 - Page 4
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
Collection
To Summary
To Summary
Gates
B 50 dia 328 m
Pergola
To Summary
Bill No. 3 - Page 7
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION G - THERMAL AND
MOISTURE PROTECTION
WATERPROOFING
A Horizontally 3863 m2
B Vertically 345 m2
Polythene Sheet
Coverings to insulation
C flat 3863 m2
Overlaid Coverings
D Flat 3863 m2
INSULATION
Insulation; Rigid
Generally
E flat 3863 m2
To Summary
Bill No. 3 - Page 8
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION H - DOORS AND WINDOWS
DOORS
External Doors
WINDOWS
As Engineer details
C Item Deleted
D Item Deleted
Aluminium Windows
To Collection
Bill No. 3 - Page 9
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
WINDOWS
Aluminium Windows
SCREENS
To Collection
Bill No. 3 - Page 10
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION H - DOORS AND WINDOWS
Collection
To Summary
BACKGROUNDS (INTERNALLY)
Render; two coat work 18 mm thick
Walls
A W07 80 m
B 40mm thick 28 m
BACKGROUNDS (EXTERNALLY)
Walls
C W07 17708 m
FINISHINGS (INTERNALLY)
Dividing Strips
D Generally 99 m
Floors
E F15 28 m2
Skirting
Walls
G W05 80 m2
Paint; Acrylic emulsion paint finish, including 1 no.
coat primer and 2 no. coat finish
Ceilings
H C1 17 m2
To Collection
Bill No. 3 - Page 12
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
FINISHINGS (EXTERNALLY)
Walls
A W1 16221 m2
Walls
B W2 1487 m2
Walls
Walls
Ceiling
E C7 17 m2
To Collection
Collection
To Summary
Summary
To General Summary
EARTHWORK
A Generally 245 m3
FILLING
B Generally 571 m3
SURFACE PREPARATION
Anti-termite treatment
C Generally 815 m2
To Summary
Bill No. 4 - Page 1
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
Raft Foundation
B Pad footings 20 m3
Blinding
C 50 thick 815 m2
D Slabs 325 m3
E Walls 84 m3
F Columns 22 m3
G Ramp 106 m3
To Collection
REINFORCEMENT: SUBSTRUCTURE
REINFORCEMENT: SUPERSTRUCTURE
C Columns 5475 kg
D Walls 4890 kg
E Slabs 31782 kg
F Beams 19620 kg
SHUTTERING: SUBSTRUCTURE
SHUTTERING: SUPERSTRUCTURE
To Collection
SHUTTERING: SUPERSTRUCTURE
To Collection
Collection
To Summary
To Summary
Walls
A W3 17 m2
Generally
Generally
To Summary
Bill No. 4 - Page 7
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION G - THERMAL AND MOISTURE
PROTECTION
WATERPROOFING
A Horizontally 1403 m2
B Vertically 40 m2
Polythene Sheet
Coverings to insulation
C Flat 1403 m2
D Horizontally 1403 m2
E Horizontally 1403 m2
Roof waterproofing
F Horizontally 340 m2
INSULATION
Generally
G Flat 1403 m2
To Summary
Bill No. 4 - Page 8
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION H - DOORS AND WINDOWS
DOORS
External Doors
WINDOWS
As Engineer details
SCREENS
To Collection
SCREENS
To Collection
SCREENS
To Collection
Collection
To Summary
BACKGROUNDS (INTERNALLY)
Ceilings
A C7 96 m2
FINISHINGS (INTERNALLY)
Dividing Strips
B Generally 4 m
Floors
C F1 51 m2
Floors
D F5 5 m2
Walls
E W02 14 m2
Skirting
To Collection
FINISHINGS (INTERNALLY)
Walls
A W05 245 m2
Floors
B F11 22 m2
Floors
C F15 48 m2
Floors
D F3 30 m2
Skirting
E S3 136 m
Ceilings
F C1 31 m2
To Collection
FINISHINGS (INTERNALLY)
Floors
A F4 78 m2
B F6 102 m2
Walls
C W08 125 m2
Skirting
D S7 84 m
E S8 244 m
Concrete sealer;
Floors
F F10 8 m2
Walls
G W01 136 m2
Ceilings
H C6 17 m2
Ceilings
J C5 79 m2
To Collection
FINISHINGS (INTERNALLY)
Exposed structure
Ceilings
A C12 95 m2
FINISHINGS (EXTERNALLY)
Walls
Walls
C D14 11 m2
To Collection
Collection
To Summary
Summary
To General Summary
FIRE FIGHTING
Piping
K 75mm FF Piping 79 m
To Collection
2
Bill No. 5 - Page 2
Valves
Sprinkler Heads
Devices
To Collection
3
Bill No. 5 - Page 3
FIRE EXTINGUSHERS
Cabinets
To Collection
4
Bill No. 5 - Page 4
Pumps
Tanks
Assemblies
Supply and install all Clean Agent & Foam Fire Fighting
Systems as shown on the drawings and/or as specified
including but not limited to all design, engineering,
authority approvals, storage tanks, piping, supports,
valves, gauges, ells, tees, reducers, heads, controls,
pull stations, detectors, alarms, interfacing and any
other items required for a complete installation as
indicated. Testing and commissioning shall be
included in all rates.
