SEL-ITP-SA-009
AIOC-ACG PROJECT Rev. 1
Page 1 of 20
JOB NO.-1353
CONTENTS
Section Description Page
2.0 Responsibilities
2.1 Responsibilities of Swift Engineering Limited 6
2.2 Responsibilities of the Main Contractor 7
3.0 Explanation for Tables
3.1 Classifications of Checks, Examinations and Tests 7-8
3.2 Reference Document 8-9
3.3 Report Forms 9-10
3.4 Responsible Person 10
4.0 Equipment Mobilization 10
5.0 Personnel Mobilization 10
Table 1 Material Control 11
Table 2 Preparation of tank access openings 12
Table 3 Installation and reclaiming of openings 13-14
Table 4 Testing activities 15
Table 5 Painting activities control 16
Table 6 Final documentation and hand over 17
Appendix I 18
Appendix II 19
Appendix III 20
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-009
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 4 of 20
JOB NO.-1353
1.0 Scope.
1.0.1 This Inspection and Test Plan covers the checks, examinations and tests to be carried out on Renewal works of Wooden
Panels on the Derrick Barge “Azerbaijan”.
1.0.2 This Inspection and Test Plan is to be considered as a summary of information necessary for a correct performance of
these checks, examinations and tests and an interface document for the Client and any other organisations concerned to
clarify the relevant interventions and duties.
1.0.3 Routine checks, examinations, tests and any other inspection activities, which do not require the issue of relevant
documents, are not covered by this plan. They shall in any case be carried out to the extent necessary to satisfy the
contractual requirements and to ensure proper execution and control of the work being performed.
1.0.4 This plan may be formally updated through the Management Review Process taking into account any applicable indications
for reference documents, testing procedures, qualification records, etc., and for the recording forms, and by the Client or
any other organisation involved, for test witnessing and acceptance.
1.1 Definitions.
Acceptance Specified limits placed on characteristics of an item, process, or service defined in codes,
Criteria standards, or other requirement documents.
The Work All fabrication, installation & commissioning works undertaken by Swift-Engineering Limited.
The Contractor The organisation to whom Swift-Engineering Limited are under contract to.
Therefore the contractor is Saipem.
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-009
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 5 of 20
JOB NO.-1353
The Contract : Formally executed contracts and any attachments thereto between Swift Engineering Limited
and it’s Clients
Checks : Activities including measuring, examination, testing, gauging one or more characteristics of
Product or service and comparing these with specified requirements to determine conformity.
Test : An element of inspection for the determination of the capability of an item to meet specified
requirements by subjecting the item to a set of physical, chemical, environmental or
operating conditions as appropriate
VE : Visual Examination
2.0 RESPONSIBILITIES
2.1.1 SEL shall perform all checks, examinations and tests required for acceptance of the work and to report to the Contractor
the results unless otherwise specified.
2.1.2 SEL shall perform all preparation for checks, examinations and tests for witness by the Contractor where appropriate.
2.1.3 The Contractor shall have access at any time to the SEL working area to check inspections activities.
▫ Checks, examinations and tests which are defined to be in scope of work in this Inspection & Test Plan.
▫ Interpret and evaluate the results.
▫ Issue the reports in the stated format.
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-009
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 7 of 20
JOB NO.-1353
2.2.1 The Contractor will have the right to witness and/or review tests and inspections performed by SEL at any time provided that
the work is not unreasonably suspended or disturbed.
2.2.2 At his discretion, the Contractor may witness and/or review tests and inspections for items of which are listed in this
Inspection and test Plan and approve tests and inspections by signing the reports.
3.1.1 Involvement of the Contractor and any other organisations concerned in the overall process for each check, examination and
test activity given in this Inspection and Test Plan may be inserted prior to issuance of this Inspection & Test Plan “For
Construction”. Such changes shall result in the document reference indicator number being changed to reflect the project
specific nature of the Plan.
3.1.2 Definitions of codes used for involvement are as follows and indicated at the foot of each page of this Inspection and test
Plan.
