Académique Documents
Professionnel Documents
Culture Documents
Qatar Power Transmission System Expansion PHASE-12 Substations - Package S-10, S-13 & S-14
PH12-NCC-3G-DTS-16- Common For S-10, S-13 & S-14 Substations, Technical Data Sheet
1 NCC PH12-3G-10-40-T001 B1 I
5277 dated 14-12-2016 For Substation Control System
Remarks:
Receiver's Signature
Reviewer Log : WSP|PB
ZO,RZ Designation
Date
Note: The above comments and/or approval do not relieve the Contractor from the obligation in the Contract to ensure conformance to the Specifications. Any Specification deviations found
subsequent to approval are to be corrected by the Contractor to the satisfaction of the Kahramaa/Engineer.