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
7
Bill No. 5 - Page 7
COLLECTION
To Summary
8
Bill No. 5 - Page 8
PLUMBING
DOMESTIC WATER
PLUMBING (Cont'd)
Piping System
Piping
PLUMBING (Cont'd)
DOMESTIC WATER
Devices
U Valve Box 6 No
To Collection
11
Bill No. 5 - Page 11
PLUMBING (Cont'd)
DOMESTIC WATER
To Collection
12
Bill No. 5 - Page 12
PLUMBING (Cont'd)
DOMESTIC WATER
Equipment
To Collection
13
Bill No. 5 - Page 13
PLUMBING (Cont'd)
DOMESTIC WATER
Equipment (Cont'd)
Tanks
PLUMBING (Cont'd)
SANITARY DRAINAGE
Acoustic Insulation
To Collection
15
Bill No. 5 - Page 15
PLUMBING (Cont'd)
SANITARY DRAINAGE
H FT/FD 1,062 No
J PRD 11 No
K FCO 148 No
Q Tundish Drain 13 No
R SRWO 5 No
U CPFD 16 No
W BD 306 No
To Collection
16
Bill No. 5 - Page 16
PLUMBING (Cont'd)
SANITARY DRAINAGE
Devices
Valves
H IC Inspection Chambers 2 No
J Floor gully 5 No
K Sand Trap 2 No
L Gully Trap 51 No
M Pressure Break MH 3 No
N Foul Water MH 51 No
P Storm Water MH 18 No
Q Waste Water MH 2 No
To Collection
17
Bill No. 5 - Page 17
PLUMBING (Cont'd)
SANITARY DRAINAGE
Sanitary Ware
C Bidet w/HS 43 No
F W/B (ADA) 3 No
G Ablution Sink 6 No
H SH 355 No
J BT 319 No
K Urinal 16 No
L Jacuzzi 5 No
To Collection
18
Bill No. 5 - Page 18
PLUMBING (Cont'd)
STORM WATER DRAINAGE
uPVC Pipe
G RWO 400x400 13 No
H RWO Dome 79 No
PLUMBING (Cont'd)
STORM WATER DRAINAGE
Pumps
PLUMBING (Cont'd)
LPG GAS
PIPING SYSTEM
Site
Buildings
To Collection
21
Bill No. 5 - Page 21
PLUMBING (Cont'd)
LPG GAS
EQUIPMENT / TANKS
B Vaporizer 30KW 1 No
To Collection
22
Bill No. 5 - Page 22
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
PLUMBING (Cont'd)
LPG GAS
EQUIPMENT / TANKS
PLUMBING (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
24
Bill No. 5 - Page 24
PLUMBING (Cont'd)
COLLECTION
To Summary
25
Bill No. 5 - Page 25
HVAC
To Collection
26
Bill No. 5 - Page 26
HVAC (Cont'd)
HVAC (Cont'd)
CHW Equipment
To Collection
29
Bill No. 5 - Page 29
HVAC (Cont'd)
HVAC DUCTWORK
Rectangular Ductwork
A Galvanized Duct 0.6mm 19,894 m2
To Collection
30
Bill No. 5 - Page 30
HVAC (Cont'd)
Attenuators
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS
A SG 350 x 350mm 1 No
B SG 400 x 150mm 1 No
C SG 450 x 300mm 2 No
D SG 550 x 200mm 1 No
E SG 600 x 150mm 12 No
F SG 650 x 200mm 3 No
G SG 700 x 200mm 7 No
H SG 750 x 150mm 22 No
J SG 750 x 200mm 7 No
K SG 900 x 150mm 1 No
L SG 900 x 200mm 2 No
M SG 900 x 250mm 2 No
N SG 900 x 500mm 2 No
P SG 1050 x 150mm 1 No
Q SG 1200 x 200mm 2 No
R SG 1200 x 600mm 2 No
S SG 1200 x 1200mm 1 No
To Collection
32
Bill No. 5 - Page 32
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS (Cont'd)
Return Grill
G RG 350 x 350mm 2 No
H RG 400 x 150mm 1 No
J RG 450 x 300mm 2 No
K RG 550 x 200mm 1 No
L RG 600 x 150mm 13 No
M RG 650 x 200mm 2 No
N RG 750 x 150mm 22 No
P RG 750 x 200mm 4 No
Q RG 900 x 200mm 3 No
R RG 900 x 500mm 1 No
S RG 1050 x 150mm 1 No
T RG 1200 x 200mm 2 No
U RG 1200 x 600mm 2 No
V RG 1200 x 1200mm 1 No
To Collection
33
Bill No. 5 - Page 33
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS (Cont'd)
Return Grill
Extract Grill
E EG 250 x 150mm 1 No
F EG 900 x 300mm 10 No
G EG 300 x 1000mm 159 No
Disc valve
N DV-01 42 No
P DV-02 1 No
To Collection
34
Bill No. 5 - Page 34
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS (Cont'd)
Supply Diffuser
A SD4-1 66 No
B SD4-2 150 No
C SD4-3 967 No
D SD4-4 70 No
E SD4-5 6 No
F SD4-6 3 No
G SLD-1 565 No
H SLD-2 513 No
J SLD-3 523 No
K SLD-4 7 No
L SLD-6 3 No
To Collection
35
Bill No. 5 - Page 35
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS (Cont'd)
Return Diffuser
A RD4-1 29 No
B RD4-2 134 No
C RD4-3 950 No
D RD4-4 66 No
E RD4-5 6 No
F RD4-6 3 No
G RLD-6 3 No
H RLD-3 531 No
J RLD-2 493 No
K RLD-1 323 No
Extract Diffuser
L ED1-1 14 No
M ED2-A 1 No
N ED4-1 6 No
P ED4-2 5 No
Q ED4-3 5 No
R ELD4-4 1 No
S ELD-1 208 No
T FD4-2 1 No
To Collection
36
Bill No. 5 - Page 36
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS (Cont'd)
A FASL- 0.3m2 1 No
B FASL- 0.6m2 4 No
C FASL- 1.0m2 5 No
D FASL- 1.5m2 2 No
E FASL- 2.5m2 5 No
F FASL- 3.0m2 2 No
G FASL- 3.5m2 1 No
H FASL- 4.0m2 2 No
J FASL- 5.0m2 1 No
K FASL- 6.0m2 1 No
L FASL- 7.0m2 3 No
M FASL- 8.0m2 6 No
N FASL- 9.0m2 1 No
P FASL- 11.5m2 1 No
To Collection
37
Bill No. 5 - Page 37
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS (Cont'd)
A EAL- 0.1m2 1 No
B EAL- 0.5m2 6 No
C EAL- 0.6m2 1 No
D EAL- 0.7m2 1 No
E EAL- 1.0m2 6 No
F EAL- 1.5m2 2 No
G EAL- 2.0m2 1 No
H EAL- 2.5m2 2 No
J EAL- 3.0m2 1 No
K EAL- 8.0m2 2 No
L EAL- 1800x2000 7 No
M 300 x 400mm 22 No
N 400 x 300mm 21 No
P 1000x1000mm 8 No
To Collection
38
Bill No. 5 - Page 38
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS (Cont'd)
FIRE DAMPERS
A 150 x 150mm 78 No
B 200 x 150-200mm 17 No
C 250 x 150-200mm 18 No
D 300 x 150-200mm 5 No
E 350 x 150-300mm 5 No
F 400 x 200mm 2 No
G 450 x 200-250mm 6 No
H 500 x 200-350mm 7 No
J 550 x 200-400mm 6 No
K 650 x 250mm 2 No
L 750 x 250mm 1 No
M 800 x 300mm 1 No
N 1450 x 400mm 1 No
P 1650 x 500mm 1 No
MOTORIZED DAMPERS
T 300 x 150-300mm 21 No
To Collection
39
Bill No. 5 - Page 39
HVAC (Cont'd)
MOTORIZED DAMPERS
A 350 x 200-250mm 12 No
B 400 x 200-250mm 8 No
C 450 x 200-400mm 11 No
D 500 x 350-500mm 5 No
E 550 x 250-400mm 11 No
F 600 x 400-500mm 3 No
G 650 x 250-450mm 2 No
H 700 x 400-600mm 3 No
J 750 x 500-550mm 7 No
K 800 x 300-600mm 5 No
L 900 x 500mm 4 No
M 750 x 1050mm 1 No
N 1000 x 700mm 2 No
P 1050 x 350mm-600 5 No
Q 1200 x 600mm 1 No
R 1250 x 800mm 1 No
S 1300 x 750mm 1 No
U 1550 x 500mm 1 No
V 1750 x 500mm 2 No
To Collection
40
Bill No. 5 - Page 40
HVAC (Cont'd)
HVAC EQUIPMENT
To Collection
41
Bill No. 5 - Page 41
HVAC (Cont'd)
To Collection
42
Bill No. 5 - Page 42
HVAC (Cont'd)
To Collection
43
Bill No. 5 - Page 43
HVAC (Cont'd)
HVAC EQUIPMENT(Cont'd)
FANS
A CPEF 7,001- 7,500 l/s 3 No
To Collection
44
Bill No. 5 - Page 44
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
