Vous êtes sur la page 1sur 42

Air System Sizing Summary for LTG WORKSPACE ROOM

Project Name: HO PUSTEK PROJECT 02/16/2019


Prepared by: ASDF 05:09PM

Air System Information


Air System Name LTG WORKSPACE ROOM Number of zones 1
Equipment Class UNDEF Floor Area 87.5 m²
Air System Type SZCAV Location Depok, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 15.4 kW Load occurs at Jan 1600
Sensible coil load 11.0 kW OA DB / WB 37.8 / 32.8 °C
Coil L/s at Jan 1600 854 L/s Entering DB / WB 25.6 / 19.5 °C
Max block L/s 854 L/s Leaving DB / WB 14.9 / 14.3 °C
Sum of peak zone L/s 854 L/s Coil ADP 13.7 °C
Sensible heat ratio 0.714 Bypass Factor 0.100
m²/kW 5.7 Resulting RH 53 %
W/m² 175.9 Design supply temp. 14.4 °C
Water flow @ 5.6 °K rise 0.66 L/s Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0.0 °K

Central Heating Coil Sizing Data


Max coil load 7.4 kW Load occurs at Des Htg
Coil L/s at Des Htg 854 L/s W/m² 85.0
Max coil L/s 854 L/s Ent. DB / Lvg DB 13.8 / 21.1 °C
Water flow @ 11.1 °K drop 0.16 L/s

Supply Fan Sizing Data


Actual max L/s 854 L/s Fan motor BHP 0.00 BHP
Standard L/s 846 L/s Fan motor kW 0.00 kW
Actual max L/(s-m²) 9.76 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 68 L/s L/s/person 8.50 L/s/person
L/(s-m²) 0.78 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 7


Ventilation Sizing Summary for LTG WORKSPACE ROOM
Project Name: HO PUSTEK PROJECT 02/16/2019
Prepared by: ASDF 05:09PM

1. Summary
Ventilation Sizing Method Sum of Space OA Airflows
Design Ventilation Airflow Rate 68 L/s

2. Space Ventilation Analysis Table


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s-m²)) (L/s) (% of supply) (L/s)
Zone 1
LT G WORKSPACE 1 87.5 8.0 854.3 0.00 0.00 68.0 0.0 68.0
Totals (incl. Space Multipliers) 854.3 68.0

Hourly Analysis Program v4.90 Page 3 of 7


Air System Design Load Summary for LTG WORKSPACE ROOM
Project Name: HO PUSTEK PROJECT 02/16/2019
Prepared by: ASDF 05:09PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jan 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 37.8 °C / 32.8 °C HEATING OA DB / WB 25.0 °C / 21.0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 10 m² 1565 - 10 m² - -
Wall Transmission 112 m² 4457 - 112 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 10 m² 409 - 10 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 15 m² 1624 - 15 m² 0 -
Floor Transmission 88 m² 0 - 88 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 648 W 533 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 600 W 552 - 0 0 -
People 8 480 440 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 9621 440 - 0 0
Zone Conditioning - 9920 440 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 854 L/s 0 - 854 L/s 0 -
Ventilation Load 68 L/s 1072 3961 68 L/s -316 -927
Supply Fan Load 854 L/s 0 - 854 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 10993 4401 - -316 -927
Central Cooling Coil - 10993 4401 - -7753 -927
Central Heating Coil - 0 - - 7437 -
>> Total Conditioning - 10993 4401 - -316 -927
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 4 of 7


Air System Sizing Summary for LT1 - Lobby
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.25PM

Air System Information


Air System Name .................................... LT1 - Lobby Number of zones .......................................................... 1
Equipment Class ............................................ UNDEF Floor Area .............................................................. 122,8 m²
Air System Type ............................................. SZCAV Location ............................................. Depok, Indonesia

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing ................... Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing ............... Individual peak space loads

Central Cooling Coil Sizing Data

Total coil load ........................................................ 6,2 kW Load occurs at ................................................. Feb 1700
Sensible coil load ................................................... 5,1 kW OA DB / WB ................................................... 36,7 / 32,6 °C
Coil L/s at Feb 1700 ............................................. 411 L/s Entering DB / WB ........................................... 25,2 / 18,6 °C
Max block L/s ....................................................... 411 L/s Leaving DB / WB ........................................... 14,8 / 14,2 °C
Sum of peak zone L/s ........................................... 411 L/s Coil ADP .................................................................. 13,6 °C
Sensible heat ratio .............................................. 0,821 Bypass Factor ........................................................ 0,100
m²/kW ................................................................... 19,7 Resulting RH .............................................................. 51 %
W/m² .................................................................... 50,7 Design supply temp. ................................................ 14,4 °C
Water flow @ 5,6 °K rise ....................................... 0,27 L/s Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ................................ 0,0 °K

Central Heating Coil Sizing Data

Max coil load ......................................................... 3,0 kW Load occurs at ................................................... Des Htg
Coil L/s at Des Htg ................................................ 411 L/s W/m² ........................................................................ 24,6
Max coil L/s .......................................................... 411 L/s Ent. DB / Lvg DB ............................................ 15,0 / 21,1 °C
Water flow @ 11,1 °K drop ................................... 0,07 L/s

Supply Fan Sizing Data

Actual max L/s ...................................................... 411 L/s Fan motor BHP ........................................................ 0,00 BHP
Standard L/s ......................................................... 407 L/s Fan motor kW .......................................................... 0,00 kW
Actual max L/(s-m²) .............................................. 3,35 L/(s-m²) Fan static ...................................................................... 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s ................................................... 17 L/s L/s/person ................................................................ 8,50 L/s/person
L/(s-m²) ................................................................. 0,14 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 3


Zone Sizing Summary for LT1 - Lobby
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.25PM

