Vous êtes sur la page 1sur 7

SALURAN

38.9 39.0
P.28 P.29 P.30 P.31 0 9 P.38 P.3
5 P.26 7 38.0 38.8 9
P.24 P.2 37.66 3 2 P.37
P.2 .3 7 .1 5 37.16 36.8 39.3 38.9 P.40
.17 37 37 38.89 1 6 8
Amb
38 50 8 0 37.28 38.7 38.3
3 + 38.00 7.3 .86 7.6 38.7 0 e kae P.41
P.2
. 37.52 38.5 4 ri
37 56 3 37 3 36.9 38.9 9
. .39 .50 .29 37.673 5 7 38.3 1
37 37 .26 .44 .2 38 05 38.73 37.8 38.8 2 38.6
B
37 38 38 38.8 7 P.42
TP
6 . 6 1 38.7
7.7 3 39 38.43 38.89 37.0
5 0 SD
38.1 9 38.5
3 3 7.9 3 .56
36.9
1 38.8 0 38.8
6 38.8 6
.6 38 6 38.4 9
2 .46 38 38.66 37.2 38.0 P.43 P.44
P.2 .68 38.8
.52 .90 38
87 38.9 38.8 38.7 39.0 9 9
38.8 8
37 37 37 .80 9 9 0 6 9 P.45
.43 38 14 38.1 37.9 .00
2 .69 .49 38
36.5
0 38.8
BW.1 38.4
4 5 5 + 38
38 38 38.5 9 38.8 P.46
37
.9
.67 .1d 13 BW.1
e 7
15 TA.2 4 38.8 9
e 38.7 38.5 38.0 9 37.5
1 38 69 .47 BW .64 38.89 38.0
2 9 38.0
7 37.9 6
P.2
38.2
.31 . 38 38 .13 38.7 38.7 SD 38.8 4 38.5 1 37.6 0
.86 38 .21 38 7
38
7 38.8 2 8
37 .01 3 8 . 7 3 3 8.7 . 78 38 .8
38.5
3
16 0 9
38.2 38.9 38.3 9 GARIS
SAMBU
. 2 0 38 4 38 6 . 31 3 8 9 38.7 7 8 7 38.0 38.5
6 38.1
37.6
8 NG
P 8 0 3
A .22 38
.9
38
.6 12 3 38.30 .13 38.3 38.1
9 38.5 38.3 6 MATCH LIN
E
38 4 1 c 7 38 38.89 7
3 3 8
38.2
8 3 8 37.9 3 38.07
8.6 55 W.
2 8 3 8.89 .8 .1
5 3 8. 1 38.21 .89 .41 9 1 9 3 8 1 38.0
. 3 3 . .8 38.89 38
38.16 36.45 .2
38.3 3 38.3 3 37.9
.80 38 .69 38 B .33 38
37.5
6 17 38.5 BW.1h
38.2
9 37.8 38.4 0 38.1 1 38.2 4
37 81 38 2 38 36.7 BW.1 5 9 2 1 9
P.19 7 . . 0 2 2 7 38 .27 3 f 3 3 37.7
3
0 6 7 0 8
2
.5 1 T M .
38 07 38
. .32 38.26 3 8
8 9 37.9 3 38.8
8 .2 3 38.8
9
7 .85 + 38 9
. . 3 . 1 7 .8 38.2 .6 Ke K
38 6 38 8 .7 3 8. 2 5 69 3 8 5 36.7 9 6
8 38.0
6 3 end
P.18 .0 3 .9 6
.83 38
.
38
. 38 .89 .80
3 8.06 1 39.0 18 38.2 3 8.12 7 .92 ari
38 .68 38 38 68 .04
38.2 8 37 37.8 3 0 38.0
38 .27
37.0 9
.87 2 11 .
38 8.51 0
38 23
. 38
38.15 7 5 39.0 37.7 BW.1 3
i 8.45
38.0
4 37.9
3
2 2 . 9 4 38 3 8.6 3 8.5 0 38 8
37.99 .89 37.7 5 38.2
9
6
3 8
1 . .0 8 7 38.1 .1
.7 38 37 0 3 8.4 6
38
3 9 37.2 38.5 L 6 38.0
38 6 9 3 8.8 .06 3 8.4
8 .26 .17 0 4 5 38.8 apang 38.8 38.8 B
W 1 9
37.7
3 38.0 3
7 . 3 . 7 3 8 3 3 4 8
3 .5 37.69 9 a n bola 9 9 .1 h 9 3 8.00
P.1 38 37 .78 .42 .9 38.4 37.1
.69 .97 38 15 .25 37 38 3 8 38.3
38.1
3
37 .59 38 .67 37 80 38.8 38.6 4 37.9
7 38 89 . 38 7 37.62
9 38.8 38.0 0
.89 .20 8.3 7 38 8.6
.
37 .09 38 .86 37.2 39.0 1 38.2 9 9 37.7
38 38 3 .8 8 .88 3 6 8 0 0 37 3 8.1 2 3 38.7 8 2 2
37 3 .6 3 .1 . 1
38 .11 .94 38.8 37.1 38.2 1 39.0 38.4 0 38.8
.10 10 38 38 .03 1 .34 37 8 1 6 39.0
38.5 3 3 9 37.8
m.
0 2
.06 8 39 1 7 38 8.3 0 38 38 39.0 6 38.8
4 38.1 38.8 38.1
39 9 8 8 5 3 .0 8 37.7 + 38
38
. . 2 .
38 21
H .
38 53 38 36 . 0
U P.32 4 3 8.29 5 3 9 2 .00
38 . . . 38 37.8 Hm 39.1 + 38
4 39 .50 38 38 .92 5 39.0 39.1 38.8 38.4 6 38.7 .21 0 .00
8.4 38 4 5 37 7.9 N P
3 5
38.7 9 8 37.9
7
38.0
7 0
. 5 3 3
8 .5 8
3
.3
8 8 8.3 7
3 .34 5 38.2

