Vous êtes sur la page 1sur 3

Reservoir engineering

Assignment 1

Zainulabdeen salah hasan


t (hr) r(ft) x Ei(x) p(r,t)
2.4 0.25 -1.257E-06 14.16 2338
10 -0.0020113 6.786 2422
20 -0.008045 5.4 2438
30 -0.0181013 3.4 2461
50 -0.0502813 2.5 2471
100 -0.201125 1.22 2486
300 -1.810125 0.064 2499
24 0.25 -1.257E-07 16.47 2312
10 -0.0002011 9.088 2396
20 -0.0008046 7.702 2412
30 -0.0018103 6.891 2421
50 -0.0050286 5.87 2433
100 -0.0201143 3.3 2462
300 -0.1810285 1.4 2484
800 -1.2873139 1.38 2484
900 -1.6292567 0.086 2499
240 0.25 -1.257E-08 18.77 2285
10 -2.011E-05 11.39 2370
20 -8.046E-05 10 2386
50 -0.0005029 8.172 2406
80 -0.0012873 7.232 2417
100 -0.0020114 6.786 2422
300 -0.0181029 3.4 2461
600 -0.0724114 2.16 2475
900 -0.1629257 3.5 2460
1000 -0.2011428 1.222 2486
1300 -0.3399313 0.905 2490
1500 -0.4525713 0.51 2494
2400 0.25 -1.257E-09 21.07 2259
10 -2.011E-06 13.69 2343
20 -8.046E-06 12.31 2359
50 -5.029E-05 10.47 2380
80 -0.0001287 9.535 2391
100 -0.0002011 9.088 2396
300 -0.0018103 6.891 2421
600 -0.0072411 2.1 2476
1000 -0.0201143 3.3 2462
1300 -0.0339931 2.9 2467
1500 -0.0452571 2.69 2469
2000 -0.0804571 2 2477
2300 -0.1064045 1.8 2479
2700 -0.1466331 1.5 2483
2900 -0.1691611 1.45 2483
3000 -0.1810285 1.4 2484
3200 -0.2059702 1.222 2486
3500 -0.2463999 1.09 2488
4000 -0.3218285 0.535 2494