Air System Information


Air System Name .................................... LT1 - Lobby Number of zones .......................................................... 1
Equipment Class ............................................ UNDEF Floor Area .............................................................. 122,8 m²
Air System Type ............................................. SZCAV Location ............................................. Depok, Indonesia

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing ................... Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing ............... Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 4,6 411 411 Mar 1700 0,0 122,8 3,35

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
LT1 - Lobby 1 4,6 Mar 1700 411 0,0 122,8 3,35

Hourly Analysis Program v4.90 Page 2 of 3


Air System Design Load Summary for LT1 - Lobby
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.25PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Feb 1700 HEATING DATA AT DES HTG
COOLING OA DB / WB 36,7 °C / 32,6 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 4 m² 734 - 4 m² - -
Wall Transmission 64 m² 2405 - 64 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 4 m² 178 - 4 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 2 m² 161 - 2 m² 0 -
Floor Transmission 123 m² 0 - 123 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 792 W 660 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 360 W 333 - 0 0 -
People 2 119 110 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 4590 110 - 0 0
Zone Conditioning - 4866 110 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 411 L/s 0 - 411 L/s 0 -
Ventilation Load 17 L/s 244 1000 17 L/s -79 -192
Supply Fan Load 411 L/s 0 - 411 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 5110 1110 - -79 -192
Central Cooling Coil - 5110 1111 - -3102 -192
Central Heating Coil - 0 - - 3023 -
>> Total Conditioning - 5110 1111 - -79 -192
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 3 of 3


Air System Sizing Summary for LT1 - Finance Room
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.18PM

Air System Information


Air System Name ....................... LT1 - Finance Room Number of zones .......................................................... 1
Equipment Class ............................................ UNDEF Floor Area ................................................................ 12,0 m²
Air System Type ............................................. SZCAV Location ............................................. Depok, Indonesia

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing ................... Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing ............... Individual peak space loads

Central Cooling Coil Sizing Data

Total coil load ........................................................ 4,0 kW Load occurs at ................................................. Feb 1600
Sensible coil load ................................................... 2,4 kW OA DB / WB ................................................... 37,6 / 32,7 °C
Coil L/s at Feb 1600 ............................................. 198 L/s Entering DB / WB ........................................... 25,6 / 20,6 °C
Max block L/s ....................................................... 198 L/s Leaving DB / WB ........................................... 15,4 / 15,0 °C
Sum of peak zone L/s ........................................... 198 L/s Coil ADP .................................................................. 14,3 °C
Sensible heat ratio .............................................. 0,602 Bypass Factor ........................................................ 0,100
m²/kW .................................................................... 3,0 Resulting RH .............................................................. 58 %
W/m² .................................................................. 335,9 Design supply temp. ................................................ 14,4 °C
Water flow @ 5,6 °K rise ....................................... 0,17 L/s Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ................................ 0,0 °K

Central Heating Coil Sizing Data

Max coil load ......................................................... 1,5 kW Load occurs at ................................................... Des Htg
Coil L/s at Des Htg ................................................ 198 L/s W/m² ...................................................................... 121,9
Max coil L/s .......................................................... 198 L/s Ent. DB / Lvg DB ............................................ 14,9 / 21,1 °C
Water flow @ 11,1 °K drop ................................... 0,03 L/s

Supply Fan Sizing Data

Actual max L/s ...................................................... 198 L/s Fan motor BHP ........................................................ 0,00 BHP
Standard L/s ......................................................... 196 L/s Fan motor kW .......................................................... 0,00 kW
Actual max L/(s-m²) ............................................ 16,53 L/(s-m²) Fan static ...................................................................... 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s ................................................... 26 L/s L/s/person ................................................................ 8,50 L/s/person
L/(s-m²) ................................................................. 2,13 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 3


Zone Sizing Summary for LT1 - Finance Room
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.18PM

Air System Information


Air System Name ....................... LT1 - Finance Room Number of zones .......................................................... 1
Equipment Class ............................................ UNDEF Floor Area ................................................................ 12,0 m²
Air System Type ............................................. SZCAV Location ............................................. Depok, Indonesia

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing ................... Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing ............... Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 2,0 198 198 Feb 1700 0,0 12,0 16,53

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
LT1 - Finance Room 1 2,0 Feb 1700 198 0,0 12,0 16,53

Hourly Analysis Program v4.90 Page 2 of 3


Air System Design Load Summary for LT1 - Finance Room
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.18PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Feb 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 37,6 °C / 32,7 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 11 m² 384 - 11 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 12 m² 6 - 12 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 72 W 59 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1500 W 1381 - 0 0 -
People 3 175 165 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 2005 165 - 0 0
Zone Conditioning - 2008 165 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 198 L/s 0 - 198 L/s 0 -
Ventilation Load 26 L/s 418 1439 26 L/s -119 -288
Supply Fan Load 198 L/s 0 - 198 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 2427 1604 - -119 -288
Central Cooling Coil - 2427 1604 - -1581 -288
Central Heating Coil - 0 - - 1463 -
>> Total Conditioning - 2427 1604 - -119 -288
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 3 of 3


Air System Sizing Summary for BOSS ROOM
Project Name: PROJECT HO LT 1 02/16/2019
Prepared by: Maju Mundur Bersama 03:52PM

Air System Information


Air System Name BOSS ROOM Number of zones 1
Equipment Class UNDEF Floor Area 16.8 m²
Air System Type SZCAV Location DEPOK, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 4.7 kW Load occurs at Dec 1100
Sensible coil load 3.6 kW OA DB / WB 32.4 / 31.8 °C
Coil L/s at Dec 1100 327 L/s Entering DB / WB 24.1 / 18.6 °C
Max block L/s 327 L/s Leaving DB / WB 14.9 / 14.4 °C
Sum of peak zone L/s 327 L/s Coil ADP 13.9 °C
Sensible heat ratio 0.764 Bypass Factor 0.100
m²/kW 3.6 Resulting RH 56 %
W/m² 280.2 Design supply temp. 14.4 °C
Water flow @ 5.6 °K rise 0.20 L/s Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0.0 °K