HVAC (Cont'd)
FANS (Cont'd)
Q VAV-GF-MH-AD-01 to VAV-L02-BR-16 18 No
R CAV-GF-MH-01 to CAV-L02-BR-01 2 No
Sensors
X CO2 Sensors 46 No
To Collection
45
Bill No. 5 - Page 45
HVAC (Cont'd)
HVAC (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
47
Bill No. 5 - Page 47
HVAC (Cont'd)
COLLECTION
To Summary
48
Bill No. 5 - Page 48
ELECTRICAL
ELECTRICAL (Cont'd)
CABLES
LV Switchgear
A 3200A 4P (LV-MDB-A1) 1 No
B 3200A 4P (LV-MDB-A2) 1 No
C 3200A 4P (LV-MDB-B1) 1 No
D 3200A 4P (LV-MDB-B2) 1 No
E 3200A 4P (LV-MDB-B3) 1 No
F 3200A 4P (LV-MDB-C1) 1 No
G 3200A 4P (LV-MDB-C2) 1 No
H 3200A 4P (LV-MDB-C3) 1 No
J 2500A 4P EMDB 1 No
K 1600A 4P EMDB 1 No
L 3200A SMDB 1 No
M 630A SMDB 2 No
N 500A SMDB 5 No
P 400A SMDB 4 No
Q 350A SMDB 1 No
R 320A SMDB 1 No
S 300A SMDB 12 No
T 250A SMDB 5 No
U 225A SMDB 3 No
W 200A SMDB 2 No
To Collection
50
Bill No. 5 - Page 50
ELECTRICAL (Cont'd)
LV Switchgear (Cont'd)
A 160A SDBD 2 No
B 125A SMDB 2 No
C 100A SMDB 1 No
D 80A SMDB 3 No
E 63A SMDB 1 No
F 630A ESMDB 2 No
G 400A ESMDB 2 No
H 300A ESMDB 1 No
J 200A ESMDB 2 No
K 160A ESDBD 1 No
L 125A ESMDB 2 No
M 80A ESMDB 2 No
N 63A ESMDB 1 No
P 630A MCC 1 No
Q 250A MCC 2 No
R 80A MCC 2 No
S 63A MCC 1 No
T 225A EMCC 1 No
U 125A EMCC 1 No
V 100A EMCC 1 No
W 80A EMCC 2 No
X 40A EMCC 3 No
To Collection
51
Bill No. 5 - Page 51
ELECTRICAL (Cont'd)
LV Switchgear (Cont'd)
A 160A DB PANEL 2 No
B 125A DB PANEL 2 No
C 100A DB PANEL 1 No
D 80A DB PANEL 12 No
E 63A DB PANEL 19 No
H 32A DB PANEL 2 No
P 400A FP 1 No
Q 350A FP 1 No
R 300A FP 2 No
S 250A FP 2 No
T 200A FP 2 No
U 63A FP 2 No
V 40A FP 10 No
To Collection
52
Bill No. 5 - Page 52
ELECTRICAL (Cont'd)
D 2500A 4P ATS 1 No
E 1600A 4P ATS 1 No
F Harmonic Filters 8 No
Generator
UPS Units
J UPS 4KW 29 No
K UPS 20KW 1 No
L UPS 25 KW 2 No
M UPS 45KW 2 No
To Collection
53
Bill No. 5 - Page 53
ELECTRICAL (Cont'd)
LV CABLES Building
To Collection
54
Bill No. 5 - Page 54
ELECTRICAL (Cont'd)
To Collection
55
Bill No. 5 - Page 55
ELECTRICAL (Cont'd)
To Collection
56
Bill No. 5 - Page 56
ELECTRICAL (Cont'd)
To Collection
57
Bill No. 5 - Page 57
ELECTRICAL (Cont'd)
Cable Tray
Trunking
ELECTRICAL (Cont'd)
To Collection
59
Bill No. 5 - Page 59
ELECTRICAL (Cont'd)
To Collection
60
Bill No. 5 - Page 60
ELECTRICAL (Cont'd)
Isolators
To Collection
61
Bill No. 5 - Page 61
ELECTRICAL (Cont'd)
LIGHTING
A A1 313 No
B A1E 165 No
C A2 150 No
D A2E 96 No
E AE 127 No
F AM01 179 No
G AM02 14 No
H D1 41 No
J D2 182 No
K D2/E 52 No
L DL01 593 No
M DL02 1,458 No
N DL03 332 No
P DL04 2,189 No
Q DR01 236 No
R DR02 92 No
S DR03 15 No
T DR04 9 No
U DR05 68 No
To Collection
62
Bill No. 5 - Page 62
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
A DR06 20 No
B DR07 74 No
C DR08 78 No
D DR09 19 No
E DR10 20 No
F DR11 19 No
G DR12 4 No
H DR14 15 No
J DR15 20 No
K DR16 30 No
L DR17 39 No
M DR20 147 No
N DR22 68 No
P DR23 92 No
Q DR24 9 No
R DR25 23 No
S DR26 4 No
T DR27 210 No
U DR28 55 No
V DR29 16 No
W DR30 54 No
X DR31 8 No
Y DR32 9 No
To Collection
63
Bill No. 5 - Page 63
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
A DS01 10 No
B F01 276 No
C F1E 49 No
D F02 279 No
E F2-Wall 7 No
F F2E 183 No
G F2E-Wall 15 No
H F03 60 No
J F3E 19 No
K FL01 296 No
L FL02 45 No
M FL03 79 No
N FL04 26 No
P FL05 5 No
Q FL06 10 No
R FL07 4 No
S FL09 34 No
T JR01 1 No
U JR02 2 No
V JR03 8 No
W JR04 16 No
X L01 523 m
To Collection
64 Bill No. 5 - Page 64
63
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
A L02 66 m
B L03 18 m
C L04 364 m
D L05 288 m
E L06 68 m
F L07 12 m
G L08 74 m
H L09 49 m
J L10 14 m
K L11 56 m
L L13 12 m
M L16 11 m
N L19 100 m
P L20 2 m
Q L21 28 m
R L22 86 m
S L23 97 m
T L24 64 m
U LL01 9,202 m
V LM01A 7 No
W LM01B 2 No
X LM02 3 No
To Collection
65 Bill No. 5 - Page 65
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
A LM03 41 m
B LR02 12 No
C LR03 20 No
D LS01 30 m
E PL01 186 No
F PL02 15 No
G PL04 153 No
H PL05 8 No
J PL06 17 No
K PL07 3 No
L SD01 6 No
M SD02 4 No
N ST01 8 No
P ST02 7 No
Q T 42 No
R TL01 438 No
S TL02 185 No
T TL03 41 No
U TL04 2 No
V TL05 6 No
W TL06 2 No
X TL09 1 No
Y TM01 4 No
To Collection
66 Bill No. 5 - Page 66
1
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
A UB04 3 No
B UB06 150 No
C UB01 16 No
D UB02 136 No
E VS01 16 No
F VS02 3 No
G W01 37 No
H W03 146 No
J WR01 15 No
K WR02 12 No
L WR04 4 No
M WR05 6 No
N WR06 3 No
P WR07 3 No
Q WS01 638 No
R WS02 669 No
S WS03 6 No
T WS01 17 No
U WS02 42 No
V Kitchen Hood light 26 m
To Collection
67 Bill No. 5 - Page 67
1
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
A CL101A 1,346 m
B CL102A 1,825 m
C CL103A 135 m
D CL104A 109 m
E CM101A 21 No
F CM102A 2 No
G CP01A 11 No
H GR101A 37 No
J UW04A 15 m
K WM01A 14 No
L WM101A 30 No
M WM102A 54 No
N WM102B 92 No
P WM103A 8 No
Q WM104A 32 No
R WM105A 152 No
To Collection
68 Bill No. 5 - Page 68
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
A BL01A 8 No
B BL02A 4 No
C CM01A 62 No
D CM02A 68 m
E CM03A 23 No
F CM04A 3 No
G CM05A 4 No
H CM05B 4 No
J CP01A 19 No
K CP02A 1 No
L FM01A 98 m
M FM02A 60 m
N GM01A 300 No
P GM02A 128 No
Q GM03A 34 No
R GM04A 1 No
S GR01A 451 No
T GR02A 67 No
U GR03A 204 No
V GR04A 165 No
W GR05A 12 No
To Collection
69 Bill No. 5 - Page 69
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
A PL01A 12 No
B PL02A 6 No
C UW01A 142 No
D UW02A 74 No
E UW03A 302 No
F UW04A 310 m
G WM01A 345 No
H WM02A 6 No
J WM03A 20 No
To Collection
70
Bill No. 5 - Page 70
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
Fixtures
Cable Tray
ELECTRICAL (Cont'd)
Lightning Protection
ELECTICAL (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
73
Bill No. 5 - Page 73
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
ELECTRICAL (Cont'd)
COLLECTION
Carried Forward
74
Bill No. 5 - Page 74
1
Main Hotel
Intercontinental Resort Hotel Rev.01 - Main Hotel
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
ELECTRICAL (Cont'd)
COLLECTION (Cont'd)
