Vous êtes sur la page 1sur 1

11


26
'23.
18
67
"

A L ÇA
02
01
ÇA
AL

R3,
00

R3,
00

7,00

IA
SS E
AV
TR

R3,
00

R3,
00

SA
A= C E-
## 15 SA
## 6.2
+ ## A= C - E1
co 13.00 # ## 56
ta m² ## .3
+ topo +
co 12.0 13
topo .0 ##
ta 0 subs + su 0 #m
de tra
fund to co 12.0 bstra ²
A= SA
ta
o de 0 to
fund
o 24 F
0,0
0m
²

CA

O
NA

SS
RAMPA L0

E
AC
SA
A= C-
DE AC
ESSO 2

DE
## E15
+ ## 6.4
topo13.0 ##

A
+ su 0 #m
co 12.0 bstra

MP
²
ta 0 to SIA
de
fund
VES
LA
o

RA
SA TRA
C
A= - E1
## 5

GO
+ 6
12 ## .1
topo .8 ##
+ su 0 #
co 11.8 bstra m²
ta
de 0 to

PT
EST.2
D = +19,0

=E
0.00m

fund 92()

ST
.4+
o

5,6
58
73

03
1,7
.3+
ST
=E
PC

5
CA

OR
NA

B
L0

RA
LA

TR
1

PA

AV
GO

ES
A:

SIA
RU
4
01

TR
RAMPA DE ACESSO
VE

TR
N-
E-78 9844
60 150.
68 04
.520 0 RT

EC
INÍC
ES IO DO
TA
E DO
QU
EA
UR

E
MEN
TO
O

CH HO

L=
6m
AP
RO
X.
77
.00

TR O0 08 PONTE - SOBRE
O LAGO ÁGUA PRE
TA

EC 7
DE
TA
LH
E ES
TA INÍC
VE QU ES IO DO
R PR EA TA
AN MEN QU
CH TO EA
A 05 MEN
TO

H
N-
98 N-
E-78 44 98
INÍC 60 070. E-78 4550
36 27 SA

O0
ES IO DO .570 0 79 5.95
N-
TA
QU
59
.800 0 A= C E-
30
98
E-78 44 EA
MEN 60 198
60 062. .39
32 16 TO + m²
.830 0 co 7.10
INÍC ta
ES IO DO
APROX. 63.00 + topo
TA co 6.10 su
N- QU ta bs
de tra
E-78 9844 EA
MEN fund to
60 049. TO o
27 40 AP

6
.590 0 RO
X.
INÍC 20 INÍC
.00
ES IO DO ES IO DO
TA TA
QU QU
EA EA
MEN DE INÍC MEN
TO TA TO
LH ES IO DO
E ES AP TA
RO QU
VE TAQU X. EA
MEN
R PR EA 24
N- AN MEN .00 TO
98
E-78 44 CH TO
60 029.87 A 05
23
.610 0 N-
98
INÍC E-78 4544 APROX.
ES IO DO 79 9.52 90.00
TA APRO 29

TR
QU X. 9.0 .100 0 DE
EA N- TA
MEN 0 98 LH
AP E-78 4537 E ES
TO DE RO
TA X. 51 INÍC 78 7.36 VE TAQU
AP

LH .00 35
ES IO DO .990 0 R PR EA
RO

E ES TA
APRO QU AN MEN
X. 44

VE TAQU X. 30 EA
MEN
CH TO
A 12
R PR EA
.00

.00
AN MEN TO

E
CH TO
A 05
N-
E-78 9844

CH
60 003.94
18
.330 0 N-
98
INÍC E-78 4530
ES IO DO 77 7.61
TA APROX. 64
QU DE .320 0
EA 17.0 TA
MEN 0 LH
TO E ES
VE TAQU
R PR

O0
EA
AN MEN
CH TO
A 05 APROX.
90.0
0
APRO

DE
TA
LH DE
X. 62.

E ES TA
APROX.