a
3 . 2 3 . 8 P.33 3 BW.1 3
38 38 44 37 8.62 0 38.8 8.38

atom
+ 39
.51 . .02 9 j
.71
3 38 38 8.49 8 38 .81 38.8
.62 .32 37

ma
P.36 38.8 38.3

.00
38 2 9 39.0

Ke L
38 3 8.4 4
38 .51 4 8 3 .6 9 8.0 .18 39.0
2 38.6 9 38.3 1 4

Lato
8 . 3 3 8 2 38 1
3 38 38 8.2 .19 .50
8.6
5
3 38.8 38.3
5 + 38
2

ma
3

Ke
.3 3 9 3 38.8
sal. pembuang kiri .56 .53 38 .9 37.7 38.8 8.94 9 .00
.16 37 + 38 0

Lato
38 38 .62 + 38.50 9 9 38.9 38.8 38.8 38.4 38.0

R
ge canal 4 3 4 3 8 3 7 1 9 9 7 .5
left draina .4 38 .36 .
38 .53 + 38.00
.24 3 + 37

=4
38 38

Ke
8 39.2 37.2

La
5 9 3 0 7 38 38.74
8. 8.2 40 8.1 2 + 37.50 .89 2 7

00
to
6 3 3 3 3 8.51 38.9 3 8.89 3 .00
+ 37

m
.7 . .3 37.9
.86 38 .34 38 8.38 38 6 5 7.10

a
38.8

m
.23 38 .16 38 .41 3 39.2
3 7 37.8
1
38 .34 39 38 .4 0 0 38.8
39 38 .0
38
.68
.89 38
.43 +
38 9 B
38
.9 3
.60 38
38
A 1e
W. .1
h .1
i
d G B f BW .1
j k
8.9
6
c .1 A N .1 I BW KI .1
sal. pembuang kanan 3 .1 W BU T BW C A I BW I BW
BW KI B EM VER
I
UC P
CU EP K C
AK
right drainage canal CI KA P L C E GA ST LA
N CU TEP K
CU TEP LAN NG
2
CU GA ST NG NG JA GA S LA
N
TA SHI
jalan inspeksi
GA S EJA RO GE NG NG 1g PE NG NG JA
NG NG TA SHI W. A AN E TA SHI PE
GO AINA
inspection road P
TA SHI AN E A N B
W AT IDG W
A
A N E
A AT IDG D R W
AT
A MB R AT IDG
W
MB BR JE OT B MB
E MB E JE OT B
R
J OT JE IDG FO
L FO BR FO
IP
TL

TM TA

R R

0.60 3.50 5.16 14.00 5.16 5.00


0 1 2 3 4 5 6 7 8 9 10 m 1.00 1.00
1 : 20 1 : 20
SV = 1 : 100 w = 0.50 m
0 20 40 60 80 100 120 140 160 180 200 m 2 2 1
jalan inspeksi
1 1 1 h = 1.78 m 1 1
SH = 1 : 2000 1 1 inspection road

bidang persamaan / reference level


+32.00 m
PATOK HEKTOMETER Hm 14 Hm 16 Hm 17 Hm 20
HECTOMETER STONE
Hm 0 Hm 10 Hm 11 Hm 12 Hm 13 Hm 15 Hm 18 Hm 19 Hm 21
NOMOR PROFIL P.20 P.21 P.22 P.23 P.24 P.25 P.26 P.27 P P.31 P.32 P.33 P.34 P.35 P.36 P.37 P.38 P.39 P.40 P.41 P.42 P.43 P.44 P.45 P.46

28
29
30
P.19
PROFILE NUMBER

25.00
21.41.17
1007.20

1057.17

1106.16

1156.84

1207.55

1269.23

1316.92

1366.58

1388.58

1428.27

1479.04

1529.69

1563.22

1615.12

1668.18

1713.18

1764.15

1814.15

1864.15

1916.12

1966.11

2016.10

2066.10

2116.17
907.25

957.08

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE 49.97 48.99 50.68 50.71 51.68 54.69 52.66 47.69 50.77 50.65 33.53 49.90 50.06 50.00 50.97 50.00 50.00 51.97 49.99 49.99 49.98 50.09

