SECTION A6
MODEL CB 15-100 HP
SAMPLE SPECIFICATIONS - STEAM
1.01 Boiler Characteristics (Steam) ................................................................................................................ A6-36
1.02 General Boiler Design............................................................................................................................. A6-36
1.03 Steam Boiler Trim ................................................................................................................................... A6-37
1.04 Burner and Controls................................................................................................................................ A6-38
1.05 Efficiency Guarantee .............................................................................................................................. A6-44
1.06 Warranty ................................................................................................................................................. A6-45
1.07 Shop Tests .............................................................................................................................................. A6-45
1.08 Start-up Service ...................................................................................................................................... A6-45
MODEL CB 15-100 HP
MODEL CB STEAM BOILER (15-100 HP, STEAM 15-350 PSIG)
4. Rear refractory and insulation shall be contained in the formed door, which must
swing open for inspection of brick work.
5. The boiler tubes shall not include turbulators, swirlers or other add-on
appurtenances.
6. Front and rear tube sheets and all flues must be fully accessible for inspection
and cleaning when the doors are swung open. The boiler shall be furnished with
adequate handholes to facilitate boiler inspection and cleaning.
7. The exhaust gas vent shall be located near the front of the boiler on the top
center line and shall be capable of supporting:
• 15-100 hp. 1000 lbs and shall contain a stack thermometer
8. The boiler shell shall contain a chemical feed connection.
C. Observation ports for the inspection of flame conditions shall be provided at each end
of the boiler.
D. The boiler insulation shall consist of a 2 inch blanket under a sectional preformed
sheet metal lagging. This insulation must be readily removable and capable of being
reinstalled, if required.
E. The entire boiler base frame and other components shall be factory painted before
shipment using a hard finish enamel coating.