5
LH
DE VE TAQU E ES
00

TA R PR EA
LH TA
E ES AN MEN INÍC VE QU
R PR EA
23.0

TA CH TO
SA VE QU A 05 ES IO DO
TA AN MEN
C E-
0

A= R PR EA QU CH TO
20 1 AN MEN EA A 12
MEN
,00m 0
00 CH TO
A 05 TO
² N-
E-78 9843
60 957. N-
98 APR
08 75 E-78 45 OX.
.920 0 22 137
77 9.17 .00
INÍC 12
.400 0
APR

ES IO
TA DO APROX.
OX.

QU 21.00
EA
56.00

MEN
TO DE
TA
LH
E ES
VE TAQU

TR
R PREA
AN MEN
CH TO
APR A 12
OX.
135

TR
.00

N- AP
98

EC
E-78 43 RO
X.
60 927. 37 DE
02 46 .00 TA
.750 0 LH
E ES
L=6m

INÍC
VE TAQU

EC
ES IO DO
TA APROX. 21.00 R PR EA
QU
PASSAGEM MARIANO

EA AN MEN
MEN DE CH TO
TO TA A 12
LH

H
E ES
TA
VE QU
R PR EA
AN MEN
CH TO

H
A 05

O0
N-
12,850

98
E-78 43 AP
59 903. RO
X. 42
97 41

O0
.850 0 .00 INÍC
INÍC
ES IO DO
APRO

ES IO DO TA
TA DE QU
QU TA EA
LH
X. 17

EA MEN
MEN E ES
Ø1200 mm

N- APROX. 4.00 TO
98 TO VE TAQU
.00

11.550

E-78 43 APR

9
Ø1200 mm

59 8898 R PR EA OX.
135.00
95 AN MEN
.760 .580 CH TO
A 05 N-
98
INÍC E-78 4514

4
ES IO 76 0.04
TA DO 71
QU .990 0
EA
MEN
TO DE
APROX. TA
8.00 LH
E ES
AP

TA
RO

VE QU
R PR EA
X.

AP APRO
AN MEN
17

RO X. 76
X. CH TO
.00

26 .00 A 12
.00
DE
TA
LH
E ES
VE TAQU
R PR EA
AN MEN
CH TO
RA A A 05

MP SI
A ES
TU
DE RA BU
LA

AV
AP

ÇÃ
M
RO

O EN
X.

AC PA
TR
TR
20

AD
.00

A DO
ES DE EF
SO LU
EN
APRO

(ver
9.30
AC TE
Ø1

pran IXA
N 98
X. 4.0

CA 50
ES

CA
IXA E 78 4383 mm DE

ch DE AR
TA
0

a 03
DE 59 4.65 LH
E ES
SO TU
BU
AR
EIA 82

e 04 A
.85 TA
LA (ver VE QU

SE
ÇÃ R PR EA

EI
)
AP

O EN pran AN MEN

IXO
RO

TR ch SE CH TO
X.

IXO

RO
AD a 04 A 05
17

FL TRAD ÇÃO
RO

LA
A "F
.00

e 05

US
EN BULA
LA

DO
IRST DO

H" A "F DE

TU
) 5.4 APRO

LA
FL 7 LA

5x IRST
VA

VA
US X. 14
CO

Ø2
H" DO 0.00

DO
50
3x Ø5 SE
TA

- Ø5
Ø4

mm
00 a6 IXO
cm
mm RO
DE

a6
LA
DO
FU

cm
EL DE ENÇÃO
LA
VA
ND

FU

TU
DO

EN TR EM PV

R5.00
BU
Ø0
O:
APRO

TE AD
,8

LA

28.67
a 1,

Ø1 A DO C
+1
X.