Central Heating Coil Sizing Data


Max coil load 2.4 kW Load occurs at Des Htg
Coil L/s at Des Htg 327 L/s W/m² 143.1
Max coil L/s 327 L/s Ent. DB / Lvg DB 15.0 / 21.1 °C
Water flow @ 11.1 °K drop 0.05 L/s

Supply Fan Sizing Data


Actual max L/s 327 L/s Fan motor BHP 0.00 BHP
Standard L/s 324 L/s Fan motor kW 0.00 kW
Actual max L/(s-m²) 19.45 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 17 L/s L/s/person 8.50 L/s/person
L/(s-m²) 1.01 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 6


Zone Sizing Summary for BOSS ROOM
Project Name: PROJECT HO LT 1 02/16/2019
Prepared by: Maju Mundur Bersama 03:52PM

Air System Information


Air System Name BOSS ROOM Number of zones 1
Equipment Class UNDEF Floor Area 16.8 m²
Air System Type SZCAV Location DEPOK, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 3.3 327 327 Dec 1000 0.0 16.8 19.45

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
BOSS ROOM 1 3.3 Dec 1000 327 0.0 16.8 19.45

Hourly Analysis Program v4.90 Page 2 of 6


Air System Design Load Summary for BOSS ROOM
Project Name: PROJECT HO LT 1 02/16/2019
Prepared by: Maju Mundur Bersama 03:52PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Dec 1100 HEATING DATA AT DES HTG
COOLING OA DB / WB 32.4 °C / 31.8 °C HEATING OA DB / WB 25.0 °C / 21.0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 5 m² 1089 - 5 m² - -
Wall Transmission 13 m² 55 - 13 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 5 m² 135 - 5 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 17 m² 8 - 17 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 72 W 54 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 2100 W 1866 - 0 0 -
People 2 103 110 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 3310 110 - 0 0
Zone Conditioning - 3417 110 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 327 L/s 0 - 327 L/s 0 -
Ventilation Load 17 L/s 178 1003 17 L/s -79 -192
Supply Fan Load 327 L/s 0 - 327 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 3595 1113 - -79 -192
Central Cooling Coil - 3595 1112 - -2483 -192
Central Heating Coil - 0 - - 2404 -
>> Total Conditioning - 3595 1112 - -79 -192
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 3 of 6


System Psychrometrics for BOSS ROOM
Project Name: PROJECT HO LT 1 02/16/2019
Prepared by: Maju Mundur Bersama 03:52PM

December DESIGN COOLING DAY, 1100

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 32.4 0.03042 17 400 178 1003
Vent - Return Mixing Outlet 24.1 0.01127 327 843 - -
Central Cooling Coil Outlet 14.9 0.01010 327 843 3595 1112
Central Heating Coil Outlet 14.9 0.01010 327 843 0 -
Supply Fan Outlet 14.9 0.01010 327 843 0 -
Cold Supply Duct Outlet 14.9 0.01010 327 843 - -
Zone Air - 23.6 0.01022 327 867 3417 110
Return Plenum Outlet 23.6 0.01022 327 867 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.195 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2918.7 W/(L/s)
Site Altitude = 83.0 m

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 3310 Cooling 3417 23.6 327 867 0 0

Hourly Analysis Program v4.90 Page 4 of 6


System Psychrometrics for BOSS ROOM
Project Name: PROJECT HO LT 1 02/16/2019
Prepared by: Maju Mundur Bersama 03:52PM

WINTER DESIGN HEATING

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 25.0 0.01412 17 400 79 192
Vent - Return Mixing Outlet 21.3 0.01045 327 579 - -
Central Cooling Coil Outlet 15.0 0.01025 327 579 2483 192
Central Heating Coil Outlet 21.1 0.01025 327 579 2404 -
Supply Fan Outlet 21.1 0.01025 327 579 0 -
Cold Supply Duct Outlet 21.1 0.01025 327 579 - -
Zone Air - 21.1 0.01025 327 589 0 0
Return Plenum Outlet 21.1 0.01025 327 589 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.195 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2918.7 W/(L/s)
Site Altitude = 83.0 m

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 0 Deadband 0 21.1 327 589 0 0

Hourly Analysis Program v4.90 Page 5 of 6


Psychrometric Analysis for BOSS ROOM
Project Name: PROJECT HO LT 1 02/16/2019
Prepared by: Maju Mundur Bersama 03:52PM

Location: DEPOK, Indonesia


Altitude: 83.0 m.
Data for: December DESIGN COOLING DAY, 1100

1.
2. Outdoor
Mixed AirAir 0.035
3.
4. Central Cooling Coil Outlet
5. Room Air Outlet
Supply Fan
1
0.030

Specific Humidity ( kg/kg )


0.025

0.020

0.015
2
34 5
0.010

0.005

0.000
0 5 10 15 20 25 30 35
Temperature ( °C )

Hourly Analysis Program v4.90 Page 6 of 6


Air System Sizing Summary for LT1 - Mr. Hasnan Room
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.27PM

Air System Information


Air System Name ................. LT1 - Mr. Hasnan Room Number of zones .......................................................... 1
Equipment Class ............................................ UNDEF Floor Area ................................................................ 30,0 m²
Air System Type ............................................. SZCAV Location ............................................. Depok, Indonesia

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing ................... Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing ............... Individual peak space loads