Brought Forward
To Summary
75 Bill No. 5 - Page 75
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
TELECOM SYSTEM
Manholes
C 600 x 600 MH 7 No
D 1120 x 635 MH 2 No
E 2000 x 2000 MH 14 No
To Collection
76
Bill No. 5 - Page 76
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
To Collection
77
Bill No. 5 - Page 77
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
J Board Room 1 & 2 Audio Video System with all associated 1 Item
cables, tray and equipment
K BOH Meeting Room Audio Video System with all associated 1 Item
cables, tray and equipment
L BOH Training Room Audio Video System with all associated 1 Item
cables, tray and equipment
To Collection
78
Bill No. 5 - Page 78
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
TELEDATA OUTLETS
To Collection
79
Bill No. 5 - Page 79
1
Intercontinental Resort Hotel Rev.01 - Main Hotel
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
80
Bill No. 5 - Page 80
COLLECTION
H Combined Detector 93 No
To Collection
82
Bill No. 5 - Page 82
To Collection
83
Bill No. 5 - Page 83
CCTV SYSTEM
C PTZ Camera WP 3 No
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
86
Bill No. 5 - Page 86
COLLECTION
To MEP Summary
88
Bill No. 5 - Page 88
Bill No. 5 - Page 88
Hotel
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Hotel
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
Hotel
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Villa
Intercontinental Resort Hotel
RAK Properties
FIRE FIGHTING
Piping
B 32mm FF Piping 80 m
C 40mm FF Piping 88 m
Sprinkler Heads
Extinguishers
Cabinets
Assemblies
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
91
Bill No. 5 - Page 91
COLLECTION
Piping
Devices
Equipment
PLUMBING (Cont'd)
SANITARY DRAINAGE
G FD 128 No
H FCO 96 No
Devices
PLUMBING (Cont'd)
SANITARY DRAINAGE
Sanitary Ware
A W/C w/\HS 64 No
B Bidet w/HS 32 No
D SH 32 No
E BT 32 No
To Collection
95
Bill No. 5 - Page 95
PLUMBING (Cont'd)
STORM WATER DRAINAGE
uPVC Pipe
B RWO 110 32 No
PLUMBING (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
97
Bill No. 5 - Page 97
PLUMBING (Cont'd)
COLLECTION
HVAC
HVAC (Cont'd)
HVAC DUCTWORK
Rectangular Ductwork
GRILLS/DIFFUSSERS/LOUVERS
Return Grill
D RG 1000 x 300mm 32 No
E RG 900 x 200mm 64 No
F RG 600 x 300mm 32 No
Supply Grill
G SG 1500 x 300mm 32 No
H SG 900 x 200mm 64 No
J SG 600 x 200mm 32 No
Extract Diffuser
K ED4-1 32 No
L ED2-A 32 No
Supply Diffuser
M SD4-1 32 No
To Collection
100
Bill No. 5 - Page 100
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS (Cont'd)
A EAL 1.0m2 16 No
B EASL 0.1m2 16 No
Motorized Dampers
C 150x150 MD 32 No
D 200x150 MD 48 No
HVAC EQUIPMENT
FCU UNITS
FANS
Sensor
N Smoke sensor 16 No
To Collection
101
Bill No. 5 - Page 101
HVAC (Cont'd)
To Collection
102
Bill No. 5 - Page 102
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
103
Bill No. 5 - Page 103
HVAC (Cont'd)
COLLECTION
ELECTRICAL
LV SWITCHGREAR
A In Base Contract
LV CABLES Building
B In Base Contract
To Collection
105
Bill No. 5 - Page 105
ELECTRICAL (Cont'd)
LIGHTING
A DL02 128 No
B F01 16 No
C FL03 16 No
D FL05 16 No
E FL06 16 No
F FL07 16 No
G LL01 301 m
H PL02 16 No
J PL04 16 No
K PL06 16 No
L TL03 32 No
M WS01 32 No
N WS03 32 No
P Motion sensor 16 No
Q CL101A 97 m
R CL103A 93 m
S GR103A 144 No
To Collection
106
Bill No. 5 - Page 106
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
C Motion Sensor 16 No
ELECTRICAL (Cont'd)
Fixtures
Lightning Protection
F Piling Bonding 64 No
To Collection
107 Bill No. 5 - Page 107
ELECTICAL (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
108
Bill No. 5 - Page 108
ELECTRICAL (Cont'd)
COLLECTION
TELECOM SYSTEM
TELEDATA OUTLETS
To Collection
110
Bill No. 5 - Page 110
Additional Items
To Collection
111
Bill No. 5 - Page 111
COLLECTION
To Summary
112
Bill No. 5 - Page 112
Bill No. 5 - Page 112
C Heat Detector 32 No
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
114
Bill No. 5 - Page 114
COLLECTION
VILLA SUMMARY
To MEP Summary
116
Bill No. 5 - Page 116
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Chalet
Intercontinental Resort Hotel
RAK Properties
FIRE FIGHTING
Piping
B 40mm FF Piping 20 m
C 50mm FF Piping 15 m
D 65mm FF Piping 55 m
Sprinkler Heads
Extinguishers
Cabinets
Assemblies
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
119
Bill No. 5 - Page 119
COLLECTION
PLUMBING
DOMESTIC WATER
Piping System
Piping
Devices
Equipment
PLUMBING (Cont'd)
SANITARY DRAINAGE
G FD 25 No
H FCO 10 No
Devices
Sanitary Ware
L Bidet w/HS 10 No
N SH 10 No
P BT 5 No
To Collection
122
Bill No. 5 - Page 122
PLUMBING (Cont'd)
SANITARY DRAINAGE
uPVC Pipe
PLUMBING (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
124
Bill No. 5 - Page 124
PLUMBING (Cont'd)
COLLECTION
Bill No. 5 - Page 121
HVAC
HVAC (Cont'd)
HVAC DUCTWORK
Rectangular Ductwork
C Duct Insulation 80 m2
GRILLS/DIFFUSSERS/LOUVERS
Return Grill
D RG 1350 x 250mm 5 No
E RG 1600 x 200mm 10 No
Supply Grill
F SG 1350 x 250mm 5 No
G SG 1600 x 200mm 10 No
Extract Grill
H EXG No
Supply Diffuser
Kitchen P/A CW Water boost. pump Set 2D/S Assembly
J SD4-4 5 No
Return Diffuser
K RD4-4 5 No
L EAL 5 No
M FASL 10 No
Motorized Dampers
N MD 150 x 100mm 15 No
O MD 200 x 100mm 5 No
To Collection
127
Bill No. 5 - Page 127
HVAC (Cont'd)
HVAC EQUIPMENT
FCU UNITS
FANS
E EXF 0- 50 l/s 1 No
Sensors
To Collection
128
Bill No. 5 - Page 128
HVAC (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
129
Bill No. 5 - Page 129
HVAC (Cont'd)
COLLECTION
ELECTRICAL
LV SWITCHGREAR
A In Base Contract
LV CABLES Building
B In Base Contract
ELECTRICAL (Cont'd)
LIGHTING
Supply and install all Lighting Fixtures, Wiring Points
and Lighting Control as shown on the drawings and
specified including but not limited to all support,
mounting hardware, outlets, boxes, back boxes,
devices, trim, cables, containment, switches, dimmers,
control panels and any other items as required for a
complete installation as indicated.
