Drawing Notes:

8/02/2019 11:54:00 AM
Lux Levels Lighting Control Legend
1. Not used
1 1- Lighting Level 2. Safe movement and emergency lighting shall be provided as part of the cold shell
2 3 ### lx Specialist Lighting Scope provision for retail tenancies.
1 0 lx (see Note 8) 3. The emergency and exit lighting for the 100QS Tower, 90QS and 380CS is proposed
2- Daylight Dimming to be upgraded to a standalone single point system. Only 388CS ( ANZ tenancy) shall
Yes / No. remain on the Central Battery System. The Contractor shall allow for new single point
20 lx emergency and exit lighting through the precinct (excluding 388CS) and the removal
3- Automatic Lighting Control of redundant cabling & equipment associated with the Central Battery System. The
1 - Absence c/w manual override. Contractor shall allow for the installation of lighting control modules to enable
2 - Presence integration of existing lighting circuits with the new lighting control system. Refer to
40 lx 3 - Manual DRG EL-10-0018 for typical control schematic within each distribution board.
4 - Time schedule and presence 4. Refer to the Architectural drawings for specific room usage.
detection for out of hours 5. This drawing only shows general lighting requirements. Feature lighting design is by
80 lx operation others.
5 - Presence with stair dim 6. All luminaires shall be LED type and DALI addressable - refer to the reference
2 mode luminiare schedule for additional details.
160 lx 6 - Scene setting 7. Not used.
8. Areas with no designated lighting performance requirements (0 lx) are proposed to
have the existing lighting retained. The Contractor shall allow for the installation of
lighting control modules to enable integration of existing lighting circuits with the new
200 lx lighting control system. Refer to DRG EL-10-0018 for typical control schematic within
each distribution board.

240 lx

320 lx 1 2 3 4 5 6 7 8
3
500 lx

A L1 L1 D1 D1 D1 D1 D1 D1 D1 D1 L1 L1 L1 L1 A
80 lx
N 2
BOH CORRIDOR
D1 D1

L1 L1 B1E 160 lx
B1 L1 L1 L1 L1
N 3
5 D1
ELEC.

D1
D1
L1 L1 L1 L1 L1 L1
B1E 160 lx B1 D1
N 3
COMMS D1
B D1 B
L1 L1 L1 L1 L1
D1
6 D1
D1 160 lx D1
N 2
160 lx
L1 AMENITIES TYPE A 160 lx L1 L1 L1
N 4
D1 D1 N 2
HIGHRISE LIFT LOBBY
AMENITIES TYPE A

D1 D1 0 lx
80 lx D1 D1 N 4
N 5 200 lx LIFT 13 LOBBY
80 lx
L1 FIRE STAIR 1.L20 N 2
N 5
L1 L1 L1
DDA WC
HYDRANT FIRE STAIR 2.L20

7 C C

L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1

L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1

L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
D D

L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1

L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1

320 lx
Y 4
OFFICE TENANCY LEVEL 20
E L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 E

10
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1

L1 L1 L1 L1 L1 L1 L1 L1 L1 L1

F F
11

12
G G

13

14

1 2 3 4 5 6 7 8

15

Scale at A0
Client Project Title Drawing Title 1 : 100
P03 18/12/18 MEG JS DC GPT Queen & Collins Lighting Layout Role
Electrical Services
Work In Progress Level 20 (Typical 20-32) Suitability
T01 08/02/19 MEG WN RKH P02 09/11/18 MEG JS DC D2 - Published for Tender
Arup Job No Rev
Tender 50% Design Development NORTH Sky Park, One Melbourne Quarter

P04 01/02/19 MEG WN RKH P01 04/07/18 HG JS CM 0


699 Collins Street 258083 T01
1 2 3 4 5 Docklands VIC 3008
Tel +61 (03) 9668 5500 Fax +61 (03) 9663 1546 Name
Work In Progress Preliminary Issue m www.arup.com.au

Rev Date By Chkd Appd Rev Date By Chkd Appd Rev Date By Chkd Appd 258083-AR-EL-22-1200