Central Cooling Coil Sizing Data

Total coil load ........................................................ 4,5 kW Load occurs at ................................................. Dec 1500
Sensible coil load ................................................... 3,4 kW OA DB / WB ................................................... 37,4 / 32,8 °C
Coil L/s at Dec 1500 ............................................. 295 L/s Entering DB / WB ........................................... 24,3 / 18,7 °C
Max block L/s ....................................................... 295 L/s Leaving DB / WB ........................................... 14,7 / 14,2 °C
Sum of peak zone L/s ........................................... 295 L/s Coil ADP .................................................................. 13,6 °C
Sensible heat ratio .............................................. 0,752 Bypass Factor ........................................................ 0,100
m²/kW .................................................................... 6,6 Resulting RH .............................................................. 55 %
W/m² .................................................................. 150,5 Design supply temp. ................................................ 14,4 °C
Water flow @ 5,6 °K rise ....................................... 0,19 L/s Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ................................ 0,0 °K

Central Heating Coil Sizing Data

Max coil load ......................................................... 2,2 kW Load occurs at ................................................... Des Htg
Coil L/s at Des Htg ................................................ 295 L/s W/m² ........................................................................ 72,5
Max coil L/s .......................................................... 295 L/s Ent. DB / Lvg DB ............................................ 15,0 / 21,1 °C
Water flow @ 11,1 °K drop ................................... 0,05 L/s

Supply Fan Sizing Data

Actual max L/s ...................................................... 295 L/s Fan motor BHP ........................................................ 0,00 BHP
Standard L/s ......................................................... 292 L/s Fan motor kW .......................................................... 0,00 kW
Actual max L/(s-m²) .............................................. 9,84 L/(s-m²) Fan static ...................................................................... 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s ................................................... 17 L/s L/s/person ................................................................ 8,50 L/s/person
L/(s-m²) ................................................................. 0,57 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 3


Zone Sizing Summary for LT1 - Mr. Hasnan Room
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.27PM

Air System Information


Air System Name ................. LT1 - Mr. Hasnan Room Number of zones .......................................................... 1
Equipment Class ............................................ UNDEF Floor Area ................................................................ 30,0 m²
Air System Type ............................................. SZCAV Location ............................................. Depok, Indonesia

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing ................... Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing ............... Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 3,0 295 295 Jan 1700 0,0 30,0 9,84

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
LT1 - Mr. Hasnan Room 1 3,0 Jan 1700 295 0,0 30,0 9,84

Hourly Analysis Program v4.90 Page 2 of 3


Air System Design Load Summary for LT1 - Mr. Hasnan Room
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.27PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Dec 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 37,4 °C / 32,8 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 18 m² 749 - 18 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 30 m² 15 - 30 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 216 W 175 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 2100 W 1921 - 0 0 -
People 2 114 110 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 2975 110 - 0 0
Zone Conditioning - 3115 110 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 295 L/s 0 - 295 L/s 0 -
Ventilation Load 17 L/s 283 1008 17 L/s -79 -192
Supply Fan Load 295 L/s 0 - 295 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 3397 1118 - -79 -192
Central Cooling Coil - 3397 1118 - -2253 -192
Central Heating Coil - 0 - - 2174 -
>> Total Conditioning - 3397 1118 - -79 -192
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 3 of 3


Air System Sizing Summary for LT1 - Meeting Rooms
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.26PM

Air System Information


Air System Name ..................... LT1 - Meeting Rooms Number of zones .......................................................... 1
Equipment Class ............................................ UNDEF Floor Area ................................................................ 30,0 m²
Air System Type ............................................. SZCAV Location ............................................. Depok, Indonesia

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing ................... Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing ............... Individual peak space loads

Central Cooling Coil Sizing Data

Total coil load ........................................................ 9,7 kW Load occurs at ................................................. Dec 1600
Sensible coil load ................................................... 5,4 kW OA DB / WB ................................................... 37,1 / 32,7 °C
Coil L/s at Dec 1600 ............................................. 432 L/s Entering DB / WB ........................................... 25,8 / 21,2 °C
Max block L/s ....................................................... 432 L/s Leaving DB / WB ........................................... 15,4 / 15,0 °C
Sum of peak zone L/s ........................................... 432 L/s Coil ADP .................................................................. 14,3 °C
Sensible heat ratio .............................................. 0,555 Bypass Factor ........................................................ 0,100
m²/kW .................................................................... 3,1 Resulting RH .............................................................. 59 %
W/m² .................................................................. 322,2 Design supply temp. ................................................ 14,4 °C
Water flow @ 5,6 °K rise ....................................... 0,42 L/s Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ................................ 0,0 °K

Central Heating Coil Sizing Data

Max coil load ......................................................... 3,2 kW Load occurs at ................................................... Des Htg
Coil L/s at Des Htg ................................................ 432 L/s W/m² ...................................................................... 106,3
Max coil L/s .......................................................... 432 L/s Ent. DB / Lvg DB ............................................ 14,9 / 21,1 °C
Water flow @ 11,1 °K drop ................................... 0,07 L/s

Supply Fan Sizing Data

Actual max L/s ...................................................... 432 L/s Fan motor BHP ........................................................ 0,00 BHP
Standard L/s ......................................................... 428 L/s Fan motor kW .......................................................... 0,00 kW
Actual max L/(s-m²) ............................................ 14,40 L/(s-m²) Fan static ...................................................................... 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s ................................................... 68 L/s L/s/person ................................................................ 8,50 L/s/person
L/(s-m²) ................................................................. 2,27 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 3


Zone Sizing Summary for LT1 - Meeting Rooms
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.26PM

Air System Information


Air System Name ..................... LT1 - Meeting Rooms Number of zones .......................................................... 1
Equipment Class ............................................ UNDEF Floor Area ................................................................ 30,0 m²
Air System Type ............................................. SZCAV Location ............................................. Depok, Indonesia