A DL02 50 No
B DL03 5 No
C F2 5 No
D FL03 5 No
E FL06 5 No
F FL08 5 No
G LL01 61 m
H PL04 5 No
J PL05 5 No
K PL06 5 No
L PL07 5 No
M TL06 5 No
N WS01 10 No
P WS02 10 No
Q WS03 5 No
R CL102A 810 m
S CM102A 10 No
T GR102A 60 No
U UW101A 20 No
V WM104A 5 No
To Collection
132
Bill No. 5 - Page 132
ELECTRICAL (Cont'd)
Fixtures
Lightning Protection
C Piling Bonding 20 No
To Collection
133
Bill No. 5 - Page 133
ELECTRICAL (Cont'd)
Additional Items
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up to the lump sum tender price for this
section of the works. Should the tenderer fail to insert
any items here it will be deemed that the lump sum
price for the tender includes all items and no
subsequent claim for any additional item will be
entertained.
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
134
Bill No. 5 - Page 134
ELECTRICAL (Cont'd)
COLLECTION
TELECOM SYSTEM
TELEDATA OUTLETS
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
137
Bill No. 5 - Page 137
COLLECTION
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
140
Bill No. 5 - Page 140
COLLECTION
CHALET SUMMARY
To MEP Summary
142
Bill No. 5 - Page 142
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Seafood Restaurant
Intercontinental Resort Hotel
RAK Properties
FIRE FIGHTING
Piping
A 25mm FF Piping 80 m
B 32mm FF Piping 20 m
C 40mm FF Piping 35 m
D 50mm FF Piping 40 m
E 65mm FF Piping 30 m
F 80mm FF Piping 5 m
G 100mm FF Piping 10 m
Sprinkler Heads
Extinguishers
Cabinets
Assemblies
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
145
Bill No. 5 - Page 145
COLLECTION
PLUMBING
DOMESTIC WATER
Piping System
Piping
Devices
Valves
Equipment
PLUMBING (Cont'd)
SANITARY DRAINAGE
PLUMBING (Cont'd)
SANITARY DRAINAGE
A FD 24 No
B FCO 8 No
Devices
PLUMBING (Cont'd)
SANITARY DRAINAGE
Sanitary Ware
A W/C w/\HS 5 No
C Urinal 2 No
To Collection
150
Bill No. 5 - Page 150
PLUMBING (Cont'd)
uPVC Pipe
C RWO 110 6 No
D RWO 200 6 No
To Collection
151
Bill No. 5 - Page 151
PLUMBING (Cont'd)
LPG GAS
PIPING SYSTEM
Buildings
PLUMBING (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
153
Bill No. 5 - Page 153
PLUMBING (Cont'd)
COLLECTION
HVAC
To Collection
155
Bill No. 5 - Page 155
HVAC (Cont'd)
HVAC DUCTWORK
Rectangular Ductwork
Attenuators
Motorized Dampers
G MD 350 x 200mm 1 No
H MD 400 x 150mm 2 No
Fire Dampers
J FD 150 x 150mm-200mm 5 No
K FD 200 x 150mm 2 No
L FD 200 x 200mm 1 No
M FD 250 x 200mm 1 No
N FD 350 x 200mm-250mm 4 No
P FD 450 x 300mm 1 No
Q FD 1200 x 700mm 1 No
R FD 1250 x 700mm 3 No
To Collection
156
Bill No. 5 - Page 156
HVAC (Cont'd)
GRILLS/DIFFUSSERS/LOUVERS
Return Grill
A RG 600 x 150mm 1 No
B RG 400 x 150mm 1 No
Supply Grill
C SG 600 x 150mm 1 No
D SG 400 x 150mm 1 No
Extract Grill
Return Diffuser
G RLD-3 53 No
H RD4-2 1 No
Supply Diffuser
J SLD-3 39 No
K SD4-4 11 No
Extract Diffuser
L ED1-1 2 No
M FASL 2.0m2 1 No
N FASL 7.0m2 1 No
Extract Louver
P EAL 1.5m2 1 No
To Collection
157
Bill No. 5 - Page 157
HVAC (Cont'd)
HVAC EQUIPMENT
FCU UNITS
To Collection
158
Bill No. 5 - Page 158
HVAC (Cont'd)
HVAC (Cont'd)
Additional Items
The tenderer is to detail below any additional items with
quantities and rates not previously included to complete
the build up to the lump sum tender price for this
section of the works. Should the tenderer fail to insert
any items here it will be deemed that the lump sum
price for the tender includes all items and no
subsequent claim for any additional item will be
entertained.
