ZETO RULES
Permit to Work? Overriding or Disabling SCE Working at Height Lifting Operations Ignition Source Control
Hazardous Chemical
Energy Isolation Confined Space Entry Excavation Driving
Handling
APPROVED BY:
Step Description of Potential Hazards & Who or What RISK Control and /or Recovery Action/
No Basic Task /Step Consequence might be Harmed RATING Measures Responsible
(P E A R)) Inherent / Person(s)
Initial
1. Delivering tools / equipment 1.1 Hit by moving P, R C3 1.1.1 Signalman to PJC / Work
to working area. machinery / vehicle. assist moving Crew
machinery /
vehicle.
C3 1.1.2 Wearing high- PJC / Work
visible vest at all Crew
time.
1.2 Sharp edge / cuts. P C3 1.2.1 To wear cut PJC / Work
resistant hand Crew
gloves at all
1.3 Equipment / Tool P C3 time. PJC / Work
drop onto feet. 1.3.1 To wear safety Crew
C3 shoes at all time. PJC / Work
1.3.2 Extra precaution Crew
when lifting and
carry equipment
1.4 Ergonomic. P C2 / tool. PJC / Work
1.4.1 Minimum 2 Crew
workers to carry
heavy or long
C2 equipment. PJC / Work
1.4.2 Practice proper Crew
body positioning
while lift and
carry tools /
equipment.
Step Description of Potential Hazards & Who or What RISK Control and /or Recovery Action/
No Basic Task /Step Consequence might be Harmed RATING Measures Responsible
(P E A R)) Inherent / Person(s)
Initial
1.5 Slip, trip and fall P C2 PJC / Work
due to poor 1.5.1 Keep work area Crew
housekeeping inside tidy at all time.
work area.
1.6 Usage of faulty P, R C2 PJC / Site
tools or equipment. 1.6.1 All tools and Supervisor
equipment need to
be inspected prior
C2 to use. PJC / Site
1.6.2 Faulty tools and Supervisor
equipment need to
be tag red and
remove from
worksite.
3. Install new vent stack frame. 3.1 Slip, Trip and Fall P C3 3.1.1 To practice PJC/ Work
proper housekeeping. Crew
3.2 Contact with P C3 3.2.1 To wear hand PJC/ Work
concrete gloves while carry out Crew
the task.
C3 3.2.2 To wear dust PJC/ Work
mask while carry out the Crew
task.
C3 3.2.3 To wear safety PJC/ Work
glasses while mixing the Crew
cement.
C3 3.2.4 SDS to be PJC/
available and updated. Supervisor
3.3 Vent stack frame P, A C3 3.3.1 To place support PJC/ Work
fall for the vent stack frame. Crew
3.4 Ergonomics P C2 3.4.1 Minimum 2 PJC/ Work
workers to carry heavy Crew
3.4 Muscle strain P or long equipment.
C2
Step Description of Potential Hazards & Who or What RISK Control and /or Recovery Action/
No Basic Task /Step Consequence might be Harmed RATING Measures Responsible
(P E A R)) Inherent / Person(s)
Initial
3.4.1 Practice proper PJC/ Work
body positioning while Crew
lift and carry tools /
C2 equipment.
3.4.2 Buddies system PJC/ Work
when lifting heavy or Crew
long object.
4. Install vent pipe. 4.1 Vent pipe fall P, A , R C3 4.1.1 To wear hard hat PJC/ Work
to the ground. at all time. crew
C2 4.1.2 Buddy system PJC/ Work
while working. crew
C2 4.1.3 Appoint worker PJC/
to hold the vent pipe Supervisor
when it being fasten.
4.2 Sharp edge / P C2 4.2.1 To wear cut PJC/ Work
pinch point. resistance hand gloves at crew
all time.
4.3 Falling object. P, A C2 4.3.1 Toe board to be PJC/ Work
installed properly. crew
C2 4.3.2 Secure all tools. PJC/ Work
crew
C2 4.3.3 All workers must PJC/
wear hard hat with chin Supervisor
strap at all time.
C2 4.3.4 To wear safety PJC/ Work
4.4 Expose to P shoes at all time. crew
vapor. C2 4.4.1 To wear 3m dust PJC/ Work
mask. crew
4.5 Ergonomic. P C3 4.5.1 Work rotation. PJC/ Work
crew
C2 4.5.2 Practice proper PJC/ Work
body positioning. crew
C2 4.5.3 Apply buddy PJC/ Work
system. crew
Step Description of Potential Hazards & Who or What RISK Control and /or Recovery Action/
No Basic Task /Step Consequence might be Harmed RATING Measures Responsible
(P E A R)) Inherent / Person(s)
Initial
5. Install guard rail 5.1 Spark might lead P, E, A, R C3 5.1.1 Continuously spill PJC/ AGT/
to fire. water when performing Supervisor
hot work activity eg:
hacking work
C3 5.1.2 To cover the PJC/ Work
goose neck with crew
C3 geotextile.
5.1.2 Gas test to be PJC/ AGT/
performing before hot Supervisor
work and monitor
continuously every 2
C3 hours. PJC/ AGT/
5.1.3 An AGT have to Supervisor
ensure 0% LEL achieved
and then proceed hot
C2 work activity. PJC/ Work
5.1.4 Fire extinguisher crew
5.2 Exposed to dust P need to be available and
C2 easy to reach. PJC/ Work
5.2.1 To wear 3m dust crew
5.3 Exposed to noise P C2 mask. PJC/ Work
5.3.1 To wear ear plug crew
and ear muff.
I certified that I briefed the above subject matter of JHA to all the members of job execution team.
No Name Designation / Company / ID Date / Time Signature. Remarks
11111
.
Declaration: Job Execution / Work team.
I acknowledge receiving these instructions and understood the scope of work, hazard & risk control measures risk associated with it
and to comply with the JHA.
No Name Designation / Company / ID Date / Time Signature. Remarks
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.