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing ................... Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing ............... Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 4,4 432 432 Dec 1700 0,0 30,0 14,40

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
LT1 - Meeting Room 1 4,4 Dec 1700 432 0,0 30,0 14,40

Hourly Analysis Program v4.90 Page 2 of 3


Air System Design Load Summary for LT1 - Meeting Rooms
Project Name: HO PUSTEK PROJECT 02/26/2019
Prepared by: Sync 03.26PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Dec 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 37,1 °C / 32,7 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 39 m² 1663 - 39 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 30 m² 15 - 30 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 228 W 187 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 2100 W 1933 - 0 0 -
People 8 467 440 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 4265 440 - 0 0
Zone Conditioning - 4278 440 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 432 L/s 0 - 432 L/s 0 -
Ventilation Load 68 L/s 1086 3861 68 L/s -316 -768
Supply Fan Load 432 L/s 0 - 432 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 5364 4301 - -316 -768
Central Cooling Coil - 5364 4301 - -3506 -768
Central Heating Coil - 0 - - 3189 -
>> Total Conditioning - 5364 4301 - -316 -768
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 3 of 3


Air System Sizing Summary for LT2 STAFF ROOM
Project Name: HO PUSTEK PROJECT 02/16/2019
Prepared by: Sync 04:54PM

Air System Information


Air System Name LT2 STAFF ROOM Number of zones 1
Equipment Class UNDEF Floor Area 227.3 m²
Air System Type SZCAV Location Depok, INDONESIA

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 33.4 kW Load occurs at Mar 1700
Sensible coil load 22.8 kW OA DB / WB 35.6 / 32.0 °C
Coil L/s at Mar 1700 1945 L/s Entering DB / WB 24.6 / 19.3 °C
Max block L/s 1945 L/s Leaving DB / WB 14.8 / 14.3 °C
Sum of peak zone L/s 1945 L/s Coil ADP 13.7 °C
Sensible heat ratio 0.683 Bypass Factor 0.100
m²/kW 6.8 Resulting RH 56 %
W/m² 147.0 Design supply temp. 14.4 °C
Water flow @ 5.6 °K rise 1.44 L/s Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0.0 °K

Central Heating Coil Sizing Data


Max coil load 14.3 kW Load occurs at Des Htg
Coil L/s at Des Htg 1945 L/s W/m² 63.1
Max coil L/s 1945 L/s Ent. DB / Lvg DB 14.9 / 21.1 °C
Water flow @ 11.1 °K drop 0.31 L/s

Supply Fan Sizing Data


Actual max L/s 1945 L/s Fan motor BHP 0.00 BHP
Standard L/s 1926 L/s Fan motor kW 0.00 kW
Actual max L/(s-m²) 8.56 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 170 L/s L/s/person 8.50 L/s/person
L/(s-m²) 0.75 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 7


Ventilation Sizing Summary for LT2 STAFF ROOM
Project Name: HO PUSTEK PROJECT 02/16/2019
Prepared by: Sync 04:54PM

1. Summary
Ventilation Sizing Method Sum of Space OA Airflows
Design Ventilation Airflow Rate 170 L/s

2. Space Ventilation Analysis Table


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s-m²)) (L/s) (% of supply) (L/s)
Zone 1
LT2 STAFF ROOM 1 227.3 20.0 1945.4 0.00 0.00 170.0 0.0 170.0
Totals (incl. Space Multipliers) 1945.4 170.0

Hourly Analysis Program v4.90 Page 3 of 7


Air System Design Load Summary for LT2 STAFF ROOM
Project Name: HO PUSTEK PROJECT 02/16/2019
Prepared by: Sync 04:54PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Mar 1700 HEATING DATA AT DES HTG
COOLING OA DB / WB 35.6 °C / 32.0 °C HEATING OA DB / WB 25.0 °C / 21.0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 40 m² 5726 - 40 m² - -
Wall Transmission 159 m² 5709 - 159 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 40 m² 1573 - 40 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 2 m² 152 - 2 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 1170 W 975 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 4800 W 4444 - 0 0 -
People 20 1188 1100 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 19768 1100 - 0 0
Zone Conditioning - 20378 1100 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 1945 L/s 0 - 1945 L/s 0 -
Ventilation Load 170 L/s 2443 9477 170 L/s -790 -1920
Supply Fan Load 1945 L/s 0 - 1945 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 22821 10577 - -790 -1920
Central Cooling Coil - 22821 10582 - -15123 -1920
Central Heating Coil - 0 - - 14333 -
>> Total Conditioning - 22821 10582 - -790 -1920
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 4 of 7


Air System Sizing Summary for LT2 MEETING ROOM
Project Name: HO PUSTEK PROJECT 02/16/2019
Prepared by: Sync 04:53PM

Air System Information


Air System Name LT2 MEETING ROOM Number of zones 1
Equipment Class UNDEF Floor Area 12.5 m²
Air System Type SZCAV Location Depok, INDONESIA

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 7.8 kW Load occurs at Feb 1600
Sensible coil load 5.1 kW OA DB / WB 37.6 / 32.7 °C
Coil L/s at Feb 1600 433 L/s Entering DB / WB 24.9 / 19.7 °C
Max block L/s 433 L/s Leaving DB / WB 15.0 / 14.6 °C
Sum of peak zone L/s 433 L/s Coil ADP 13.9 °C
Sensible heat ratio 0.653 Bypass Factor 0.100
m²/kW 1.6 Resulting RH 57 %
W/m² 627.4 Design supply temp. 14.4 °C
Water flow @ 5.6 °K rise 0.34 L/s Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0.0 °K

Central Heating Coil Sizing Data


Max coil load 3.2 kW Load occurs at Des Htg
Coil L/s at Des Htg 433 L/s W/m² 255.5
Max coil L/s 433 L/s Ent. DB / Lvg DB 14.9 / 21.1 °C
Water flow @ 11.1 °K drop 0.07 L/s