8.00
6.00
49.85 50.12
ACCUMULATED DISTANCE

ELEVASI TANGGUL KIRI


LEFT BANK LEVEL
YANG ADA
EXISTING

ELEVASI TANGGUL KANAN


RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
36.44

36.74

36.49

38.47

38.10

38.97

38.35

38.47

38.70

38.28
38.44

38.76

38.78

37.00

36.67

38.70

38.97

38.49

38.18

38.10

38.34

38.78

37.77

38.59

38.97

38.96

38.68
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
36.56 38.39 39.19

36.54 38.37 39.17

36.53 38.31 39.11

36.52 38.31 39.11

36.52 38.30 39.10

36.51 38.29 39.09

36.51 38.29 39.09


36.49 38.27 39.07

36.48 38.27 39.07

36.47 38.26 39.06

36.46 38.25 39.05

36.46 38.24 39.04


36.46 38.24 39.04
36.46 38.24 39.04

36.45 38.23 39.03

36.44 38.22 39.02

36.43 38.21 39.01

36.43 38.21 39.01

36.42 38.20 39.00

36.42 38.20 39.00


36.40 38.18 38.98

36.39 38.18 38.98

36.39 38.17 38.97

36.38 38.16 38.96

36.36 38.15 38.95

36.36 38.14 38.94


36.35 38.13 38.93

36.35 38.12 38.92

36.33 38.12 38.92

36.32 38.11 38.91

36.32 38.10 38.90


36.32 38.10 38.90
36.30 38.08 38.88

36.29 38.06 38.86

36.28 38.01 38.81

36.28 38.00 38.81


ELEVASI TANGGUL
BANK LEVEL
ELEVASI MUKA AIR RENCANA
DESIGN WATER LEVEL
RENCANA / DESIGN

ELEVASI DASAR SALURAN


BED LEVEL
l = 236.61 m l = 628.48 m
TRASE SALURAN R X Y L TP. 2 X = 60.846,56 PT = 196.80 R = 400.00 m 23'38" TA.2
ALIGNMENT TL TM. 2 Y = 11.990,87 l = 365.79 m
37.84 37.82

37.81 37.79

37.99 37.77

37.76 37.74

37.75 37.72

37.72 37.70

37.52 37.53

36.20 36.70

35.10 37.50

37.50 37.50

37.35 37.38

37.33 37.33

37.30 37.30

37.28 37.28

37.27 37.26

37.23 37.23

37.20 37.20

37.18 37.18

37.16 37.15

37.15 37.14

37.11 37.11
ELEVASI DASAR SALURAN PEMBUANG SISI KIRI
BED LEVEL SIDE DRAIN LEFT SIDE
39.77 R = 381.00 m l = 333.49 m I = 0.0005 32.91
ELEVASI DASAR SALURAN PEMBUANG SISI KANAN I = 0.0005
BED LEVEL SIDE DRAIN RIGHT SIDE
39.77 R = 417.50 m l = 366.87 m
TIPE BANGUNAN
TYPE OF STRUCTURE
Q v k A= ha Q = 22.00 m3/dt b = 14.00 m m=2
DIMENSI SALURAN DAN DATA TAMBAHAN b h w w = 0.80 m I = 0.00015
CANAL DIMENSION AND ADDITIONAL DATA m I A k= V = 0.70 m/dt h = 1.78 m

POTONGAN MEMANJANG
LONGITUDINAL SECTION

STANDAR PERENCANAAN IRIGASI SALURAN SITUASI DAN POTONGAN MEMANJANG SALURAN IRIGASI 303
Cut = m2 Cut = m2

Fill = m2 Fill = m2
0.60 3.50 14.00 5.00 0.60 0.60 3.50 5.16 14.00 5.00
2
5.16
BPT Stripping = m Stripping = m2
CL 1.00 3.00 1.00 BPT CL 1.00 3.00 1.00
ROW 1.00 1.00 ROW
1 : 20 1 : 20 BPT 1.00
+39.40 +39.40 1 : 20 1 : 20
ROW +39.01 +39.01
+38.30 +38.21
1 2 2 2 1.00
+37.75 1 1 +37.72 1 1 2 1 BPT
1 +36.52 1 1 1
1 1 +36.50 +36.43 ROW
bidang persamaan kupasan galian kupasan bidang persamaan galian +35.30
= 0.20 m = 0.20 m kupasan
reference level stripping excavation stripping reference level = 0.20 m excavation kupasan
stripping = 0.20 m
stripping
+ 32.00 + 32.00

38.52

38.89

38.55

37.49
38.85

38.95

38.60

38.30

38.16

38.50

38.95

38.67

38.63

36.76

36.67

36.55

36.44
ELEVASI TANAH ASLI (m) ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
JARAK / DISTANCE (m) 15.40 9.20 5.40 5.00 8.80 8.80 10.40 JARAK / DISTANCE (m) 3.80 4.80 7.60 6.40 4.20 3.00 14.00 15.80

P.23 Cut = m2 P.34 Cut = m2

Fill = m2 Fill = m2

Stripping = m2 Stripping = m2
0.60 3.50 14.00 5.00 0.60
BPT CL BPT CL 1.00 3.00 1.00
ROW 1.00 1.00 BPT ROW 1 : 20 1.00
1.00 +39.40 1 : 20 BPT
+39.28 +39.28 +39.40
ROW ROW
+38.29
2 2 1 +38.20 1
+37.72 1 1 +37.70 +37.50 1 2 2 +37.50
+36.51 1 1 1
+36.42
bidang persamaan galian kupasan bidang persamaan galian
kupasan = 0.20 m kupasan kupasan
reference level = 0.20 m excavation stripping reference level = 0.20 m excavation = 0.20 m
stripping stripping stripping
+ 32.00 + 32.00

