Sustainability
10
(yrs)
A. Labor
Sub-total A 1,521.6
Sub-total B 152.16
Unit of Measurement M
Sustainability
Total Length 6780 10
(years)
Labor
Sub-total A 6,000.00
Sub-total B 21,138.08
Sub-total C 24,475.00
Unit of Measurement m
Sustainability
Total Length 6780 50
(years)
Labor
Sub-total A 9,782.40
Sub-total B 25,027.36
C. a) Ready Mixed
Concrete @ M3 10 625.00 6,250.00
3000psi
Sub-total C 6,250.00
Sustainability
Total Length 71.4 m 10
(years)
Unit of Measurement m3
Labor
Sub-total A 5,000.00
Sub-total B 13,155.84
a) a). RCCP
150mm OD pc 68 150 10,200.00
C. x1m
b) b) RCCP
300mm OD pc 5 625 3,125.00
x1m
Sub-total C 13,325.00
D. Total Direct Cost 31,480.84