Supply Fan Sizing Data


Actual max L/s 433 L/s Fan motor BHP 0.00 BHP
Standard L/s 429 L/s Fan motor kW 0.00 kW
Actual max L/(s-m²) 34.67 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 43 L/s L/s/person 8.50 L/s/person
L/(s-m²) 3.40 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 7


Ventilation Sizing Summary for LT2 MEETING ROOM
Project Name: HO PUSTEK PROJECT 02/16/2019
Prepared by: Sync 04:53PM

1. Summary
Ventilation Sizing Method Sum of Space OA Airflows
Design Ventilation Airflow Rate 43 L/s

2. Space Ventilation Analysis Table


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s-m²)) (L/s) (% of supply) (L/s)
Zone 1
LT2 MEETING ROOM 1 12.5 5.0 433.4 0.00 0.00 42.5 0.0 42.5
Totals (incl. Space Multipliers) 433.4 42.5

Hourly Analysis Program v4.90 Page 3 of 7


Air System Design Load Summary for LT2 MEETING ROOM
Project Name: HO PUSTEK PROJECT 02/16/2019
Prepared by: Sync 04:53PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Feb 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 37.6 °C / 32.7 °C HEATING OA DB / WB 25.0 °C / 21.0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 10 m² 1089 - 10 m² - -
Wall Transmission 36 m² 1363 - 36 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 10 m² 452 - 10 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 216 W 178 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1130 W 1040 - 0 0 -
People 5 292 275 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 4414 275 - 0 0
Zone Conditioning - 4411 275 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 433 L/s 0 - 433 L/s 0 -
Ventilation Load 43 L/s 714 2442 43 L/s -198 -480
Supply Fan Load 433 L/s 0 - 433 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 5125 2717 - -198 -480
Central Cooling Coil - 5125 2718 - -3392 -480
Central Heating Coil - 0 - - 3194 -
>> Total Conditioning - 5125 2718 - -198 -480
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 4 of 7


Air System Sizing Summary for RUANGAN PAK MAWI
Project Name: HO PUSTEK ET 02/16/2019
Prepared by: engineering 05:27PM

Air System Information


Air System Name RUANGAN PAK MAWI Number of zones 1
Equipment Class UNDEF Floor Area 16,8 m²
Air System Type SZCAV Location DEPOK, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 6,4 kW Load occurs at Feb 1500
Sensible coil load 4,3 kW OA DB / WB 38,0 / 32,8 °C
Coil L/s at Feb 1500 372 L/s Entering DB / WB 25,2 / 19,9 °C
Max block L/s 372 L/s Leaving DB / WB 15,5 / 15,0 °C
Sum of peak zone L/s 372 L/s Coil ADP 14,4 °C
Sensible heat ratio 0,667 Bypass Factor 0,100
m²/kW 2,6 Resulting RH 58 %
W/m² 383,9 Design supply temp. 14,4 °C
Water flow @ 5,6 °K rise 0,28 L/s Zone T-stat Check 0 of 1 OK
Max zone temperature deviation 0,1 °K

Central Heating Coil Sizing Data


Max coil load 2,7 kW Load occurs at Des Htg
Coil L/s at Des Htg 372 L/s W/m² 163,0
Max coil L/s 372 L/s Ent. DB / Lvg DB 14,9 / 21,1 °C
Water flow @ 11,1 °K drop 0,06 L/s

Supply Fan Sizing Data


Actual max L/s 372 L/s Fan motor BHP 0,00 BHP
Standard L/s 368 L/s Fan motor kW 0,00 kW
Actual max L/(s-m²) 22,12 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 34 L/s L/s/person 8,50 L/s/person
L/(s-m²) 2,02 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 3


Zone Sizing Summary for RUANGAN PAK MAWI
Project Name: HO PUSTEK ET 02/16/2019
Prepared by: engineering 05:27PM

Air System Information


Air System Name RUANGAN PAK MAWI Number of zones 1
Equipment Class UNDEF Floor Area 16,8 m²
Air System Type SZCAV Location DEPOK, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 3,8 372 372 Feb 1600 0,0 16,8 22,12

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
RUANGAN PAK MAWI 1 3,8 Feb 1600 372 0,0 16,8 22,12

Hourly Analysis Program v4.90 Page 2 of 3


Air System Design Load Summary for RUANGAN PAK MAWI
Project Name: HO PUSTEK ET 02/16/2019
Prepared by: engineering 05:27PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Feb 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 38,0 °C / 32,8 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 5 m² 528 - 5 m² - -
Wall Transmission 42 m² 1638 - 42 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 5 m² 209 - 5 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 216 W 175 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1100 W 1006 - 0 0 -
People 4 229 220 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 3786 220 - 0 0
Zone Conditioning - 3729 220 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 372 L/s 0 - 372 L/s 0 -
Ventilation Load 34 L/s 574 1926 34 L/s -158 -384
Supply Fan Load 372 L/s 0 - 372 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 4303 2146 - -158 -384
Central Cooling Coil - 4303 2146 - -2896 -384
Central Heating Coil - 0 - - 2738 -
>> Total Conditioning - 4303 2146 - -158 -384
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 3 of 3


Air System Sizing Summary for LT.3 STAFF ROOM
Project Name: HO PUSTEK ET 02/16/2019
Prepared by: engineering 06:17PM

