Takuya Ono
QA/QC Deputy General
Manager/Management
Representative
Kristel Mae P. Balba Alvin F. De Mesa
Production 1 Production 1
Maintenance Engineer Maintenance Supervisor
Masaaki Shinkawa
Production Director
CONTENTS PAGE
INTRODUCTION / BACKGROUND 2
SCOPE 2
OBJECTIVE 2
VALIDATION PLAN / TEST PROCEDURE 2
VALIDATION TIMELINE 2
DESIGN QUALIFICATION 2
INSTALLATION CHECK 3
CRITERIA FOR REVALIDATION / VALIDATION 3
APPENDICES 4
M-00H005-002
Lot 2-B-1, Phase 1B,
First Philippine Industrial Park,
JMS Healthcare PHL, Inc. Special Economic Zone,
Tanauan City, Batangas, Philippines
INTRODUCTION/BACKGROUND
This validation protocol consists of Installation Qualification (IQ) of Sealing Machine No.4.
The function of this Sealing Machine is to apply the final seal on Ribbon Pack (RP) Bag of Infusion Set.
Sealing Machine
This applies to Installation Qualification (IQ) of Sealing Machine No.4 of Infusion Set
SCOPE
Line 4.
To check the physical and ensure that the machine is functional after fabrication.
OBJECTIVE To verify and ensure that the parts from this new machine is good and suitable for
mass production.
V VALIDATION
A TIMELINE
L
I
D
A
T
I
O
N
P
L
A
N
/
T
E DESIGN
S QUALIFICATION
T
P
R
O
C
M-00H005-002
Lot 2-B-1, Phase 1B,
First Philippine Industrial Park,
JMS Healthcare PHL, Inc. Special Economic Zone,
Tanauan City, Batangas, Philippines
M-00H005-002