6 cm

10
DE
10.00

mm
TA

PA .20 LH
E ES
TA

PO INEL
VE QU
R PR EA
AN MEN
LIC FO INÍC
ES IO DO
CH TO
A 12
RIS TO TA
QU
TA VOL A= SA
1.50

EA
MEN
LIN TA 24 F TO
SA
C O 2 ICO 0,0 N-
98

TR
E-78 4502
A= LAGO
20 BO 65 0m 76 2.25
34
+
00 LO
,00 NH wp ²
.620 0

N 98 co 10.0
ta 0
m² A (20 AL
AG
AD
E 78 4381
+
co 9.00
topo
PL O
CO
59 8.02 ta subs
AC TA

EC
de

E 78 4489
tra
95
AS

N 98
.98 fund to
DE

74 7.53
o
)

89
FU

.52
ND
1.50

O:
+1

HO
0 .44

TR

E 78 4492
proj. fundo biovaleta

N 98
biovaleta
proj. fundo
P0

75
NT
E DE AV

37
BIOV S.1.1

.06
a BIOV S.1. i=0,64%
MAD A= ALET

2.84
biovalet A= ALET2

ES
128.

03
fundo
proj. 146 06 m²A
i=0,64% .08 A
EIRA m²

BIOV S.1.3
BA
RR
AG
EX
ISTE
A= ALET
153
.21 A
m² SI
EM
EX
NT
E
i=0,64
%

A
PO

ISTE
NT A= SAC
leta
biova
+
A= E proj.
fundo
co 11.9 4.24 E 13
1.7 SAF
BIOV S.1.4
A= ALET
145 ta 5 3,80 8
.87 A
+ topo
NT

co 10.9
64%
N 98 i=0,
subs m²
45

E 78 4486
SAC
ta 5

N 98
A=
E 78 4382
-
de tra
1.50

624 E95
.55 .1
fund to APROX.

74 7.51
,26 60 8.82

172.00

90
91
+13.
cota 10 o
E

TR

.92
+14. de fundo
.97

topo 10
BIOVS.1. subs
a A= ALET5 trato
alet 117
.29 A

RU
o biov m²
. fund
-S

A LI
proj

BE
,64%
i=0

RD
AD
O

E
CA TU

EC
IXA BU
VE EM LA
CO ÇÃO
BR

RT BIOVS.1.
A= ALET6
ED NC
RE DE DE
54.6

a
alet
OU 9 m² A proj.

o biov
RO TO fundo DE

SO
, Ø6 SAGU TA

. fund
biova
leta
(ver ,64%
LH

proj
00 E i=0
E ES
pran mm
E

VE TAQU

ES
ch BIOV
A= ALETS.2.1 R PR
a 05 42.2 A EA
)
3m²
AN MEN

HO

AC
CH TO
O

i=0,3
9% A 12
DE
T.

E
TR
LA

proj.
AN

D
fundo

DE biova
leta SB
T- OR
DO

PA
VE
(PRA RTED
G

NC OU

AM
HA RO

Ø1,20
05
).

Ø1,20
A= SA
O

BIOV S.2.2
A= ALET INÍC

R
02
124
.58 A

1.0 F m² ES IO DO
TA

SE
N- QU
BO

IXO
EA
60 98
E-78 4381 MEN

RO
,20 61 0.29 SAC DE TO

LA
27
A=
173 - E95 T.
.700 0 CA N-

DO
i=0,
.85 .2
98

39% m²
N- IXA E-78 4492

LA
E-78 9843
LO

+13.
cota 20
DE

VA
proj. +14 de
76 9.19
61 788.
topo .20 fundo

R5.00
fundo
AR 44

DO
subst

15 70
biova
leta
rato
EIA .660 0
.110 0

- Ø0
,8
NH

a 1,
6 cm
BIOV S.2.
3
A

A=
180 ALET
.67 A

i=0,
39%

proj.
fundo

SAN - E92+10
biova
leta

(ver IXA VE
E 78 4482

CA
N 98 04) RO

pran
SA SE
IXO
A=3.500,00m²

75 9.84
A= C -

ch EDOU
37
17 E3 RO

a
LA

RT
16

.06
+6. 7m .9 1 DO
Ø0 LA
co 45 ² ,8 VADO
+ ta de A 1,
topo7.45 fund 6c - BIOV S.2.
m. A= ALET 4
257.

