Vous êtes sur la page 1sur 1

GTC/643G/2014

Qatar Power Transmission System Expansion PHASE-12 Substations - Package S-10, S-13 & S-14

Ref No: PH12-PB-3G-DTA-16-5277

Total Pages: 1 Date: 02 Jan 2017


Forwarded To: Type of Status
A - Approved (Issue as IFC*)
To: B - Approved Except as Noted
Mr. G. Karthikeyan (Issue as IFC* with incorporated comments)
Project Manager
C - Approved Except as Noted & Resubmit
National Contracting Co. Ltd
Fax: (+974) 4001 6479 D - Not Approved
E - As Built
CC: Mr.Ahmad Ali Ahmed Alkuwari F - For Information
Project Manager G - Superseded
KM-TA
H - See Remark
I - Collect Stamped Document from KM Office
J - Rejected
*IFC = Issued For Construction
Sl.
Originator DTS No. & Date Document / Drawing No. Rev Subject Status
No.

PH12-NCC-3G-DTS-16- Common For S-10, S-13 & S-14 Substations, Technical Data Sheet
1 NCC PH12-3G-10-40-T001 B1 I
5277 dated 14-12-2016 For Substation Control System

Remarks:

Originator's Signature Designation Date

Gary Dolton, Project Manager

Receiver's Signature
Reviewer Log : WSP|PB

ZO,RZ Designation

Date

Note: The above comments and/or approval do not relieve the Contractor from the obligation in the Contract to ensure conformance to the Specifications. Any Specification deviations found
subsequent to approval are to be corrected by the Contractor to the satisfaction of the Kahramaa/Engineer.

Vous aimerez peut-être aussi