ANNEXURE I
SCOPE OF WORK
1. System Installation Details:-
The power to this 11/0.433 kV Substation is received from 33/11 kV substation of the
UPPCL. There are 20 nos. transformer of 1000/2000 kVA, HT/LT Switchgears panels in
06 (six) Nos. Of sub-stations at different locations but inside HAL factory. The scope of
work of this tender starts from the 11kV VCB/ACB panels at 11/0.4kV sub-Stations
including Earthing system to shop side distribution panels.
2. Operation of Electrical Sub-stations:-
The Six nos. of sub-stations to be operated in three shifts (A,B & C Shift) round the
clock basis. The sub-stations are equipped with HT/LT Panels for power distribution,
capacitors/ capacitors Bank etc. The contractor have to engage semi skilled electrician
with qualification of ITI in Electrical trade with adequate experience in electrical
maintenance work and unskilled electrician helper with adequate experience in electrical
maintenance work to run all the six sub-stations as per safety and factory rules.
Deputation of persons in duty shall be as follows:-
1st shift from (06:30 hr to 14:30 hr):- 3 semi skilled + 2 helper
Substations need to operate and maintain round the clock i.e.24x7 modes (365
days).The contractor is required to maintain the whole power system available
right from receiving power at 11KV VCB panel and up to shops/building
including earthing.
Note: Logbooks and jobs carried out based on daily basis and the contractor shall maintain
prescribed preventive schedule.
ii) All personnel engaged in the contract even for short duration must insured against all
claims as per Compensation act 1948. Similarly contractor shall be solely responsible for
payment of wages/salaries and allowances to their personnel as per the rules/act
applicable under government order and HAL, Lucknow will be indemnified of such
payable by the contractor.
iii) The contractor shall comply with the statutory provisions of Contract Labour
(Regulation & Abolition) Act 1970, Employees State Insurance Act, Workman’s
Compensation Act 1923, payment of Wages Act 1936, The Employees Provident Fund
(and Miscellaneous Provisions) Act 1952, payment of Bonus Act 1965, The Minimum
Wages Act 1948, Employers Liability Act 1938, and/or any other rules/regulations that
may be applicable to them. The contractor shall indemnify HAL against all claims which
may be made upon the HAL whether aforesaid statues in force during the currency of
this contract.
iv) Entry of contractor’s staff engaged for this work shall be controlled as per HAL Security rules and
regulations. Entry passes shall be issued by the security deptt. on recommendation from the
Engineer-in-charge. The Engineer-in –charge shall have the right for the admission of the contractor,
his operator and working people in the sub-stations or any part thereof. The contractor shall submit
a list of concerned personnel etc. and shall satisfy to the E.I.C. or his authorized representative.
v) For the purpose of the proper identification of the employees of the contractor
deployed for the work, contractor shall issue identity cards bearing their
photographs/identification etc. And such employees shall display their identity cards at
the time of duty. No unauthorized people would be allowed in the sub-station and there
should not be gathering of people at the sub-stations.
vi) Daily attendance of the staff shall be maintained by the contractor and contractor
shall make it available to Engineer-in-charge for inspection as and when required.
7. Theft of Parts: - Contractor shall be fully responsible for theft, burglary, fire or any
mischievous deeds by his workers/staff and shall replace the items under such category.
Any loss occurred due to negligence will be recovered from the contractor.
8. Materials, Consumables, Spares & Tools etc.:-
i) For performance of contract, the Contractor will arrange all tools & machines/testing
equipment’s required for execution of said jobs (maintenance/operation), which will be
included in quoted rates. No extra payment for the same will be made by the HAL.
ii) During the period of maintenance contract, payment for only emergent nature of
work towards replacement of parts, spares or consumables etc. shall be entertained. The
Work Order No. : HAL-ADL/9995/346/FM-MAINT/702 Dt.06.09.2016
ANNEXURE I
firm will hand over the complete system fully functional back to the department on
completion of work. Maintenance work is to be performed through either OEM or
Engineer-in-Charge certified vendors. Post facto bills will not be entertained.
9. Payment Terms:
i) Contractor will submit the bill in triplicate every month along with monthly report after deducting
the applicable rebate/deductions. Contractor will also submit the proof of payment of statuary dues
like EPF, ESI etc. The payment shall be made as per the certificate of E.I.C. will be given on the bill.
ii) Sales tax/Income tax/service tax etc. on works contract will be applicable as per the U.P. Sales tax
act and that shall be directly deducted by the accounts department from the bill.
10. General:
i) If any activity, which is not covered in the contract. & it, may affect the performance of the sub
stations is to be included & shall be treated as the part of contract.