36.88

38.77

38.78

38.79

39.06

39.03
38.66

38.81

38.93
38.95

38.98

38.95

38.93
ELEVASI TANAH ASLI (m) ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

JARAK / DISTANCE (m) 17.00 7.40 14.40 11.00 JARAK / DISTANCE (m) 33.00 21.40 3.00 20.40 29.80

P.23 Cut = m2
P.35 Cut = m2

Fill = m 2
Fill = m2

Stripping = m2 Stripping = m2
0.60 5.00 5.16 14.00 5.16 3.50 0.60
BPT CL BPT
1.00 3.00 1.00 CL
ROW 1.00 ROW 1.00
1 : 20 1 : 20 1.00 BPT 1 : 20 1 : 20 1.00
+39.04 +39.04 +38.97 +38.97 BPT
+38.24 ROW ROW
+ 38.17
+37.61 2 2 +37.60 1 2 2 1
1 1 +37.35 1 1 +37.35
+36.46 1 +36.39 1
bidang persamaan kupasan galian kupasan
bidang persamaan kupasan galian
stripping
= 0.20 m = 0.20 m
= 0.20 m kupasan reference level excavation stripping
reference level stripping excavation = 0.20 m
stripping
+ 32.00 + 32.00

38.97
38.57

38.57

38.37
ELEVASI TANAH ASLI (m)
39.63

38.67

38.44

38.15

38.20

39.04
ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

JARAK / DISTANCE (m) 22.60 22.40 21.60 28.20 JARAK / DISTANCE (m) 21.80
1.60 24.00 24.60

P.28 Cut = m2 P.36 Cut = m2

Fill = m2 Fill = m2

2
Stripping = m Stripping = m2
0.60 3.50 5.16 14.00 5.16 5.00 0.60 0.60 5.00 0.60
5.00 14.00
BPT
CL ROW 1.00 3.00 1.00 CL
1.00 3.00 1.00 1.00
1 : 20 1 : 20 1.00 BPT
BPT 1 : 20 1 : 20 + 38.86 +38.86
+39.01 +39.01 1.00 ROW
ROW 1.00 1 1 BPT
+38.21 1 1 1 +38.07 1 1
1 2 2 ROW 1 1 2
1 +37.11 2 1 1 +37.11
1 +36.43 1 +36.28 1
+36.70
+36.20
kupasan
bidang persamaan kupasan galian
bidang persamaan kupasan galian = 0.20 m = 0.20 m kupasan
stripping
= 0.20 m
stripping reference level stripping excavation = 0.20 m
reference level excavation stripping
+ 32.00
+ 32.00

39.111

38.66

38.60

38.58

38.62

38.45
ELEVASI TANAH ASLI (m)
37.94
38.66
37.37

36.50

36.79

37.00

37.11

ELEVASI TANAH ASLI (m) ORIGINAL GROUND LEVEL


ORIGINAL GROUND LEVEL
34.80 JARAK / DISTANCE (m) 16.20 9.80 4.00 14.40 16.20
JARAK / DISTANCE (m) 14.00 14.20 17.00 15.00 7.00

P.33 P.46

0 5 10 15 20 m
S, 1 : 20

STANDAR PERENCANAAN IRIGASI SALURAN POTONGAN MELINTANG 304


P.29
25.12 24.98
B 25.21
24.09 24.35
25.41
25.67 25.55 25 24.98
25.8 .5
0
.05 24.10
24.98
25.34
24.82 25.67 25
0
5.40 26.0
25.4
4
24
.9
24 0
GARIS SAMBUNG
24.70 8 25.06 PT .98 MATCH LINE
TP5 .48 25.10
25.3 25 25.36 23.
25.67 25.73
25.5
0 1 .05 TP7 93
25 0
5.20
24.3
2

00
25.05
25.67
25.4
1
25.4
0
25.8
0 6 24
.05 24 C

46.6
.1 7 25.21 .85 23
25.77 Hm157 25 M BS
P.A
.76 25
TA5 25.8 24.4 .30 T 149 25.16
25.353 25.12 .15
0 25.4 7 24 m.2 25
4 .32 .26 25.316 25 24.9 24 .37
25.67 25.15 24.7 25.0 .32 25 25 .34
.30 0 .72

00 M
4 25 24
25.67 26.0 24.6
0
25
148 25.16 .62
25.40
25.8 25.8
0 5 6 .27 .81 25.28 24.6
2
0 25 24 .98
25.02 24 25 24
25.2 24.6 24.9 .45 .01 24 24.91 25.12 147 25.371 .62 .00 .62

00
25.0

R=2
25.1 25.0 25
25.59
8 4 9 3 7
9 .12 24 24 24 24
25.2 25 25.16 .89

46.8
25 .27 .97
GARIS SAMBUNG 3 24.3 25.4 .69 24.98 24.96 .3
25.6 9
25.8
0 7 25.4 24.7 4 .18 .51 .32 24 24 25.2 0 23
25 25 24.98 24
MATCH LINE 5 2 24.7 4 9 4.6 25 0 .55 24 .8 25 28 .76
5.
.74
15
2 .98 7
2 .0
24.6
24.6
0 25.0 25.59 .45 .81 .26
24 24.98 .18 24 25
.02
B 4 25.0 25.4 9 25 24 .26 25.10 24 25 .53 23
25 25 5 .76
24.6 8 25.8 9 4 .32 .18 25 25.0 .87 24
.64 .30 24
.14
8 0 25.13 25 24
25.5 25.0 .27 24 24.7 146 24 24
P.11 P.12 24.5 3 7 25.2 24 .24 .81 .8 1 .62 3 24
. .62 .62
P.13 2 25.5 25.4 0
4.2
7 24 .25 25.32 24 24 P.28 25 62 Hm
0 4 25.5
25 2
2 24 .27 1 .32 25 .00 145
P.14 25.3
25.4
4
25.0
4 25 .09 25.03 24 .81 15 .24 25 24
.69 24.6
2 24
.00
25
24.9 2 25.0.695 24 .27 24 .34 .62 .02
0
25
. 00
7 24.5 24 20 6 23
25.8 2 24 6 . 5.2 24.5
5 24 .76
24.9 153 2 .00 24 2 .62 24
TM
24.5 25.54 24
25.8 0 2 7 4.5 23 5.03 P.30 .54 .1
P.15 0 24.1 25.2 24.6 152 2
2 .24 P.31 P.32 24 25 24 5
23.9 4 0 25.30 TM 0 .54 24 24 .88 .19 . 6
24 6