0: The party who executes the checks, examinations and tests given in the related paragraph,
1: The party who inspects the checks, examinations and tests given in the related paragraph,
2: The party who reviews the checks, examinations and tests given in the related paragraph,
3: The party who witnesses the checks, examinations and tests given in the related paragraph,
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-009
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 8 of 20
JOB NO.-1353
R: Shows that the activity given in that column is carried out randomly
H: Shows that the activity given in that column can not be carried out without any acceptance, review,
Witness or check of the Client
3.1.3 The Contractor may the review this Inspection & Test Plan and indicate their involvement for each check, examination and
test item by introducing above given definitions.
3.1.4 The involvement of Contractor responsible person nominated to execute each quality related activity during the performance
of the work is clearly defined in this Inspection & Test Plan.
3.1.5 If the Client introduces to add the Hold Points (H) and Witness points (3) on some more activities than assigned by SEL,
the Inspection and Test plan is revised in accordance with the Contractor requests and submitted to the Client for his
approval by the Contractor. After Contractor approval the Inspection and Test Plan shall be stamped as “For Construction”
and distributed in accordance with the Document and Data Control Procedure of Swift Engineering Limited.
3.2.1 Referenced Documents indicated in front of the each activity on the Inspection and Test Plan may by the Procedures
generated by SEL, Client Specifications, International Standards, Contracts and other Contractual Documents. The description
of the most used referenced documents is as follows :
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-009
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 9 of 20
JOB NO.-1353
SAIPEM SOW : Saipem Scope of Work for preparation and closing of openings
: Swift Method Statement for Openings
SPC-SPA-HSE-002-E : Health, Safety and Environmental Requirements for Subcontractors
SPC-COR-QUAL-002-E : Medium Criticality Specification
: Russian Maritime Register of Shipping
AWS D1.1 : Structural Welding Code
SEL-QP-019 : Fabrication and Installation of Steel Structure
SEL-QP-022 : General Welding Procedure
SEL-QP-023 : Visual Examination Procedure
SEL-QP-026 : Dimensional Survey Procedure
SEL-QA-006 : Product Identification and Traceability Procedure
SEL-QA-003 : Document and Data Control Procedure
Report Forms indicated in front of the each activity in the Inspection and Test Plan shall be produced for carried out work by
SEL. Quality forms shall be sent to the Contractor for their review and approval for construction upon their request. If it is not
required by the Contractor then SEL shall use them without any approval of the Contractor. All quality reports to be used in
construction works are given on this Inspection and Test Plan in the Table 1 through the Table 6 and additionally given as
Appendix I to this Inspection and Test Plan.
During the production the Non-Conformance report (NCR) can be filled by QC Inspector or Coordinator as shown on related
paragraphs on this Inspection and Test Plan.
Report forms shall be numbered in accordance with the Document and Data Control Procedure of SEL.
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-008
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 10 of 20
JOB NO.-1353
The Final Documentation Index is given as Appendix II to this Inspection and Test Plan.
Responsible person is identified by the Project Manager and Quality Manager to follow up the activities shown in this
Inspection and Test Plan.
All materials and equipments will be brought onto the DBA under Sapiem control and personnel, and shall meet the
requirements of Saipem HSE specification SPC-SPA-HSE-002-E. All measuring equipments used on the Project shall be
calibrated. The equipments which the calibration date expired shall not be used on site and if any such situation occurs, the
equipment shall be removed from the site immediately. The all equipments, tools shall be stored in safe container. All
welders shall be provided with the quivers. All lifting equipments shall be given a present lifting code and shall have load test
certification. These cert’s shall be attached to the delivery notes during the equipment or material deliveries when they are
required in process.
The number of personnel who will do the corresponding job under this project shall be defined by Project Manager. All
welders who are involved within this Project shall have the correct welder certificates. All gougers shall be experienced and
tested at the fab-shop if the Contractor require. NDT of welds will be MPI and to be done only by qualified technicians by
ASNT Level 2.
The Project organisation chart is given as Appendix III to this Inspection and Test Plan.
