Vous êtes sur la page 1sur 2

DOCUMENT TRANSMITTAL

PHARMACEUTICAL FACTORYPROJECT DCPL


INTERNATIONAL

To: URBN LIMITED From: DCPL


Attention : PFP-TRM-DCPL-URBN-
ZOHRA POLADI Transmittal
00057
Original
DATE : 14/02/19
DELIVERY : Hard Copy
Electronic File PAGES : 3

Status of Document Purpose of Issue


Approved A For Information IFI For IFC
Construction
Revise and B For Use / Action IFU For CRD
Incorporate Coordination
Revise and Resubmit C For Review / IFR For Pricing IFP
Comment
For Information D For Approval IFA Other

Dear Sir or Madam,


We enclose/are sending you the document(s) listed below. Please acknowledge receipt
by returning a copy of this transmittal, reporting shortages, if any.

Subject  MECHANICAL : PIPING PACKAGE

Document No Document Title Rev Pur Sta

PFP-DCPL-MCH-NPUB-1-00-004 TUNNEL PLAN WITH UTILITY PIPING LAYOUT 02 IFA B

PFP-DCPL-MCH-NPUB-1-01-001
FIRST FLOOR PLAN WITH UTILITY PIPING LAYOUT 06 IFA B
(01OF 02)

PFP-DCPL-MCH-NPUB-1-01-001
SECTION DETAIL FOR FIRST FLOOR 06 IFA B
SH. (02 OF 02)

PFP-DCPL-MCH-NPUB-1-01-006 BOILER HOUSE PIPING GA 01 IFA B

PFP-DCPL-MCH-NPUB-1-01-015 SECTION DETAIL FOR FIRST FLOOR PIPE


01 IFA B
SH. (02 OF 02) SUPPORTS

PFP-DCPL-MCH-NPUB-1-01-161 FIRST FLOOR PLAN FOR WATER SUPPLY LAYOUT 06 IFA B

PFP-DCPL-MCH-NPUB-1-02-002 SECOND FLOOR PLAN WITH UTILITY PIPING


05 IFA B
SH. (01 OF 02) PLAN

PFP-DCPL-MCH-NPUB-1-02-002
SECTION DETAIL FOR SECOND FLOOR 05 IFA B
SH. (02 OF 02)

Pharmaceutical Factory Project Page 1 of 2


DOCUMENT TRANSMITTAL

PHARMACEUTICAL FACTORYPROJECT DCPL


INTERNATIONAL

Document No Document Title Rev Pur Sta

PFP-DCPL-MCH-NPUB-1-02-016 SECTION DETAIL FOR PIPE SUPPORTS 01 IFA B

PFP-DCPL-MCH-NPUB-1-01-162 SECOND FLOOR PLAN WATER SUPPLY LAYOUT 06 IFA B

THIRD FLOOR PLAN WITH UTILITY PIPING 05


PFP-DCPL-MCH-NPUB-1-03-003 IFA B
LAYOUT

PFP-DCPL-MCH-NPUB-1-03-017 THIRD FLOOR PLAN WITH PIPE SUPPORT DETAIL 01 IFA B

PFP-DCPL-MCH-NPUB-1-01-163 THIRD FLOOR PLAN WATER SUPPLY LAYOUT 06 IFA B

PFP-DCPL-MCH-NPUB-1-04-005 TERRACE PLAN WITH UTILITY PIPING LAYOUT 02 IFA B

PFP-DCPL-MCH-NPUB-5-002 SUPPORT FOR SEISMIC ISOLATION 00 IFA B

PFP-DCPL-BOQ-MCH-0001 BOQ FOR MECHANICAL AND PIPING WORKS 03 IFA B

TECH. SPECIFICATION OF HYDROPNEUMATIC 00


PFP-DCPL-SPC-MCH-00038 IFA B
SYSTEM

PFP-DCPL-SPC-MCH-00040 DATASHEET OF SEISMIC ISOLATORS 00 IFA C

SENT: SIDDHARTH DOSHI RECEIVED : ZOHRA POLADI

Pharmaceutical Factory Project Page 2 of 2