00 M
25.2 25.2 .62 2
0 0 0 6 .81 P.27
24
.62
0 24.5
25.0
3 24
5.20
3 24
23.8
2
25.3 25.09 24.5 5.0 .32 P.33 25 .79 24
24.9 2 3 2 25 .85 .63
0 4 25.0

R=2
3 24 3
25.7 25.5 25.12
.45 P.26 .
1 9 TP 25 P.34 24 62
25.0 24.9 6 . 0
24 68 5.20
P.16 24
7
25.24 24.8 5 .36 .62 .24
4 25 24
00 M
PT 4 .18
P.17 25.3 P.35 24
P.25

00
24.5 .12
P.18
R=3

2 24

46.0
.03
25.1
8 P.36 C
P.19
P.24 0
P.20 4.80P.37
P.21 P.22
P.23 P.38

00
5 .000

46.2
n.2
L
.A
SP
IP
AN B
TL
B AT
M E
JE IDG
TM TA BR

R R

V 0 1 2 3 4 5 6 7 8 9 10 m
SV = 1 : 100
0 20 40 60 80 100 120 140 160 180 200 m
H SH = 1 : 2000

bidang persamaan / reference level


+18.00 m
PATOK HEKTOMETER
HECTOMETER STONE Hm 157 Hm 156 Hm 155 Hm 154 Hm 153 Hm 152 Hm 151 Hm 150 Hm 149 Hm 148 Hm 147 Hm 146 Hm 145
NOMOR PROFIL P.11 P.12 P.13 P.14 P.15 P.16 P.17 P.18 P.19 P.20 P.21 P.22 P.23 P.24 P.25 P.26 P.27 P.28 P.29 P.30 P.31 P.32 P.33 P.34 P.35 P.36 P.37
PROFILE NUMBER

2735.11
2995.62
2151.17

2547.40

2554.63

2592.91

2983.35

3029.87
2197.91

2242.28

2346.79

3225.43

3326.14
2144.12

2296.03

2496.31

3028.08
2691.37

2844.34

2889.66

2936.21

3077.90

3174.00
2745.24

3124.21

3274.77
2644.87

2793.91
2447.24

2843.60
2093.96

10.13
7.23
7.05
2045.34

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE 50.16 41.74 49.37 53.75 50.76 48.83 51.62 49.07 51.09 38.28 51.96 46.50 43.74 48.67 49.69 45.32 46.55 47.14 44.73 48.03 46.31 49.85 51.37 49.34 51.37
ACCUMULATED DISTANCE 48.62

ELEVASI TANGGUL KIRI


LEFT BANK LEVEL
YANG ADA
EXISTING

ELEVASI TANGGUL KANAN


RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
24.79

25.64

25.64

25.18
24.60

25.38

25.12

25.43
25.67

25.47

25.09

24.71

25.29

24.80

24.01

25.48

25.16

25.26

25.07

25.01

25.12
25.40

25.25

25.03

25.04

25.64

25.00

25.29
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

ELEVASI TANGGUL
BANK LEVEL
22.86 24.16

22.71 24.01
23.02 24.28
23.02 24.28

22.61 23.91

22.59 23.89

22.30 23.60

22.28 23.58
22.81 24.11

22.78 24.08

22.76 24.06
23.07 24.33

22.97 24.24

22.95 24.21

22.92 24.18

22.90 24.16

22.68 23.98

22.63 23.94

22.56 23.86
23.06 24.31

23.00 24.26

22.83 24.13

22.78 24.08

22.69 23.98

22.40 23.70

22.37 23.67

22.33 23.63
22.73 24.03

22.66 23.96

22.54 23.84

22.35 23.65
ELEVASI MUKA AIR MAKSIMUM
DISCHARGE LEVEL
RENCANA / DESIGN

ELEVASI DASAR SALURAN


BED LEVEL
X = -47.146, 35; R = 3.00 m X = 46.687, 60; R = 2.00 m X = 46.395,82; R = 2.00 m
TRASE SALURAN R X Y L Y = +5349,10; l = 114.42 l = 403.46 m TM Y = 5.030,94 ; l = 180.48 m TP.6 TA l = 409.23 m l = 298.06 m
Y = 5.119,81 ; l = 183.74 m TP.7
ALIGNMENT TL
TM TA
IP.5

TIPE BANGUNAN
TYPE OF STRUCTURE

Q = 3.00 m3/dt b = 3.00 m m = 1.5 Q = 4.00 m3/dt b = 4.00 m m = 1.5


Q v k
DIMENSI SALURAN DAN DATA TAMBAHAN b h w
CANAL DIMENSION AND ADDITIONAL DATA V = 0.49 m/dt I = 0.0005 V = 0.52 m/dt
m I A h = 1.26 m h = 1.30 m I = 0.0005