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
160
Bill No. 5 - Page 160
HVAC (Cont'd)
COLLECTION
LV SWITCHGREAR
In Base Contract
LV CABLES Building
In Base Contract
Cable Tray
To Collection
162 Bill No. 5 - Page 162
ELECTRICAL (Cont'd)
LIGHTING
A A1 9 No
B A1E 7 No
C A2 7 No
D A2E 6 No
E D 3 No
F D2 2 No
G DR08 10 No
H DR13 20 No
J DR22 10 No
K DR23 12 No
L F2 8 No
M F2E 6 No
N L01 109 m
P L19 3 m
Q PL03 13 No
R PL04 123 No
S PL05 5 No
T Motion sensor 10 No
U CM04A 2 No
V CP01A 4 No
W CR101A 10 No
X FM01A 7 m
Y WM104A 1 No
To Collection
163 Bill No. 5 - Page 163
ELECTRICAL (Cont'd)
LIGHTING (Cont'd)
C Motion Sensor 10 No
Fixtures
To Collection
164 Bill No. 5 - Page 164
ELECTRICAL (Cont'd)
Lightning Protection
B Piling Bonding 8 No
ELECTICAL (Cont'd)
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
166 Bill No. 5 - Page 166
ELECTRICAL (Cont'd)
COLLECTION
TELECOM SYSTEM
TELEDATA OUTLETS
To Collection
168
Bill No. 5 - Page 168
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
169
Bill No. 5 - Page 169
COLLECTION
C Heat Detector 4 No
D Combined Detector 2 No
Additional Items
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Collection
172
Bill No. 5 - Page 172
COLLECTION
To Summary
173
Bill No. 5 - Page 173
Bill No. 5 - Page 173
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
estaurant
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
TOTAL PRICE
AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
estaurant
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
estaurant
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
estaurant
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
estaurant
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30-Dec-99
AMOUNT AED
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MEP Summary
Intercontinental Resort Hotel
RAK PROPERTIES
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
MEP SUMMARY
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bill No. 6 LANDSCAPING
MAIN CONTRACT
INTERCONTINENTAL RESORT HOTEL
RAK PROPERTIES
FILLING
A Generally 26238 m3
C Paved Areas 92 m3
Planting Mediums
K Turfed Areas 96 m3
L Playground 13 m3
To Collection
Bill No. 6 - Page 1
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION B - SITE WORKS
Tennis Court
A Generally 106 m
B Generally 2443 m2
C Generally 287 m2
D Generally 140 m2
To Collection
Bill No. 6 - Page 2
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION B - SITE WORKS
A Generally 2306 m2
Colonnade paving
B Generally 1420 m2
C Generally 1205 m2
D Generally 3977 m2
To Collection
Bill No. 6 - Page 3
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION B - SITE WORKS
Rubber Paving
A Generally 558 m2
B Generally 94 m2
Courtyard Paving
C Generally 1332 m2
D Generally 373 m2
To Collection
Bill No. 6 - Page 4
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION B - SITE WORKS
Timber Decking
A Generally 1178 m2
B Generally 614 m2
C Generally 614 m2
D Generally 590 no
LANDSCAPING
Shrubs
To Collection
Bill No. 6 - Page 5
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION B - SITE WORKS
LANDSCAPING
Shrubs
D Duranta repenas 36 m2
F Gardenia augusta 89 m2
To Collection
Bill No. 6 - Page 6
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION B - SITE WORKS
LANDSCAPING
Shrubs
Feature Mix
Hot Mix 1
Hot Mix 2
L Hedychium spicatum/Phormium
tenax/Strelitzia reginae 474 m2
Turfing;
M Generally 637 m2
To Collection
Bill No. 6 - Page 7
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION B - SITE WORKS
LANDSCAPING
To Collection
Bill No. 6 - Page 8
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
POURED CONCRETE
Paving Bases
Slabs
150 thick
B Adult Pool 52 m3
D Club Pool 51 m3
E Kids Pool 37 m3
F Chalet Pool 5 m3
K Water Feature 1 23 m3
L Water Feature 2 13 m3
250 thick
R Water Channel 43 m3
To Collection
Bill No. 6 - Page 9
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
POURED CONCRETE
Slabs
400 thick
Walls
B Water Feature 1 2 m3
D Adult Pool 40 m3
E Central Pool 70 m3
F Club Pool 74 m3
G Kids Pool 15 m3
H Chalet Pool 44 m3
M Water Feature 2 2 m3
P Water Channel 17 m3
W Stone-clad wall 78 m3
To Collection
Bill No. 6 - Page 10
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
POURED CONCRETE
Columns
A Shade Structures 15 m3
B Porte Cochere 20 m3
C Colonnade Type 1 1 m3
Beams
D Colonnade Type 1 2 m3
E Adult Pool 4 m3
F Central Pool 3 m3
G Club Pool 1 m3
H Kids Pool 1 m3
J Chalet Pool 6 m3
M Seating 15 m3
N Sunken Seating 89 m3
To Collection
Bill No. 6 - Page 11
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
REINFORCEMENT
Columns
C Colonnade 108 kg
Walls
To Collection
Bill No. 6 - Page 12
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
REINFORCEMENT
Slabs
Beams
R Colonnade 309 kg
To Collection
Bill No. 6 - Page 13
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
REINFORCEMENT
Generally
SHUTTERING
J Sides of walls 85 m2
N Kids Pool 45 m2
To Collection
Bill No. 6 - Page 14
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
SHUTTERING
Sides of walls
F Water Feature 2 23 m2
R Adult Pool 25 m2
S Central Pool 26 m2
T Club Pool 7 m2
U Kids Pool 7 m2
V Chalet Pool 46 m2
W Adult Pool 16 m2
X Central Pool 36 m2
Y Club Pool 19 m2
Z Kids Pool 9 m2
To Collection
Bill No. 6 - Page 15
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
SHUTTERING
A Chalet Pool 5 m2
C Water Channel 28 m2
F Water Feature 2 15 m2
Generally
K Security Hut 10 m2
M Sides of Seating 87 m2
SUNDRIES
R Kids Pool 60 m
To Collection
Bill No. 6 - Page 16
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION C - CONCRETE WORK
SUNDRIES
A Chalet Pool 27 m
SECTION D - MASONRY
B Generally 119 m
SECTION E - METALWORK
STRUCTURAL METALWORK
Posts
C Bridge Type 1 20 no
D Bridge Type 2 6 no
Beams
E Bridge Type 1 65 m
F Bridge Type 2 13 no
Supports
G Shade Structures 58 m
To Collection
Bill No. 6 - Page 17
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION E - METALWORK
Walls
A 50 dia 28 m
Ladders
Generally
Panels
To Collection
Bill No. 6 - Page 18
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION F - WOODWORK
STRUCTURAL TIMBERS
Timber Posts
Timber Posts
B Shade Structures 13 m
Timber Posts
C Colonnade 125 m
Timber Beams
D Colonnade 118 m
Timber Structures
E Porte Cochere 39 m
Timber Structures
To Collection
Bill No. 6 - Page 19
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION F - WOODWORK
STRUCTURAL TIMBERS
Timber Battens
Timber Battens
B Shade Structures 93 m
C Playground Structures 95 no
Timber Battens
D Shade Structures 6 m
Timber Beams
E Security Hut 14 m
Timber Beams
To Collection
Bill No. 6 - Page 20
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION F - WOODWORK
STRUCTURAL TIMBERS
Timber Joists
B Bridge Type 2 42 m
Timber Bearers
D Bridge Type 2 52 m
Timber Structures
E Shade Structures 16 no
G Pathway Structures 50 no
Timber Structures
H Playground Structures 16 no
To Collection
Bill No. 6 - Page 21
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION F - WOODWORK
STRUCTURAL TIMBERS
Timber Beams
A Shade Structures 37 m
B Pathway Structures 82 no
Timber Beams
Timber Slats
D Colonnade 234 m
Timber Slats
E Colonnade 120 m
Timber Slats
F Colonnade 2080 m
To Collection
Bill No. 6 - Page 22
