Vous êtes sur la page 1sur 6

Method Statement & Risk Assessment for

Painting Works

Contract No: FT-16002 Doc. No: CVT/FT/16002/MSRA/21 Rev.02

Method Statement for


Floor Painting inside ATA Substation

Version Issue.
Rev Date Status Revised By:

01 19.02.2019 For Approval Eldie

Acceptance / Approvals:

Name Signature Date

Prepared by: Eldie Tadalan 20.02.2019

Reviewed by: Vinod Kumar 20.02.2019

Accepted by: Samson Albert 20.02.2019

Page 1
Method Statement & Risk Assessment for
Painting Works

Contract No: FT-16002 Doc. No: CVT/FT/16002/MSRA/21 Rev.02

Table of Contents:

1. General Information

2. Appendix A – Method Statement for Floor Painting Works in ATA Sub-station

3. Appendix B – Task Risk Assessment for Floor Painting Works in ATA Sub-
station

Page 2
Method Statement & Risk Assessment for
Painting Works

Contract No: FT-16002 Doc. No: CVT/FT/16002/MSRA/21 Rev.02

Description of
Floor Painting inside ATA Substation
Task

Project name: Seawater Desalination & Demineralized Water Treatment Center


Contract No: TK-2861 Location ATA Substation
Name Role/Trade

Work Supervisor: Dilshad Hussain Supervisor

Zubair Hussain HSE Officer

Key Plant & Tools


Paint Rollers, scrapper, sand paper
Required:
Key Materials
Paints
Required:
Other Essential
All PPE as per MSDS
Equipment:
Specific Identified
See Attached MSDS
Hazards
Specific Training The painter involved shall undergo work safe induction and
Requirements: POV/LOTOV/HV training

Sequence of
Refer to Appendix A – Method Statement
Operations:

Hazardous
Substances:

Applicable: No Yes No No No Yes No


Other:
Required -Over All
Personnel -
Protective Reflectorized
Equipment: Vest

Yes Yes Yes Yes No Yes


Fire – If minor, immediately sound alarm and alert all those present
Emergency within the premises and tackle same with onsite fire extinguishers. Call
Procedures: EGA ERT if not brought under immediate control. Notify H&S advisor to
investigate.
EGA
EMERGENCY 02-509-2222
NUMBER

Page 3
Method Statement & Risk Assessment for
Painting Works

Contract No: FT-16002 Doc. No: CVT/FT/16002/MSRA/21 Rev.02

Appendix A

Method Statement for


Floor Painting inside ATA Substation

Page 4
Method Statement & Risk Assessment for
Painting Works

Contract No: FT-16002 Doc. No: CVT/FT/16002/MSRA/21 Rev.02

1. Scope
The scope of the procedure applies for floor painting inside the ATA sub-station.

2. Purpose
The purpose of this procedure is to identify, define and implement suitable and systematic
procedures for floor painting inside the ATA sub-station.

3. Roles & Responsibilities


3.1 Site Manager/ Construction Manager
Responsible for the overall execution and completion of the erection of equipment although
day to day responsibilities may be delegated to other team members.
3.2 QA/ QC Engineer
Will be responsible for all inspection activities and the preparation of documentation in
accordance with the Quality and carryout inspection of activity.
3.4 Site Supervisor/ Foreman
Will have overall responsibility for execution of works, planning and allocating day to day
work schedules; oversee requirements of manpower, tools & tackles and heavy equipment.
3.5 HSE Officer
Reports directly to HSE Manager, responsible for, conducts safety awareness training for
site personnel, day to day monitoring of the site to ensure safe working practices are being
followed and ensures that all tools & tackles, heavy equipment and machinery comply with
the safety requirements of the project.

4.0 Tools /PPE


 Paint Rollers
 Scrapper
 Sand Paper
 ARC Flash coverall
 Mask as per approved MSDS
 Clear Safety Glass
 Safety Helmet with chin-strip
5.0 Manpower
Sufficient manpower will be provided as required to meet the safe, satisfactory and timely completion
of activity.

• Painter -01
• Helper -01
• RA/Supervisor -01

Page 5
Method Statement & Risk Assessment for
Painting Works

Contract No: FT-16002 Doc. No: CVT/FT/16002/MSRA/21 Rev.02

6.0 Safety
• Safety requirements for painting work inside the ATA sub-station will be followed as
per the approved MSRA, manufacture Specification and EGA/Hatch Safety
Procedure/Specification. Activities such as POV/LOTOV Procedures.
• The painter will attend POV/LOTOV /HV awareness training before starting the
painting work inside the sub-station.
7.0 Reference Documents
All relevant reference documentation related to painting work will be attached
• MSDS
• TRA
8.0 Procedures:
Obtain work authorization from Hatch for floor painting inside ATA Substation.
The painting work will be done as per approved MSRA and FT will follow the Hatch
POV/LOTOV Procedure when working inside ATA substation.
FT will ensure all people entering inside the substation must be completed the Hatch’s HV
and LOTOV/POV training.
FT will ensure involved people must use all mandatory PPE like High voltage insulated hand
gloves, ,clear goggles, ARC flash proof Coverall (ie .cat 2/83).
Supervisor will ensure all hand tools must be fully insulated (free from defect)