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-009
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 11 of 20
JOB NO.-1353
Saipem SOW,
2.0.1 Verify that a PTW in place HSE QC Inspector 0-1
HSE Plan
Ensure that all construction drawings
Document not
2.0.2 were reviewed b and approved by Saipem SOW QC Inspector 0-1
applicable
RMRS
Check that the marking of to be cut Document not
2.0.3 part of shell plate is correct and up to Related Drawings applicable (only visual QC Inspector 0-1
the drawings check)
Ensure that ballast tanks inside is safe
Saipem SOW, TRA,
2.0.4 secured and any unsafe action to be QC Inspector 0-1
HSE Plan PTW
suggested to happen is prevented
Document not
Check (visually) that cutting surfaces
2.0.5 SEL-QP-019 applicable (only visual QC Inspector 0-1
are free from any defects check)
Document not
Check that flame cut edges which are
2.0.6 SEL-QP-019 applicable (only visual QC Inspector 0-1
not welded have been ground smooth check)
Check that defects (if any) on the Document not
2.0.7 flame cut edges have been dressed SEL-QP-019 applicable (only visual QC Inspector 0-1
out/repaired check)
LEGEND: SEL : Swift-Engineering Limited 0: Execution R : Random
SA : Saipem 1: Inspection H : Hold Point
RMRS : Certifying Authority 2: Review
3: Witness * To be filled in case of any non-conformity.
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-009
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 13 of 20
JOB NO.-1353
TABLE 3.0 : INSTALLATION AND RECLAIMING OF OPENINGS
ITEM Description of checks, Procedure Responsible Involvement
Output Document
NO: examinations and tests Reference Person SEL SA BP RMRS
Apply dimensional inspection on plate
Drawings, Document not applicable
3.0.1 size for the openings and compare QC Inspector 0-1
Saipem SOW (only check & measure)
with the approved drawings by RMRS
Ensure that the bevel on the cut plate
Drawings, Document not applicable
3.0.2 and shell plate is not more than 30° QC Inspector 0-1
Saipem SOW (only check & measure)
(so the groove angle shall be 65° max)
Apply Visual Examination to the SEL-QP-019 Document not applicable
3.0.2 QC Inspector 0-1
aligned component SEL-QP-022 (only check & measure)
SEL-QP-022
Verify that WPS has been qualified and
3.0.3 Related WPS’s NC 101* QC Inspector 0-1
meets the requirements of standards and PQR’s
Check that the surface of the material
within 50 mm from proposed weld is Document not applicable
3.0.4 SEL-QP-022 QC Inspector 0-1
dry, clean and free from any (only check & measure)
contaminants
Check that welders has valid certificate
3.0.5 SEL-QP-022 NC 101* QC Inspector 0-1
for the subject welding
SEL-QP-022
Check that welders are applying the
3.0.6 Related WPS’s Welder audit reports QC Inspector 0-1
welding variables given in the WPS and PQR’s
LEGEND: SEL : Swift-Engineering Limited 0: Execution R : Random
SA : Saipem 1: Inspection H : Hold Point
RMRS : Certifying Authority 2: Review
3: Witness * To be filled in case of any non-conformity.
DOCUMENT NO.:
INSPECTION AND TEST PLAN SEL-ITP-SA-009
FOR PREPARATION & RECLAIMING OF OPENINGS ON THE Rev. 0
DERRICK BARGE “AZERBAIJAN” Page 14 of 20
JOB NO.-1353
2.0 PERSONNEL
2.1 Welder certificates and qualification certificates of
other personnel involved on this job
3.0 WELDING
3.1 WPS and PQR’s
4.0 CALIBRATION
4.1 Calibration certificates of all equipments involved on
this SOW
SAIPEM FIELD
HSE
COORDINATOR
MANAGING DIRECTOR
Glenn Markham
ENGINEERING
OPERATIONS MANAGER.
HSE MANAGER
PROJECTS PROJECT ENGINEER David Kavanagh
COORDINATOR Ruslan Mustafeyev
Alan Whitby
FABRICATION
SUPERINTENDANT
Tafakul Shiraliyev