POTONGAN MEMANJANG
LONGITUDINAL SECTION

STANDAR PERENCANAAN IRIGASI SALURAN SITUASI DAN POTONGAN MEMANJANG SAL. PEMBUANG 305
Cut = m2
Cut = m2
Fill = m2
Fill = m2 BPT
BPT BPT BPT ROW
ROW Stripping = m2
ROW ROW CL
CL Stripping = m2
1.00
1.00 1.00 1.00
+23.93
+24.38 1 1 1
1 1.5
1.5 1.5 bidang persamaan 1.5
+23.02 +22.63
bidang persamaan reference level 4.00
reference level 3.00
+ 20.00

26.58

24.01

25.22
+ 20.00 ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL

26.08

25.32

24.79

24.74
ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL JARAK / DISTANCE (m) 16.30 16.90
JARAK / DISTANCE (m) 14.00 10.40 28.60

P.27
P.13
Cut = m2
Cut = m2
Fill = m2
Fill = m2 BPT BPT
BPT ROW ROW Stripping = m2
BPT ROW = m2
CL
Stripping
ROW CL
1.00 1.00
1.00
1.00
1 +23.86 1
+24.16 1 1.5 1.5
1
1.5
bidang persamaan +22.56
1.5
bidang persamaan +22.90 reference level
4.00
reference level 3.00 + 20.00

25.66

25.24

25.16

25.13

25.00
+ 20.00 ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL
25.03

25.02

25.09

25.35
ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL JARAK / DISTANCE (m) 31.00 15.80 4.60 20.50
JARAK / DISTANCE (m) 20.00 15.00 24.00

P.18 P.30
Cut = m2
Cut = m2
Fill = m2
Fill = m2 BPT BPT
BPT ROW Stripping = m2
BPT ROW ROW
Stripping = m2 CL
ROW CL
1.00 1.00
1.00
1.00

+23.70 1
1 1 1.5
1 +24.04
1.5 1.5 bidang persamaan 1.5
reference level +22.40
bidang persamaan +22.78
reference level 4.00
4.00 + 20.00

25.32

25.28

25.12

24.99

24.86
+ 20.00 ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL
25.52

25.86

25.65

25.49

25.54

25.54

25.96

25.02
ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL JARAK / DISTANCE (m) 13.60 7.60 13.40 18.70
JARAK / DISTANCE (m) 4.00 1.4 2.70 13.30 2.00 13.80 14.70
P.32
P.21
Cut = m2
Cut = m2
Fill = m2
Fill = m2 BPT
BPT ROW Stripping = m2
BPT CL
BPT = m2 ROW
ROW Stripping
ROW CL 1.00
1.00
1.00
1.00
1 +23.60 1
1 +24.04 1 1.5 1.5
1.5 1.5 bidang persamaan
+22.30
bidang persamaan +22.71 reference level
4.00
reference level 4.00 + 20.00