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION F - WOODWORK
STRUCTURAL TIMBERS
Timber Slats
Timber Slats
Timber Slats
To Collection
Bill No. 6 - Page 23
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION F - WOODWORK
Flooring
A Walkways 309 m2
Flooring
B Bridge Type 1 91 m2
C Bridge Type 2 21 m2
Bridge Type 1
D Generally 145 m2
Bridge Type 2
E Generally 29 m2
To Collection
Bill No. 6 - Page 24
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION F - WOODWORK
Shade Structures
A Generally 1541 m
Handrail
B 50 dia 970 m
COMPOSITE ITEMS
C Generally 20 no
WATERPROOFING
Landscaped Areas
D Horizontally 5839 m2
E Vertically 1507 m2
To Collection
Bill No. 6 - Page 25
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION G - THERMAL AND MOISTURE
PROTECTION
WATERPROOFING
Landscaped Areas
A Horizontally 815 m2
Landscaped Areas
Horizontally
B Podium 815 m2
C Peninsula 605 m2
Landscaped Areas
D Generally 362 no
Landscaped Areas
E Generally 2124 m2
To Collection
Bill No. 6 - Page 26
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION G - THERMAL AND MOISTURE
PROTECTION
INSULATION
Landscaped Areas
A Horizontally 815 m2
SCREENS
Privacy Screens
B Generally 8 no
SECTION J - FINISHES
BACKGROUNDS (EXTERNALLY)
Screeds
To Collection
Bill No. 6 - Page 27
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION J - FINISHES
FINISHINGS (INTERNALLY)
Floors
A F1 39 m2
FINISHINGS (EXTERNALLY)
Floors
B Generally 2467 m2
Walls
C Generally 764 m2
Floors
D Generally 69 m2
Floors
F Generally 17 m2
Floors
G Generally 294 m2
To Collection
Bill No. 6 - Page 28
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION J - FINISHES
FINISHINGS (EXTERNALLY)
Floors
A Generally 12 m2
Floors
B Generally 252 m2
Walls
C Generally 140 m2
Floors
D Generally 13 m2
Walls
E Generally 25 m2
F Generally 287 m2
To Collection
Bill No. 6 - Page 29
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION J - FINISHES
FINISHINGS (EXTERNALLY)
Floors
A Generally 42 m2
Walls
B Generally 31 m2
Walls
C Generally 16 m2
Floors
D Generally 14 m2
Walls
E Generally 275 m2
Walls
F Generally 5 m2
To Collection
Bill No. 6 - Page 30
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION J - FINISHES
FINISHINGS (EXTERNALLY)
A Generally 63 m2
Walls
B Generally 4 m2
Seating
C Generally 63 m2
D Generally 6152 m2
Seating
E Generally 88 m2
Walls
F Generally 16 m2
To Collection
Bill No. 6 - Page 31
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION J - FINISHES
FINISHINGS (EXTERNALLY)
Floors
A Generally 1786 m2
Floors
Walls
C Generally ITEM
Walls
D Generally ITEM
SUNDRIES (EXTERNALLY)
Courtyard Feature
E Generally 8 m
To Collection
Bill No. 6 - Page 32
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION J - FINISHES
SUNDRIES (EXTERNALLY)
Playground
A Generally 23 m
Seating
B Generally 61 m
Walls
B Generally 4886 m
Lawn Feature
C Generally 54 m
Adult Pool
D Generally 106 m
Water Channel
E Generally 113 m
To Collection
Bill No. 6 - Page 33
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION J - FINISHES
SUNDRIES (EXTERNALLY)
Water Feature 2
A Generally 14 m
B Generally 236 m
Central Pool
C Generally 343 m
Club Pool
D Generally 127 m
Kids Pool
E Generally 60 m
Arrival Court
F Generally 49 m
To Collection
Bill No. 6 - Page 34
Intercontinental Resort Hotel Rev.01
Mina Al Arab, Ras Al Khaimah 20 Sep. 2017
RAK Properties
ITEM ITEM DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT AED
SECTION J - FINISHES
SUNDRIES (EXTERNALLY)
Arrival Court
A Generally 14 m
Water Channel
B Generally 113 m
C Generally 285 m
Courtyard Feature
D Generally 2 m
To Collection
Bill No. 6 - Page 35
IRRIGATION SYSTEM
Pipes
To Collection
Bill No. 6 - Page 36
IRRIGATION SYSTEM
Valves
Sprinkler
R Tree bubbler 32 nr
T Tree spray 40 nr
To Collection
ADULT POOL
Pipes
Valves
Devices
ADULT POOL
Devices
B Vaccum fitting 5 nr
C Wall inlet 12 nr
D Floor inlet 6 nr
Balance tank
G 18m3 Capacity 1 nr
Pumps
LIGHTING
A Lighting Item
Devices
D Control panel 1 nr
To Collection
Pipes
Valves
Devices
Q Vaccum fitting 9 nr
R Wall inlet 40 nr
To Collection
Devices
A Floor inlet 16 nr
Balance tank
E 64m3 Capacity 1 nr
Pumps
To Collection
LIGHTING
A Lighting Item
Devices
D Control panel 1 nr
To Collection
PLUNGE POOL
Pipes
Valves
Devices
M Wall inlet 2 nr
To Collection
PLUNGE POOL
Balance tank
A 2.5m3 Capacity 1 nr
Pumps
PLUNGE POOL
A Lighting Item
D Control panel 1 nr
To Collection
Pipes
Valves
Devices
K Wall inlet 2 nr
To Collection
Balance tank
A 0.6m3 Capacity 1 nr
Pumps
A Lighting Item
Devices
D Control panel 1 nr
To Collection
Pipes
Valves
K Wall inlet 2 nr
To Collection
Balance tank
A 2.5m3 Capacity 1 nr
Pumps
A Lighting Item
Devices
D Control panel 1 nr
To Collection
EXECUTIVE POOL
Pipes
Valves
Devices
Q Vaccum fitting 4 nr
To Collection
EXECUTIVE POOL
Devices
A Wall inlet 10 nr
Balance tank
E 13m3 Capacity 1 nr
Pumps
To Collection
EXECUTIVE POOL
A Lighting Item
Devices
D Control panel 1 nr
To Collection
CHALET POOL
Pipes
Valves
Devices
M Vaccum fitting 2 nr
To Summary
CHALET POOL
Balance tank
A 1.8m3 Capacity 5 nr
Pumps
To Summary
CHALET POOL
A Lighting Item
Devices
D Control panel 1 nr
To Summary
CASCADE POOL
Pipes
Valves
E 50mm Gate Valve 2 nr
Devices
To Collection
CASCADE POOL
A Vaccum fitting - nr
Balance tank
G 3m3 Capacity 1 nr
Pumps
To Collection
CASCADE POOL
A Lighting Item
Devices
D Control panel 1 nr
To Collection
Pipes
Valves
To Collection
Devices
C Vaccum fitting 17 nr
D Water Feature Inlet 16 nr
Balance tank
H 11m3 Capacity 1 nr
Pumps
To Collection
A Lighting Item
Devices
C WF Control panel 1 nr
To Collection
Pipes
Devices
M Vaccum fitting 6 nr
Balance tank
A 3m3 Capacity 1 nr
Pumps
To Collection
A Lighting Item
LIGHTING CONTROL SYSTEM
Devices
C Control panel 1 nr
To Collection
Pipes
Valves
Devices
Q Vaccum fitting 6 nr
To Collection
Devices
A Water Feature Inlet 4 nr
Balance tank
F 3m3 Capacity 1 nr
Pumps
To Collection
A Lighting Item
Devices
C Control panel 1 nr
To Collection
Valves
Devices
J Vaccum fitting 1 nr
To Collection
Balance tank
A 0.3m3 Capacity 1 nr
Pumps
C Bromine feeder 1 nr
To Collection
A Lighting Item
Devices
C Control panel 1 nr
To Collection
Pipes
Valves
To Collection
Devices
C Vaccum fitting 4 nr
H Jet nozzel 3 nr
Balance tank
K 4m3 Capacity 1 nr
Pumps
C Bromine feeder 1 nr
To Collection
A Lighting Item
Devices
C Control panel 2 nr
To Collection
Pipes
Valves
Devices
P Vaccum fitting 6 nr
To Collection
Devices
Balance tank
E 3.4m3 Capacity 1 nr
Pumps
To Collection
A Lighting Item
Devices
C Control panel 1 nr
To Collection
Pipes
Valves
Devices
L Vaccum fitting 1 nr
To Collection
Balance tank
A 1.25m3 Capacity 1 nr
Pumps
To Collection
A Lighting Item
Devices
C Control panel 1 nr
To Collection
Bill No. 6 - Page 83
Pipes
Valves
Devices
G Floor Inlet 2 nr
H Cartridge filter(2.7m3/hr) 1 nr
J Chlorine feeder 1 nr
To Collection
Bill No. 6 - Page 84
Pumps
To Collection
Bill No. 6 - Page 85
A Lighting Item
Devices
C Control panel 1 nr
To Collection
Pipes
Valves
Devices
K Vaccum fitting 1 nr
N Cascade inlet 2 nr
To Collection
Pumps
A Lighting Item
Devices
C Control panel 1 nr
To Collection
ADDITIONAL ITEMS
A ……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
……………………………………………………………..