su o 34 A

bs
tra
to

i=0,

TR
39% proj.
fundo
biova
leta

N-
98
E-78 4378
61 7.63 APROX.
66
.580 0 160.00

EC
LA BIOV S.2.
INÍC
R50.00 VA SE ES IO DO
A= ALET 5

DO IXO 281
.65 A
m² TA
- Ø5 ROLA QU
EA
A 6c DO MEN
m. TO

H
i=0,3
9%
proj. DE
N-
fundo
biova N- TA
98 LH
E-78 9844
leta
E-78 4484 E ES
69 330. 76 9.73 VE QU
TA

O0
49 94 25
0.00 INÍC .520 0 .980 0 R PR EA
R5 AN MEN
ES IO DO CH TO
TA A 12
QU
EA
15.05 R5
MEN BIOV S.2.
.00 TO A= ALET 6
253.
62 A

CO
GA NTIN
DR LERI UAÇÃ
R5.00

CA ENAG A DE O TU
BU EN
Ø1 STAN EM TR LA i=0,

1
39%
20 AD ÇÃ proj.

0m HEIR "RED
fundo
A DO O APROX. biova

m A"- E EM leta
EF 30.0
LU PVC CAI 0
Ø1 ENTE - (ver XA DE

EN TUBU
pra
50 nch AREIA
TR mm , a 03)

N- AD LAÇÃ .
98 A "F O TUB
"FIR TUBULA
E-78 4375 IRST EM ENT ULA
Ø75 RAD ÇÃO ST APROX. 30.00
PV FLU ÇÃO
61 9.28 2xØ3 FLUS C -
mm A EFL EM
UEN PVC
SH" ENT
75 Ø 300 RAD
.430 0 00 H", TE
mm A DE AREIA
mm DET. CAIXA HA 13
. N 984
E 786 423 VER PRANC
854 9.3 DE BIOV S.2.
.10 6 TA A= ALET 7
NA
LH A E CISTER
268.
65m²A
E ES DET. BOMB 12 LTAICO
SEI TA HAS 10-11- PAINEL FOTOVO 265wp
XO VE QU VER PRANC O
R PR POLICRISTALIN PLACAS)
ROL proj.
ADO EA i=0,3 fundo
DE AN MEN
9% biova
T- Ø5
LAV leta
VASOR (20
CAIXA EXTRA 08
ADO
CA a6 N 984 CH TO
A 02
N 9844620.83
cm
IX E 786 424
HA
(PRA A DE 865 3.39
N 9844601.54 VER PRANC
E 787398.24
.37
NC AREI A= SAC E 787373.61 N 9844619.97
HA
04
A 647 E80
,29
N 984460
0.53 E 787397.01 N 9844649.60 APR
OX.
CO ).
E 787436.81 130.00

NC TUBU
+1

RE N 984
cota 2.2
+1 top 3 BIOV S.2. E 787372.48 80.41
DR TO LAÇÃ E 786 425 cota 1.73 o sub
stra
A= ALET 8
263.
19.43
EN - GA O 816 5.2
.44 0
de
fund to 03 A

CA AGEM LE EM TUBULAÇÃO RECALQUE DA BOMBA - PVC Ø50 mm


i=0,
o 39%
ST RI
AN "RED A
Ø1 HE E
GI: 200mIRA",
+7. m i=0,5
%

2.82
85
m
EFLUENTE
TRANSBORDO Ø100 mm DE
PVC TE TA
LH
SAÍDA EFLUENmm
SEI
XO E ES
ROL
Ø 0,8ADO TUBULAÇÃO PVC Ø100
0a
LAV VE TAQU
1,6 ADO R PR EA
cm
CH AN MEN