24.99

25.01

25.18

25.00
+ 20.00 ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL
24.96

25.06

25.02

26.06

ELEVASI TANAH ASLI (m) 9.00


ORIGINAL GROUND LEVEL JARAK / DISTANCE (m) 20.00 15.90
JARAK / DISTANCE (m) 15.40 7.00 21.40
P.36
P.24

0 5 10 15 20 m
S, 1 : 200

STANDAR PERENCANAAN IRIGASI SALURAN POTONGAN MELINTANG SALURAN PEMBUANG 306


P.126
P.1
T.P.10 25 29.13
27
P.1 30.01
P.1
28
.5 5
29.4
2 U
30
29.3 N
24 P.1
30.6
.31 30.12 5 5
P.1 30 29
GARIS SAMBUN
F

PT
G

55
.45 .85
30 30 30.098
29.7 P.1 MATCH LINE
R 8

.60
=2 .44 TA.
30.5
5
30.2
3 0 0
30 1 29.7
00 0 8

0
m 1A 284 30.4 P.1

m
.35 5
2 30 29.8
31
P.1
5 29.74 2
0.4
285

250
3 29.7 29.0
7 P.1 5
4
283 32 P.1 30
.2

55
30.2
.78
21 29 73 29.7
3 3

81
1
P.1
30.2
E 29.93 30.4

R=
.2 0
7

30.5
.83 .35 29.8 0

0
Hm 32 6

33.3
29 30.2

7
28.8

6
0

36.1
29.44 0
28 29.6

38.9
29.95

7
5 5 78 29.3 28.55
.33

4
30.1 .42

41.7
.1 4
32

03
44.6
0 +8 30 1 29
ti
29.8
9 .94
P.11 P.12
2 .98 .25

45.7
30 6 29.1
GARIS SAMBUNG .38 P.1

8
bu
32 30 7

46.4
P.117 29

Hm 287 +78

2
P.115 34

7
.85 .29

45.8
29.7 28 29.9 29.7 29.93

40.4
MATCH LINE P.116 TA.9 31
.37
4 30.0
2 2 31 2 30
a m

3
P.113 P.118 31
ah

38.4
29.54

3
29.8

1 4
P.114 0
.13

34.0
30.8
1.0 3
30 29.8 L
S.
3
SPUn 1/75
29.7 29.7 29.4

30.8
4
.94
2 8 59 29.5 P.1

0
30.32 29.6

30.2
30 3 .70
P.139

+30
1
29.14
30.15 31
.29 6 29.5 35 29.13 29
30.25 30.32 31.60 28 .94 6 29.6
P.1

+45
29.93 30.80 30 29.5 0
EP

+40
04 29.7

+35
3 29.6
30.24 30.26 29.63 30.77
31
.32
3 0.8 2
281
68 29.6
4
30.2 27.9
36 P.138 29
.9
9
30.78 31.68 29.54

m
29.29 31.57 0 7 30.19
28.83 29.8 3
30.60 .27 29.5 29.9
29
.0

+45
31 0 29.54
31.56 .43 .10
29.2 29.2 04 7 28.61

200
30.42 30.12 31 1 8 29.4
31 30.1
.13

58
8

+40
9
.49 32 6 29.7 29.6 28.55

.5
29.94
31 29.7 30.19

55
7

32
29.06 30.46 32.47 9 29.8 29.75 28.84 27.97
31.89 31.68 .94 29.3 9 29.5
5

R=
31.80 4 28.8
30 93 29.40 27.85

.0 0
29.7 28.10
2
.8 31.926 31.757 EM.9 31
.31
30
.41 R 280 5 29.9 29.52
.76
29.89 30.21
31.393 31 31.933
31.208
=2 29.4
3
7
30.00 27.54 30.08
28

0
29.91 28.7 28.49
30.88
287 TP.9 00 29.7 6 0 29.40

1
29.4
29.5
TM.

.8
.32 m 1 02 28

30
27.69
29.23 31 29.93
11 28.6.444 29.00 29.81 29.27

30
29.72 31.53 31.90 28.948
289 29.3 29.40

37.71 31.
288 29.40
.43
400
Hm290 29.71 2 31 28.8 8 29.8 29.61
31.8

8
4 41
15.
29.86

30.24
31.95

31.97
38

34.76
35.65

.3
29.3
27.69

PT

36
29.8 30.35
29.21
29.93 31.95
31.89 29.3
1 1 279 29.61 28.57
30.12 29.86
31.42 31.86
29.73 32.49 3 29.3 28.94
29.71 31.8 29.7 8
31.92 4 30.24 29.74
29.00 29.90 29.53
31.81 29.9 29.70
Hm277
31.80 29.6 7 TP.11 278
31.80 1
7
29.40 BTLn.2 28.91
30.2 29.7
4
29.93 30.35
4 29.21
P.112 0 29.1 29.05

15 .40

54
29.40 28.98

.80
E PT

SI
0

AA
P.137 400 P.140
15.

UN

54
200
15.

P.

.40
55

S.
F

0
.40
0

L
GU
NG
S TA NE
A L I
L DA ER
PA ENT
IP AN EL S LI C
L A P PIN
TL
UL JA EV H O
U RL NA TT TU
N GG AH E TA L A TID PAS
TA SI B ULD ASI EVE AL AN
TM TA
SI A O E V L
VA VEL EV SH EL UND OU G S
E
EL P LE EL AD O TL UR
RO GR ET U
T
R R
TO

V 0 1 2 3 4 5 6 7 8 9 10
SV = 1 : 100
0 20 40 60 80 100 120 140 160 180 200
H SH = 1 : 2000

bidang persamaan / reference level


+26.00 m
PATOK HEKTOMETER
Hm 290 Hm 289 Hm 288 Hm 287 Hm 286 Hm 285 Hm 284 Hm 283 Hm 282 Hm 281 Hm 280 Hm 279 Hm 278
HECTOMETER STONE
NOMOR PROFIL P.113 P.114 P.115 P.116 P.117 P.118 P.119 P.120 P.121 P.121A P.124 P.125 P.126 P.127 P.128 P.129 P.130 P.131 P.132 P.133 P.134 P.135 P.136 P.137 P.138 P.139 F
PROFILE NUMBER P.112

20.00
5978.21

6125.21

6775.68
6322.20

6795.68
30.69
6372.22

6741.22
6174.21

6272.50

6591.36

6660.72
5776.89

5941.21

6081.21

6421.88

6690.72
5894.39

6224.27

6471.61

6571.36
5851.89

6521.17

6622.05
5818.89

20.00
5728.39
5617.89

5681.39
5572.39
5520.64

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE 45.50 53.50 47.00 47.50 43.00 33.00 42.50 47.82 36.00 103.00 44.00 49.00 50.56 48.23 49.70 50.02 49.66 49.73 49.56 50.19 38.67 30.0 50.50 34.46
51.75
ACCUMULATED DISTANCE

ELEVASI PUNCAK
YANG ADA
EXISTING

TOP LEVEL

28.30
29.69
29.36
29.93
29.45

29.68
29.03
29.78

29.87

29.49

29.56
29.62
30.03
28.76
30.43
31.86

31.32
31.78

31.93

30.22

30.03
31.86

30.45

32.66
32.11
29.50
29.89

30.13

ELEVASI TANAH ASLI PADA AS TANGGUL


ORIGINAL GROUND LEVEL IN CENTER LINE

33.00
33.01
33.03
33.06
33.10

33.08
33.11
33.12
33.26

33.23

33.20

33.15
33.18
33.28
33.31
33.39
33.53

33.49

33.36
33.58

33.55

33.34
33.51

33.46

33.44
33.60
33.64
33.64
29.89

ELEVASI TANGGUL
BANK LEVEL
ELEVASI MUKA AIR BANJIR
DESIGN FLOOD LEVEL

30.22
30.22
30.27
30.07
30.22

30.22

30.22
30.22
30.28

30.26

30.22
30.23

30.22
30.34
30.89

30.35
31.33

31.40

30.67
31.24

31.28

30.38
31.36

30.93
31.19
30.67
30.62
30.57

ELEVASI BAHU JALAN


RENCANA / DESIGN

ROAD SHOULDER LEVEL


TP.11
R = 2.00 m ; X = -55.188,87 R = 2.00 m ; X = -54.965,00 l = 422.88 m TM.11 R = 250 m ; X = -54.514,52 TA.11 l = 45.18 m
R X Y L l = 223.25 m TM.9
TRASE TANGGUL l = 190.32 m ; Y = 15.241,12 TA.9 TM.10 l = 266.46 m ; Y = 15.376,00 l = 119.45 m ; Y = 14.921,33
ALIGNMENT TL TA.10
TA.8