To Summary
Collection
Carried Forward
Brought Forward
Brought Forward
Bill No.6 - Page 41
To Summary
Brought Forward
Bill No.6 - Page 67
To General Summary
PROVISIONAL SUMS
H Item deleted
J Item deleted
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT RATE
DAYWORK SCHEDULE
A General
A1 The Main Contractor may be required to execute certain work due to the nature of which the method of
valuation will be on a day work basis.
A2 The Main Contractor is to maintain an accurate record of time spent and materials and plant used for each
separate instruction given. Day work sheets are to be numbered and should describe fully instructions to
which they refer and they are to be summarized, priced and submitted to the Engineer and Program
Manager each week. The submission of such day work sheets does not necessarily mean that the work
will be valued under the relevant clauses of the Conditions of Contract or that any payment is in fact due.
B Labour
B1 The Main Contractor, when tendering, is to give the rates he requires for labourers and craftsmen against
each item stated.
a) Wages and all costs, payments and charges including pensions, annual and public holidays, travelling
time, expenses, fares and transport, guaranteed time, non productive time and other expenses in
connection with overtime, incentive and bonus payments, and other disbursements arising from
employment of labour including redundancy payments, and all obligations of the Employer under
Government legislation.
b) Charges incurred in respect of site and office supervision including foreman's time and extra emolument
paid to foremen and leading craftsmen and gangers.
c) Site and Head Office overhead charges such as rent, rates, insurances, electricity, gas, fuel, water,
printing, stationery, postage, telephone charges, motor car expenses, renewals, maintenance and
depreciation of premises, machinery, plant and the like.
d) Profit.
C Local Materials
C1 The Main Contractor, when tendering, is to give the rates required for materials against each item stated.
a) Cost of materials including all costs for delivery to site, unloading, storing, transport and protection.
c) Profit.
C3 Materials used in day works and not listed under Day work Schedule are to be charged at invoice cost. All
discounts are to be allowed to the Employer. Invoices are to be made available to the Program Manager at
the time the relevant day work sheets are submitted.
To Collection
Bill No. 008/ Page 1
Intercontinental Resort Hotel
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT RATE
C4 The Main Contractor is to allow in the item provided the additional percentage he requires to be added to
the invoice cost of materials to cover all delivery costs to site, including costs for unloading, storing,
transport, protection, overhead charges as previously defined and profit.
D Imported Materials
D1 Invoices are to be made available to the Program Manager at the time the relevant day work sheets are
submitted.
D2 The Main Contractor is to allow in the items provided for the additional percentage he requires to be added
to the invoice price of materials to cover taking delivery, paying all costs, charges and duties, delivery to
site, unloading, storage, overhead charges as previously defined and profit.
D Plant
D1 The Main Contractor is to enter the rates required per hour for plant and machinery against the items stated
e) Profit.
D3 The rates are to be exclusive of attendants and drivers who shall be charged at labour rates set out above.
D4 If the Main Contractor is unable to price the particular type of plant listed, he should price for the nearest
equivalent item available to him and state what has been included in his tender.
D5 The net cost of specialist equipment will be paid with invoice backup plus the percentage included here
E1 The Main Contractor is to include a percentage increase, for labour costs for day work carried out at the
instruction of the Program Manager outside normal working hours.
To Collection
Bill No. 008/ Page 2
Intercontinental Resort Hotel
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT RATE
DAYWORKS
Labour
A Forman hr
B Surveyor hr
C Site in charge hr
D Rig Operator hr
E Crane Operator hr
G Shovel Operator hr
H Excavator Operator hr
J JCB Operator hr
L Welder hr
M Steel Fixer hr
N Mechanic/Fitter hr
P Skilled Labourers hr
Q Unskilled Labours hr
R Mason hr
S Rigger hr
T Electrician hr
W Carpenter hr
X Office boy hr
Y Security/Watchman hr
To Collection
Bill No. 008/ Page 3
Intercontinental Resort Hotel
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT RATE
Machineries
A JCB hr
B Shovel/ loader hr
E Excavator hr
F Anchor Machine hr
H Piling Rig hr
J Grouting Machine hr
N Compressor hr
Material hr
W Building sand t
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT RATE
Machineries
RAK Properties
ITEM DESCRIPTION QUANTITY UNIT RATE
SUMMARY
SECTION D - DAYWORKS
Collection
To General Summary
Bill No. 008/ Page 6
AMOUNT AED
n accurate record of time spent and materials and plant used for each
sheets are to be numbered and should describe fully instructions to
ummarized, priced and submitted to the Engineer and Program
of such day work sheets does not necessarily mean that the work
ses of the Conditions of Contract or that any payment is in fact due.
, is to give the rates required for materials against each item stated.
isted under Day work Schedule are to be charged at invoice cost. All
mployer. Invoices are to be made available to the Program Manager at
AMOUNT AED
the Program Manager at the time the relevant day work sheets are
ates required per hour for plant and machinery against the items stated.
dants and drivers who shall be charged at labour rates set out above.
ce the particular type of plant listed, he should price for the nearest
will be paid with invoice backup plus the percentage included here
ercentage increase, for labour costs for day work carried out at the
AMOUNT AED
AMOUNT AED
AMOUNT AED
AMOUNT AED