Vous êtes sur la page 1sur 1

TUTUP GROUND TANK

BESI PLAT
4,20 m

PIPA PEMBUANGAN AIR KOTOR


MAIN HOLE GROUND TANK m
20
4,
1,40 m

GROUND TANK
-1,6 METER

MAIN HOLE

MAIN HOLE PIPA PEMBUANGAN AIR KOTOR


MAIN HOLE GROUND TANK
1,30 m

1,30 m
1,4 1,3
0m 0m
GROUND TANK

1,60 m
- 1,37 METER
m
00
2,

2,00 m

1,37m
PIPA AIR KOTOR DARI
MAIN HOLE GROUND TANK

4,20 m
WALL CONCREATE
REBAR 12 MM - 150 MM
MUTU BETON K-250

1,40 m
1,40 m
GROUND TANK
-1,37 METER GROUND TANK
-1,6 METER
1,60 m
1,37 m

1,30 m
2,00 m

GROUND TANK STRUCTURE

Project:

CONTRACTOR: TEAM APPROVAL REVISION Design building Architecture &Construction Owner : PT.KARTANEGARA ENERGI PERKASA
DESIGN CONSTRUCTION:
Tittle :
DEPARTEMENT SIGN DATE DATE BY WHAT REVISED

PLTG SENIPAH
KSO
MIXED BED, UF & RO CHEMICAL
PT.KARTANEGARA ENERGI PT. HYDROMASTER HARMONI PT. KEP
Civil Engineer

PERKASA NUSANTARA
EST: LOKASI :
TELUK PEMEDAS,EAST BORNEO
SKALA:

DATA FILE CIVIL ENGINEER: RULLY SAPUTRA

TANGGAL: 06 SEP 2018


PT.KEP-PLTG/IV/10/2018 ORIGINAL DRAWING SIZE : A3

Vous aimerez peut-être aussi