A - FOOTING DETAILS
CMU WALL
GRID
(TYP.) @ 400 (TYP.) @ 400 TOP OF S. SLAB
TOP OF S. SLAB
EL. (SEE PLAN) SLAB MASTIC SEALANT MASTIC SEALANT EL. (SEE PLAN)
(SEE PLAN & SCHED.) DOWEL DOWEL (TYP.)
(TYP.) WHERE OCCURS
TIES BITUMINOUS DAMPPROOFING
NGL OR FGL TIES TIES VERT.BARS
BITUMINOUS DAMPPROOFING (TYP.) BITUMINOUS DAMPPROOFING VAPOR BARRIER
CENTERLINE OF DOWELS TO MATCH DOWELS TO MATCH VAPOR BARRIER
COLUMN VERT. BARS 'g'BARS COLUMN VERT. BARS 100mm. THK. HORI.BARS 100mm. THK.
FOOTING & COL.
"a" BARS (SEE SCHED.) 'f'BARS DRAINAGE FILL DRAINAGE FILL
'f'BARS 'f ' BARS
COMPACTED COMPACTED
"b" BARS (SEE SCHED.) GRANULAR GRANULAR
FILL (TYP.) FILL (TYP.)
GRID
'e'BARS
BOTTOM OF FOOTING T&B
GRID EL. (SEE PLAN)
125
T.O.G.S.
100
VAPOR VAPOR
BARRIER BARRIER
TIE BEAM (SEE 100 THK. F.G.L.
INTERIOR DRAINAGE FILL
TIE BEAM PLAN & SCHED.) TIE BEAM GB
DRAINAGE FILL WHERE OCCURS SEE PLAN & SCHED.
VAPOR BOTTOM BARS 50 MM CONCRETE BLINDING
100 THK.
BARRIER SAME AS BOT. BARS
F.G.L.
100 THK.
DRAINAGE FILL
(TYPICAL)
CONTROL JOINT W/ SEALANT 100 THK CMU WALL 200 THK. CMU
THK.=125mm CONTROL JOINT
WHERE REQUIRED SLAB ON GRADE
WITH SEALANT (SEE PLAN)
CHAIR BAR DOWELS @ 300 SLAB REINF. FOR TOP OF SLAB EL. AND
(SEE PLAN) REINFORCEMENT, SEE PLAN SLAB ON FILL
(SEE PLAN)
FOR DEPTH OF DEPRESSION FOR REINF.
MINIMUM SLAB ON GRADE C SUBMISSION NO.3 July 2017
T.O.S.SLAB
EL. (SEE PLAN)
COORDINATE WITH PG DWG. FOR REINF.
(SEE PLAN)
1 (SEE PLAN) REINFORCEMENT SCHEDULE B SUBMISSION NO.2 July 2017
DETAIL OF JOINTS TYP.INTERIOR WALL TYP.INTR.WALL FOOTING DETAIL WHERE NOTE: WWF ARE IN CONFORMITY WITH TO BS 4483
WHICH ARE READILY AVAILABLE IN THE KINGDOM.
C-1 TYP.EXTERIOR STAIR SECTION C-2 IN SLAB ON GRADE C-3 (FOR 100 THK.CMU) C-4 DERRESSION OF GRADE SLAB IS REQUIRED C-5 AT CHANGE IN LEVEL C-6 AT FREE EDGE
SE-002 SE-002 SE-002 SE-002 SE-002 SE-002 N.T.S.
N.T.S. N.T.S. N.T.S. N.T.S. N.T.S.
(CONT)
(CONT) (CONT) SAUDI ARABIA
CONCRETE CURB DOWELS
REF. TO AR. DWGs.
(CONT)
EL.99.925
T.O.TIE BEAM (CONT)
(CONT) (CONT)
F.G.L. VAPOR
BARRIER (CONT)
COMPACTED FILL
VAPOR COMPACTED FILL
BARRIER 100 THK.
(CONT) DRAINAGE FILL
100 THK.
VAPOR
DRAINAGE FILL TIE BEAM BARRIER PROJECT
BLIONDING SEE PLAN & SCHD. (CONT)
100 THK.
CONC. DRAINAGE FILL
OWNER
C-7 SECTION C-8 SECTION C-9 SECTION C-10 SECTION C-11 SECTION
SE-002 1:20 SE-002 1:20
SE-002 1:20 SE-002 1:20 SE-002 1:20 JIP AUTHORITY
SEA PORT
LOCATION
JEDDAH ISLAMIC
D-COLUMNS DETAILS
SEA PORT
-- --
-- --
1 -- --
6 (MAX) -- --
1
(MAX)
6 -- --