Air System Information


Air System Name LT.3 STAFF ROOM Number of zones 1
Equipment Class UNDEF Floor Area 220,8 m²
Air System Type SZCAV Location DEPOK, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 23,4 kW Load occurs at Feb 1700
Sensible coil load 22,2 kW OA DB / WB 36,7 / 32,6 °C
Coil L/s at Feb 1700 2138 L/s Entering DB / WB 23,6 / 17,6 °C
Max block L/s 2138 L/s Leaving DB / WB 15,0 / 14,4 °C
Sum of peak zone L/s 2138 L/s Coil ADP 14,0 °C
Sensible heat ratio 0,952 Bypass Factor 0,100
m²/kW 9,5 Resulting RH 56 %
W/m² 105,8 Design supply temp. 14,4 °C
Water flow @ 5,6 °K rise 1,01 L/s Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0,0 °K

Central Heating Coil Sizing Data


Max coil load 1,7 kW Load occurs at Jul 0700
Coil L/s at Jul 0700 2138 L/s W/m² 7,6
Max coil L/s 2138 L/s Ent. DB / Lvg DB 17,1 / 17,8 °C
Water flow @ 11,1 °K drop 0,04 L/s

Supply Fan Sizing Data


Actual max L/s 2138 L/s Fan motor BHP 0,00 BHP
Standard L/s 2117 L/s Fan motor kW 0,00 kW
Actual max L/(s-m²) 9,68 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 0 L/s L/s/person 0,00 L/s/person
L/(s-m²) 0,00 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 3


Zone Sizing Summary for LT.3 STAFF ROOM
Project Name: HO PUSTEK ET 02/16/2019
Prepared by: engineering 06:17PM

Air System Information


Air System Name LT.3 STAFF ROOM Number of zones 1
Equipment Class UNDEF Floor Area 220,8 m²
Air System Type SZCAV Location DEPOK, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 21,9 2138 2138 Feb 1700 0,0 220,8 9,68

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
LT 3 STAFF ROOM 1 21,9 Feb 1700 2138 0,0 220,8 9,68

Hourly Analysis Program v4.90 Page 2 of 3


Air System Design Load Summary for LT.3 STAFF ROOM
Project Name: HO PUSTEK ET 02/16/2019
Prepared by: engineering 06:17PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Feb 1700 HEATING DATA AT DES HTG
COOLING OA DB / WB 36,7 °C / 32,6 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 16 m² 2013 - 16 m² - -
Wall Transmission 174 m² 7598 - 174 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 16 m² 688 - 16 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 1008 W 840 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 10118 W 9367 - 0 0 -
People 20 1188 1100 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 170 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 21863 1100 - 0 0
Zone Conditioning - 22225 1100 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 2138 L/s 0 - 2138 L/s 0 -
Ventilation Load 0 L/s 0 0 0 L/s 0 0
Supply Fan Load 2138 L/s 0 - 2138 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 22225 1100 - 0 0
Central Cooling Coil - 22225 1129 - 0 0
Central Heating Coil - 0 - - 0 -
>> Total Conditioning - 22225 1129 - 0 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 3 of 3


Air System Sizing Summary for LT4 Space Room
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

Air System Information


Air System Name LT4 Space Room Number of zones 1
Equipment Class SPLT AHU Floor Area 185,0 m²
Air System Type SZCAV Location Depok, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 10,9 kW Load occurs at Dec 1500
Sensible coil load 5,4 kW OA DB / WB 35,4 / 32,8 °C
Coil L/s at Dec 1500 443 L/s Entering DB / WB 25,9 / 22,0 °C
Max block L/s 443 L/s Leaving DB / WB 15,7 / 15,4 °C
Sum of peak zone L/s 443 L/s Coil ADP 14,5 °C
Sensible heat ratio 0,496 Bypass Factor 0,100
m²/kW 16,9 Resulting RH 61 %
W/m² 59,1 Design supply temp. 14,4 °C
Water flow @ 5,6 °K rise N/A Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0,0 °K

Central Heating Coil Sizing Data


Max coil load 3,3 kW Load occurs at Des Htg
Coil L/s at Des Htg 443 L/s W/m² 17,7
Max coil L/s 443 L/s Ent. DB / Lvg DB 14,9 / 21,1 °C
Water flow @ 11,1 °K drop N/A

Supply Fan Sizing Data


Actual max L/s 443 L/s Fan motor BHP 0,00 BHP
Standard L/s 439 L/s Fan motor kW 0,00 kW
Actual max L/(s-m²) 2,39 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 85 L/s L/s/person 8,50 L/s/person
L/(s-m²) 0,46 L/(s-m²)

Hourly Analysis Program v4.90 Page 13 of 18


Zone Sizing Summary for LT4 Space Room
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

Air System Information


Air System Name LT4 Space Room Number of zones 1
Equipment Class SPLT AHU Floor Area 185,0 m²
Air System Type SZCAV Location Depok, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 4,5 443 443 Dec 1000 0,0 185,0 2,39

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
LT4 Space Room 1 4,5 Dec 1000 443 0,0 185,0 2,39

Hourly Analysis Program v4.90 Page 14 of 18


Air System Design Load Summary for LT4 Space Room
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Dec 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 35,4 °C / 32,8 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 9 m² 1634 - 9 m² - -
Wall Transmission 22 m² 390 - 22 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 9 m² 328 - 9 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 1152 W 932 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 593 W 543 - 0 0 -
People 10 571 550 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 4399 550 - 0 0
Zone Conditioning - 4229 550 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 443 L/s 0 - 443 L/s 0 -
Ventilation Load 85 L/s 1197 4953 85 L/s -396 -962
Supply Fan Load 443 L/s 0 - 443 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 5426 5503 - -396 -962
Central Cooling Coil - 5426 5503 - -3671 -962
Central Heating Coil - 0 - - 3274 -
>> Total Conditioning - 5426 5503 - -396 -962
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 15 of 18


Air System Sizing Summary for L4 Praying Room Man
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