TIPE BANGUNAN
TYPE OF STRUCTURE
B = 2.00 m bi = 2.00 m B = 2.00 m bi = 6.00 m
Q v k
DIMENSI TANGGUL DAN DATA TAMBAHAN b h w
m I A mo = 2.5 mi = 2.0 mo = 2.5 mi = 2.0
DIKE DIMENSION AND ADDITIONAL DATA

POTONGAN MEMANJANG
LONGITUDINAL SECTION

STANDAR PERENCANAAN IRIGASI SALURAN SITUASI DAN POTONGAN MEMANJANG TANGGUL BANJIR 307
Cut = m2 Cut = m2

2.00 5.48 6.00 0.60 2.00 5.34 6.00 0.60


Fill = m 2 Fill = m2
CL CL
BPT +33.66 BPT = m 2 BPT Stripping = m2
elevasi M.A.B Stripping elevasi M.A.B BPT +33.20
ROW 2 ROW ROW
design flood level 1.00 2.5 +30.92 design flood level ROW 2.5 2
1 +30.53
1.00 1 1 : 20 1 1
+30.62 1.00 1.00 1.00
1.5 +30.23
1 1.5 1.5 1.5
1 1 1
+28.25 +28.13
bidang persamaan bidang persamaan
reference level kupasan reference level
= 0.20 m kupasan
stripping = 0.20 m
+ 24.00 + 24.00 stripping

29.34

29.72

29.45

29.49

29.72

29.80
30.47

30.21

30.15

29.71

29.93
ELEVASI TANAH ASLI (m) ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

JARAK / DISTANCE (m) 26.80 4.00 19.20 14.80 JARAK / DISTANCE (m) 16.80 17.40 3.00 18.00 19.00

P.113 P.131
Cut = m2
Cut = m2
CL BPT Fill = m2 CL
BPT ROW
+33.46 BPT BPT Fill = m2
ROW +33.10
+31.23 Stripping = m2 ROW ROW
1.00 +30.52
1.00 Stripping = m2
+30.93 1.00 1.00
+30.22

+38.88
+28.21
bidang persamaan bidang persamaan
kupasan reference level
reference level stripping
= 0.20 m
kupasan
= 0.20 m
+ 24.00 stripping
+ 24.00

29.77

29.75

29.70

29.45

29.58

29.61
ELEVASI TANAH ASLI (m)
30.14

30.45

30.64

30.96

30.80
ELEVASI TANAH ASLI (m)
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

JARAK / DISTANCE (m) 32.20 11.00 18.00 20.00 JARAK / DISTANCE (m) 12.80 18.20 3.00 11.40 14.40

P.121 P.135
Cut = m2
CL Cut = m2
BPT Fill = m2 CL
BPT ROW BPT
+33.39 Fill = m2
ROW BPT +33.03 ROW
+31.19 Stripping = m2
1.00 ROW +30.52
1.00 Stripping = m2
1.00
+30.89 +30.22
1.00

+28.88
+28.16
bidang persamaan
bidang persamaan kupasan reference level
reference level = 0.20 m
stripping kupasan
= 0.20 m
+ 24.00 stripping
+ 24.00

29.48

29.55

29.56

29.56

29.77
ELEVASI TANAH ASLI (m)
30.45

30.44

30.45

30.75

30.58
ELEVASI TANAH ASLI (m) ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
2.40 15.30 24.40 JARAK / DISTANCE (m) 21.20 11.00 6.60 22.40
JARAK / DISTANCE (m) 32.00

P.124 P.138 Cut = m2

Fill = m2

Cut = m2 0.60 Stripping = m2


2.00 4.18 6.00
2.00 6.00 0.60
CL BPT
CL Fill = m 2
BPT BPT +33.01 ROW
BPT 2
+33.36 ROW ROW 2.5 +30.52
ROW +30.97 Stripping = m2 1 1.00
2.5 2 1
1.00 1 1 1.00 1.00 +30.22
+30.67
1.5 1.5
1.5 1.5 1 1
1 1 +28.14
+28.66
bidang persamaan kupasan
bidang persamaan reference level = 0.20 m
kupasan stripping
reference level stripping
= 0.20 m
+ 24.00
+ 24.00

29.42

28.94

29.67
29.65

29.74

30.15
ELEVASI TANAH ASLI (m)
30.59

30.31

30.85

30.22

30.12

29.78

ELEVASI TANAH ASLI (m) ORIGINAL GROUND LEVEL


ORIGINAL GROUND LEVEL
JARAK / DISTANCE (m) 13.80 18.80 1.00 15.00 26.80
JARAK / DISTANCE (m) 17.00 19.00 6.00 25.00 19.60

P.125 P.139

0 5 10 15 20 m
S, 1 : 200

STANDAR PERENCANAAN IRIGASI SALURAN POTONGAN MELINTANG TANGGUL BANJIR 308

Vous aimerez peut-être aussi