Académique Documents
Professionnel Documents
Culture Documents
NAMA KONTRAKTOR : SRI ESBINA (M) SDN BHD HARGA KONTRAK : RM 40,600,000.00 TARIKH MULA
BUTIRAN PROJEK : 12000 003 GST : RM 2,436,000.00 TARIKH SIAP
NO. KONTRAK : KDN/PB/004/2014 HARGA KESELURUAN : RM 42,436,000.00 EOT NO.1
WANG JAMINAN PELAKSANAAN : 2,151,800.00 PHK : - LAD
*5% DR HRGA ASAL KONTRAK HARGA BARU : -
NO.RUJUKAN DOKUMEN
NO BAYARAN WJP PELEPASAN BAYARAN BAKI
INTERIM WJP KONTRAKTOR KONTRAK
NOMBOR TARIKH
(RM) (RM) (RM) (RM) (RM)
42,436,000.00
11 - - - 39,977,351.20 - -
12 - - - 39,977,351.20 - -
15 - - - 39,087,173.80 - -
0 CADANAGAN PEMBINAAN PERUMAHAN BALAI POLIS INANAM, SABAH
NAMA KONTRAKTOR : SRI ESBINA (M) SDN BHD HARGA KONTRAK : RM 40,600,000.00 TARIKH MULA
BUTIRAN PROJEK : 12000 003 GST : RM 2,436,000.00 TARIKH SIAP
NO. KONTRAK : KDN/PB/004/2014 HARGA KESELURUAN : RM 42,436,000.00 EOT NO.1
WANG JAMINAN PELAKSANAAN : 2,151,800.00 PHK : - LAD
*5% DR HRGA ASAL KONTRAK HARGA BARU : -
NO.RUJUKAN DOKUMEN
NO BAYARAN WJP PELEPASAN BAYARAN BAKI
INTERIM WJP KONTRAKTOR KONTRAK
NOMBOR TARIKH
(RM) (RM) (RM) (RM) (RM)
16 - - - 39,087,173.80 - -
18
19
20
: 23.11.2015
: 22.11.2017
: -
:
TANDATANGAN TARIKH
PERAKUAN II
PERUMAHAN BALAI POLIS INANAM, SABAH
: 23.11.2015
: 22.11.2017
: -
:
TANDATANGAN TARIKH
PERAKUAN II
KONSULTANT KUMPULAN (MT) SDN BHD
PERUMAHAN BALAI POLIS INANAM, SABAH
2016
2017 -
2018
1 257,518.46 257,518.46
-
EP ENGINEERING SERVICES
PERUMAHAN BALAI POLIS INANAM, SABAH
YURAN PERUNDING
CATATAN
LAIN-LAIN BAYARAN
JUMLAH 26,760.75
AN
CATATAN