Ø1200
PR EGA
CH TO

mm
A 12
N 984
OV DA ÁGUA PLUVIA
L
TRANSBORDO PVC Ø 100mm
SAC 03 TUBULAÇÃO
EXTRAVASORA
E 786 422
878 6
4.6
CH EN TU A=####
###m²
ÁGUA PLUVIA
L
PR EGA IEN BU
.81
+14.40 100mm
PVC 2 x Ø

Ø600
mm
topo substrato

Ø1200
TE LA

mm
OV DA

11.750
+13.40

Ø1200
DA ÇÃ

Ø600

mm
fundo substrato

mm
EN TU
CAI
(ver XA VER

ES O C SAC 02
pran TED
cha OUR
03) O
IEN BU SAC 01 ###m²
RA TE LA TA ON
CA TR ###m²
A=#### INÍC
ES IO
MP DA ÇÃ A=#### +14.60
topo substrato
TA DO
QU

ES O C 11 IBU +14.80
topo substrato +13.60
NÍVEL CAMAD
A POROSA
N 9844640.12
EA
MEN
A TA ON 3 IÇÃ +13.80
fundo substrato
E 787446.07
TO
DE CA TR O
fundo substrato

Ø600
N-

mm
98
AC BIOV S.3.
10 IBU NÍVEL CAMAD
A POROS A
L E-78 4475

Ø600
ÁGUA PLUVIA

mm
A= ALET 1

ES
354.
80m²A
7 + IÇ TRANSBORDO PVC Ø100mm
76 3.92
20
.230 0

SO proj.
10 ÃO
TRAVES

fund
o biova

"FIR TUBU
leta

Ø600
mm
ST LAÇÃ i=0,
FL 39% proj.
US O EN fund
o biova
EFLUENTE
H" TRANSBORDO Ø 100mm
Ø 30 TRAD
leta

0m A PVC
TU i= m
BU 1%
EF LAÇÃ
LU
EN O EN N 9844586.75
A POROSA
SIA

TE NÍVEL CAMAD E 787424.54


14,750

Ø 10 TRAD
0m A N 9844585.36 CH
N 9844535.22
BIOV S.3.
CA i= m EG
E 787423.75
A= ALET 2
212
AD
(ver IXA DE SE E 787358.78
.35 A
1% m²
A DE
IXO
pran AR RO
N 9844531.88 N 9844562.34 EF
LU
ch EI N 98 LA
E 787405.16
EN
a 04 A DO
E 78 44 E 787360.46 TE
12,390
i=5%

e 05 67 084. LA
Ø5 VA
81 36 N 9844561.30
i=0,
) a 6 DO
39% proj.
.983 8 fundo
TU
E 787404.04
bioval
cm eta

"FIR BULA APROX. 145.00


i= ST ÇÃO
1% FLUS EN
S
H" TRAD
Ø 25 A N 984
E 787 444 A= AN
1.2 - E1

COR
0m 283 9.5
.71 1 BIOV S.3.

TE B
m A= ALET 3
227. DE
TA
PA
00 23
37 A

LH
PO INEL E ES
LICR FO
ISTA TOVO
,00 VE QU
TA

N 98
i=0,39
%
LINO LTAI m² R PR EA
AN MEN
SIA

12,390

CH TO
E 78 44 26 CO A 12

R5.00
proj.
67 058.
fundo
biovaleta
5w
74 11 p (2
.518 3
0 PL
ES

+10
.68 AC
AS .00
S.3. proj. fundo
BIOV i=0,39%
A= ALET4
134.
biovaleta
) 40
AV

A S.3.
89m² i=0,39%
proj. fundo biovaleta
BIOV
A=1 ALET6 X.
12,390
08.6 A
1m²
RO
BIOV S.3.
A= ALET 5 AP
176.
94m²A i=0,39%
TR