Air System Information


Air System Name L4 Praying Room Man Number of zones 1
Equipment Class SPLT AHU Floor Area 18,0 m²
Air System Type SZCAV Location Depok, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 5,9 kW Load occurs at Jan 1500
Sensible coil load 2,3 kW OA DB / WB 36,0 / 32,8 °C
Coil L/s at Jan 1500 139 L/s Entering DB / WB 28,9 / 25,8 °C
Max block L/s 139 L/s Leaving DB / WB 15,4 / 15,4 °C
Sum of peak zone L/s 139 L/s Coil ADP 13,9 °C
Sensible heat ratio 0,381 Bypass Factor 0,100
m²/kW 3,0 Resulting RH 64 %
W/m² 328,7 Design supply temp. 14,4 °C
Water flow @ 5,6 °K rise N/A Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0,0 °K

Central Heating Coil Sizing Data


Max coil load 1,0 kW Load occurs at Des Htg
Coil L/s at Des Htg 139 L/s W/m² 57,6
Max coil L/s 139 L/s Ent. DB / Lvg DB 14,9 / 21,1 °C
Water flow @ 11,1 °K drop N/A

Supply Fan Sizing Data


Actual max L/s 139 L/s Fan motor BHP 0,00 BHP
Standard L/s 138 L/s Fan motor kW 0,00 kW
Actual max L/(s-m²) 7,74 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 60 L/s L/s/person 8,50 L/s/person
L/(s-m²) 3,31 L/(s-m²)

Hourly Analysis Program v4.90 Page 7 of 18


Zone Sizing Summary for L4 Praying Room Man
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

Air System Information


Air System Name L4 Praying Room Man Number of zones 1
Equipment Class SPLT AHU Floor Area 18,0 m²
Air System Type SZCAV Location Depok, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 1,4 139 139 Dec 1500 0,0 18,0 7,74

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
L4 Praying Room Man 1 1,4 Dec 1500 139 0,0 18,0 7,74

Hourly Analysis Program v4.90 Page 8 of 18


Air System Design Load Summary for L4 Praying Room Man
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jan 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 36,0 °C / 32,8 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 2 m² 383 - 2 m² - -
Wall Transmission 28 m² 489 - 28 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 2 m² 85 - 2 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 90 W 73 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 10 W 10 - 0 0 -
People 7 373 315 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 1414 315 - 0 0
Zone Conditioning - 1375 315 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 139 L/s 0 - 139 L/s 0 -
Ventilation Load 60 L/s 879 3349 60 L/s -277 -672
Supply Fan Load 139 L/s 0 - 139 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 2254 3664 - -277 -672
Central Cooling Coil - 2254 3664 - -1314 -672
Central Heating Coil - 0 - - 1038 -
>> Total Conditioning - 2254 3664 - -277 -672
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 9 of 18


Air System Sizing Summary for L4 Praying Room Girl
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

Air System Information


Air System Name L4 Praying Room Girl Number of zones 1
Equipment Class SPLT AHU Floor Area 13,5 m²
Air System Type SZCAV Location Depok, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 3,8 kW Load occurs at Dec 1500
Sensible coil load 1,2 kW OA DB / WB 35,4 / 32,8 °C
Coil L/s at Dec 1500 43 L/s Entering DB / WB 35,4 / 32,8 °C
Max block L/s 43 L/s Leaving DB / WB 12,6 / 13,5 °C
Sum of peak zone L/s 43 L/s Coil ADP 10,0 °C
Sensible heat ratio 0,306 Bypass Factor 0,100
m²/kW 3,6 Resulting RH 65 %
W/m² 281,0 Design supply temp. 14,4 °C
Water flow @ 5,6 °K rise N/A Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0,0 °K

Central Heating Coil Sizing Data


Max coil load 0,3 kW Load occurs at Des Htg
Coil L/s at Des Htg 43 L/s W/m² 23,9
Max coil L/s 43 L/s Ent. DB / Lvg DB 14,8 / 21,1 °C
Water flow @ 11,1 °K drop N/A

Supply Fan Sizing Data


Actual max L/s 43 L/s Fan motor BHP 0,00 BHP
Standard L/s 42 L/s Fan motor kW 0,00 kW
Actual max L/(s-m²) 3,15 L/(s-m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 43 L/s L/s/person 8,50 L/s/person
L/(s-m²) 3,15 L/(s-m²)

Hourly Analysis Program v4.90 Page 1 of 18


Zone Sizing Summary for L4 Praying Room Girl
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

Air System Information


Air System Name L4 Praying Room Girl Number of zones 1
Equipment Class SPLT AHU Floor Area 13,5 m²
Air System Type SZCAV Location Depok, Indonesia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m²) L/(s-m²)
Zone 1 0,3 43 43 Jan 1700 0,0 13,5 3,15

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s-m²)
Zone 1
LT4 Praying Room Girl 1 0,3 Jan 1700 43 0,0 13,5 3,15

Hourly Analysis Program v4.90 Page 2 of 18


Air System Design Load Summary for L4 Praying Room Girl
Project Name: HO Pustek Project 02/16/2019
Prepared by: indo-hvac 05:00PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Dec 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 35,4 °C / 32,8 °C HEATING OA DB / WB 25,0 °C / 21,0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 0 m² 0 - 0 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 72 W 58 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 10 W 10 - 0 0 -
People 5 267 225 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 335 225 - 0 0
Zone Conditioning - 325 225 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 43 L/s 0 - 43 L/s 0 -
Ventilation Load 43 L/s 607 2407 43 L/s -198 -481
Supply Fan Load 43 L/s 0 - 43 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 932 2632 - -198 -481
Central Cooling Coil - 1162 2632 - -520 -481
Central Heating Coil - -230 - - 322 -
>> Total Conditioning - 932 2632 - -198 -481
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v4.90 Page 3 of 18

Vous aimerez peut-être aussi