RAM N-
E-78 9843
PA D N-
98 67 989. A= SAC
N 984

E E-78 43 E 787 443


19 89 1.46 - E7 286 2.81

1.00
ACE 67 985.
14 78
.410 0
8,00 0
.87
A= SAC INÍC
DE
TA
SSO BB
TU
EF BULA
.540 0
+
+
co 9.38
ta
top

CAI
(ver XA
pra VERTED
nch
a 04) OUR
+1
120 E11

cota 0.2
5
2,0 3
0 m² ES IO DO
TA
QU
LH
E ES
VE QU
TA
LU O +9 topo
EA
TJ
2xØ1 Ø1 EN ÇÃO co 8.88 o su
ta bs
cota .75 sub
stra MEN R PR EA
AN MEN
de
00 TE EN SE de tra fund to
TO
mm Ø0 IXO RO
fun to N 98 o
CH TO
20 TR do SEI
A 02
AD
Ø1,20

XO
CT 0 x A ,8 E 78 4407 ROL
Ø1,20

a 1, LA TUB
30°

ADO
30°
CF -14.370º 6 cm DO 68 4.25
10
LAV
ADO
ENT ULA
Ø75 RAD ÇÃO N-
98
-12. SE LA .995 3 -Ø
N 984 mm A EFL EM
E-78 4460
74 IXO VA 0,8 E 787 446
1.0
UEN PVC
TE -
DO a 1,6 344 6 75 9.89
RO cm .62
33 0
.720
LA CA
DISSIPADOR
DE ENERGIA

DO (ver IXA VE
LA
VA pran RT
DO ch EDOU
Ø5 a 05 RO

i=5%
GABIÃO
a6 )
cm
COR
TE A
CAI
N- N- (ver XA

E-78 9843 98 pran DE ARE


E-78 4398
cha IA
N 98
67 972.
03
e 04)
12 69 67 9.60 +10 E 78 4404
.610 0 32 SEI ENT TUBULA
.640 0 .68 68 2.72
02
XO
ROL RAD ÇÃO
.669 0
ADO A "FIR
EM
LAV ST PVC
ADO FLU
-Ø Ø35 SH" -
5a 0m
6 cm m
N 984
E 787 444
12,850

SE 347 5
4.3
CA IXO .79
(ver IXA DE TU RO
BU LA
pran AR LA DO
ÇÃ
ch EIA "FIR O EN LA
a 03 VA
) ST TR DO
2xØ3 FLUS ADA Ø 0,
Ø1200
mm

11.550

00 H" 8a
mm 1,6
Ø1200
mm

cm
SA
A= C E-
19
52 63
.89
+ m²
co 11.2
ta 0
+ topo
co 10.7
ta 0 subs
de tra
fund to
o
.61 0
2.27
2
E 786 385
616
N 984

A 6cmADO
.
- Ø5 ROL
.448 62
6.7

ADO XO
SEI
E 786 383
605
Ø 350 SH" A

N 984
ST ENTRAD

mm -

LAV
FLU
ÇÃO
ULA
"FIR

N- N-
TUB

98 98
E-78 4393 E-78 4396
67 7.88 67 1.47
35 63
.230 0 .170 0
.80 23
7.9
1
nch AREIA

E 786 383
a 04)

624
N 984
(ver XA DE
pra
. CAI
DET

EFL RAD ÇÃO


Ø 75mUEN A DO
ENT ULA

TE
TUB

A= SAC
.48 56

106 - E54
602 4.3
0

8,0
E 786 381

+1 0 m²
cota 0.0 N-
N 984

+9 top 3 98
cota .53 o sub
de stra
to
E-78 4393
67 8.97
fund
o
62
.680 0

N- CA
98 IXA
E-78 4393
67 4.59 (ver VERT
-

57 pran EDOU
ADO

.480 0
cm. LAV

ch RO
1,6 ADO

a 04
Ø0, XO ROL

)
8A
SEI

.830 80
603 6.6
E 786 380
N 984

.48 23
0.0
0
E 786 381
604
N 984
a 04) O
nch OUR
(ver VERTED
pra

.87 40
XA

623 5.5
CAI

0
E 786 380
N 984
.73 82
8.8
6
E 786 389
616
N 984

Vous aimerez peut-être aussi